An ongoing study at the Spallation Neutron Source (SNS) seeks to better understand and address potential multipacting issues associated with the Drift Tube Linac (DTL) RF vacuum windows. An analysis of several failed operational windows showed indications of excessive RF heating on the TiN-coated alumina ceramics. Coupled with vacuum bursts and arcing during conditioning and/or operational periods, these problems have been attributed to electron activity likely caused by multipacting. The status of the study, 3-D electromagnetic simulation results, mitigating techniques and a future experimental plan for studying multipacting in the SNS DTL vacuum windows are presented.
Multipacting in accelerating structures is a complex phenomenon with which there is much to be understood. While multipacting research efforts have primarily been focused on superconducting radio frequency (SRF) systems, normal conducting accelerating structures that have a higher thermal capacity and a greater vacuum pressure tolerance could benefit from additional investigation. This research details multipacting simulation methods and the results of 3-D electromagnetic simulations of RF vacuum windows used on normal conducting linac (NCL) cavities. Possible techniques for reducing and eliminating multipacting activities in these structures are discussed.
Multipacting in accelerating structures is a complex phenomenon about which there is much to be understood. While multipacting research efforts have primarily been focused on superconducting radio frequency (SRF) systems, normal conducting accelerating structures which have a higher thermal capacity, and a greater vacuum pressure tolerance could benefit from additional investigation. This research details multipacting simulation methods and the results of 3-D electromagnetic simulations of RF vacuum windows used on normal conducting linac (NCL) cavities. Benchmarking of the peak electric fields in these structures, benefits of material processing and possible techniques for reducing or eliminating multipacting activities are discussed.
High power RF couplers connect transmission lines to cavities, providing power used to accelerate particle beam • Coupler also provides vacuum barrier for beam vacuum via RF windows • RF windows experience breakdown at much lower voltages than comparable insulators in DC fields • For large voltages, electron emission from “triple junction” and multipacting lead to window failure due to arching and/or thermal runaway.
The RF Test Facility (RFTF) at the Spallation Neutron Source (SNS) is used for the conditioning of RF compo-nents such as ceramic vacuum windows and power cou-plers prior to their installation in the H- ion linear accel-erator. This process exposes components to high-power RF fields and thermal cycling to improve performance and remove surface impurities. To automate and optimize this process, a Python-based EPICS control system was developed alongside targeted hardware upgrades. The system enables real-time monitoring and control of RF power levels, temperature, and vacuum pressure. A user-friendly graphical interface was implemented using CS-Studio (Phoebus), allowing operators to adjust parameters and collect data efficiently. The system integrates a High-Power Protection Module (HPM) for interlocks based on vacuum and arc detection, ensuring safe operation. These upgrades have significantly improved the efficiency, accuracy, and safety of RF conditioning at the SNS RFTF. This paper describes the updated RF conditioning sys-tem, highlighting the software and hardware develop-ments and their application in support of the Proton Pow-er Upgrade (PPU) project.
Multipactor emission can be a serious issue for vacuum electron devices operating at megawatt power levels. It can lead to catastrophic failure from surface arcs or excessive heating of ceramic windows. Titanium nitride is effective at suppressing multipactor emission; however, sputter coating is not strongly bonded to surfaces and issue related to lifetime have arisen. It’s difficult to ensure a uniform coating over large surfaces. This research investigated atomic layer deposition (ALD) as an improved alternative to sputtered coatings. Test windows were fabricated and coated with TiN using ALD, then tested for RF loss and secondary emission. All ALD samples showed RF loss less than 0.01dB with secondary emission yield equal to or better than reported measurements with sputter coated windows. The program also designed a preliminary ALD system capable of coating windows up to 24 inches in diameter.
The Materials Plasma Exposure eXperiment (MPEX) has been designed as a linear plasma divertor simulator in order to address plasma material interaction (PMI) science for next-generation fusion devices. It will have the capability to test neutron irradiated samples with plasma fluxes of greater than 10 24 m -2 s -1 . It is expected to operate steady state for up to 10 6 s to consider PMI affects through reactor end of life. The conceptual design of MPEX was completed in 2019, with preliminary design having begun in 2020. The plasma source for MPEX is a helicon antenna, where the energized helical antenna sits outside of the vacuum in order to minimize impurities in the plasma. It is expected to receive up to 200 kW of continuous power, and so the antenna and the window must be actively cooled. The water-cooled copper antenna has been operated at full power on the Proto-MPEX device (which is a test facility to demonstrate the plasma source and heating systems). The water-cooled window, however, is a novel component that must meet numerous competing requirements. It requires a low dielectric loss to allow the Radio Frequency (RF) power to create the plasma within the vacuum boundary. It must be structurally robust to handle the significant heat flux from the plasma and any heat from dielectric coupling. It must be compatible with the coolant (preferably water). It requires a vacuum seal that minimizes impurities into the plasma and does not compromise the structural integrity of the window. Two window designs have been tested. Results from these tests, where temperatures are measured and heat fluxes inferred from infrared camera data, have been correlated with thermal-structural simulations. When these simulations are extrapolated to the full power steady-state heat fluxes that are expected in MPEX, the designs do not appear to have the necessary structural robustness. This study explores design alternatives for the MPEX helicon antenna window, presents analysis results for several of the alternatives, and shows a viable solution that satisfies the requirements for MPEX operation.
Plasma production and ion heating in the Material Plasma Exposure eXperiment (MPEX), whose design is nearing completion, is accomplished using continuous wave RF power with average power density up to 1.6 MW/m2 at the plasma interface. Plasma is produced using helicon waves coupled through a single helical antenna at 13.56 MHz with power supplied by three 100 kW fixed-frequency RF generators feeding a power combiner network followed by the matching network and launcher. The helicon source can utilize various gasses including hydrogen, deuterium, and helium, with a magnetic field strength in the source region up to 0.2 T, and maximum device |B| of 2.5 T. Power is coupled to ions via ion cyclotron heating at the fundamental resonance using a pair of phased helical antennas operating in the frequency range 4-9 MHz, that launch waves towards the resonance from the antenna region where ω > ωci. ICH power is supplied by a single 500 kW tunable RF transmitter through a 90° power splitter and matching/decoupling network. In the case of both the helicon and ICH systems the antennas are located external to the vacuum, with power transferred through novel water-cooled coaxial vacuum windows consisting of fused quartz outer cylinders and silicon nitride inner cylinders with forced convection water cooling between them. The antenna enclosures are pressurized with dry air to 3 bar absolute for voltage standoff.Several 3-D COMSOL models have been created to simulate the two systems. A model of the helicon region utilizing a cold plasma dielectric tensor with accurate magnetic field and realistic plasma density profiles has been used to calculate the plasma loading/complex antenna input impedance at the launcher feed for various ne and |B| values, for the purpose of estimating power handling. It also incorporates the geometry of all launcher structures relevant to this determination. A still more detailed model of the launcher together with a lossy dielectric plasma surrogate has been used to determine RF electric field values and power losses in the device components.Similar models have been produced to predict the performance and power handling of the ICH launcher. For this device the impedance matrix of the two-element antenna array is calculated using a warm plasma model, necessary to properly determine the wave propagation and absorption.
Proto-MPEX (Materials Plasma Exposure eXperiment), a linear plasma device (LPD), using a high power radio frequency (RF) (⩾100 kW, 13.56 MHz) helicon plasma source, has suffered RF sheath-induced window erosion. The sputtered impurities from the window surface transport toward the downstream target affecting plasma-material interaction studies. The rectified sheath voltage formed was high enough to cause window erosion by light ions due to its low-Z components (e.g. Si 3 N 4 and AlN). Hence, we are proposing impurity mitigation strategies, which involve the application of a Faraday screen to lower the rectified sheath voltage and the application of high-Z refractory coatings on the existing window plasma-facing surface. In this work, we report the erosion of two different coatings, i.e., tantalum oxide (Ta 2 O 5 ) and hafnium oxide (HfO 2 ) on a silicon nitride (Si 3 N 4 ) window material under conditions of low-energy deuterium (D) ion impact, well below the Ta 2 O 5 sputtering energy threshold (i.e. 250 eV). The test samples were RF-biased and exposed to a high D-ion fluence (∼10 26 m −2 ) in Plasma Interaction with Surface Component Experimental Station (PISCES-A) LPD. The experimentally measured sputtering yields of the high-Z refractory coatings below the sputtering energy threshold of Ta 2 O 5 indicate an increased erosion due to the plasma impurities, especially due to oxygen. Improving the vacuum level could reduce the oxygen impurities and increase the lifespan of the coated helicon window for plasma operation. Post-surface analysis indicates no preferential erosion of oxygen or enrichment of the high-Z surface component. This is likely due to an effective energy transfer from the impurity ion for sputtering of the high-Z component in the coating. With the reduced rectified sheath voltage at the window surface and improved vacuum conditions, the proposed high-Z refractory coatings offer a promising solution for reducing window erosion in future MPEX plasma operations at ORNL.
650 MHz fundamental power couplers were developed for PIP-II project to deliver RF power for low-beta and high-beta elliptical cavities. Few prototypes were built and tested and after some modification we built 8 pre-production couplers (with few spares for vacuum side) for HB650 cryomodule. All couplers were successfully tested in pulse mode (up to 100kW) and in CW mode (up to 50kW) in test stand at full reflection at 8 phases. In baseline configuration with DC bias we do not see any multipactoring activity after short processing. We also tested power processing without bias for uncoated and TiN coated ceramic window. Results of these studies presented in this paper. One of the coupler was assembled on LB650 cavity and tested at cryogenic environment in STC cryostat at ~20kW power with full reflection at different reflection phase. We also demonstrated good result from power processing without bias for warm and cold cavity. Six couplers were assembled on HB650 cavities in pre-production cryomodule. Test results from cryomodule qualification is discussing in this paper.