Search NASA⌕ Search

SEARCH · Search NASA

Results for “RI/FS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

100-BC-5 Operable Unit, Batch Leach Analyses and Report for Sediments at RI/FS Wells C7508, C7783, C7784, C7785, and C7787

This is an analytical data report for sediment samples from the 100 BC Operable unit. This report contains the updated dates for samples associated with Hexavalent Chromium/Soil analysis. Between August 24, 2010 and March 3, 2011 sediment samples were received from 100-BC Decision Unit Soil for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

100 BC, Kd, sediment charaterization↗

Data Package of Samples Collected for Hydrogeologic and Geochemical Characterization: 300 Area RI/FS Sediment Cores

This is a data package for sediment samples received from the 300 FF 5 OU. This report was prepared for CHPRC. Between August 16, 2010 and April 25, 2011 sediment samples were received from 300-FF-5 for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

300 Area, Charaterization, Sediment↗

Soil Desiccation Treatability Testing at BC Waste Disposal Cribs

During Hanford’s production period, low-level waste products generated from chemical processing of uranium fuel rods were discharged directly to the ground through a system of cribs and trenches located in the 200-BC-1 Operable Unit (OU). The site consists of 6 cribs and 20 trenches that received more than 117,000 m3 of radioactive liquid waste discharged to the soil. These unlined infiltration galleries held volumes of liquid waste while it seeped into the ground, with the understanding that the 100 m (330 ft) thick vadose zone in the area would effectively capture the effluent and prevent groundwater impacts. A conceptual model showing the operation of cribs and trenches is shown in Figure 1. Data show effluent from the 26 cribs and trenches containing about 410 curies of Technetium-99 (Tc-99) is primarily located between 30 m and 70 m (98 ft and 230 ft) depth (Corbin et al., 2005; Ward et al., 2004). Despite no evidence indicating that the contamination has reached the groundwater at BC cribs and trenches, the mobility of Tc-99 had been demonstrated in laboratory tests and was recognized as a threat to groundwater at the site. Using data from numerical models, laboratory analyses, field investigations, and information on historical discharges, the EPA and Ecology identified Tc-99 and U contamination of the vadose zone as a remediation priority. The U.S. DOE was notified by EPA and Ecology regarding risks associated with Tc-99 contamination in a letter requesting development of a strategy for improved methods to understand the nature and extent of vadose zone contamination, specifically Tc-99, and to develop remedial options for addressing such contamination. To develop the appropriate technology for characterizing, remediating, and monitoring the deep vadose zone Tc-99 contamination, the U.S. DOE worked with the EPA and Ecology to create a Treatability Test Plan under a Remedial Investigation/Feasibility Study (RI/FS) for the Hanford 200 Areas. Under this RI/FS, it was determined that a treatability test for soil desiccation should be carried out as it was identified as a promising in-situ treatment technology for mitigating risks posed by Tc-99 contamination to the groundwater table. The BC Cribs and Trenches site was identified as a representative site for Tc-99 and U contamination and selected for the soil desiccation treatability test. In this chapter, we summarize the overlying regulatory framework of RI/FS and treatability tests and illustrate how development and experimentation supported the evaluation of selected remedies. We briefly discuss the RI/FS for the 200 Areas of the Hanford Site and focus on the soil desiccation treatability testing performed at the BC cribs and trenches site under the Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau (DVZ-TT). The DVZ-TT is one component of the remedial investigation/feasibility study for the Hanford 200 Areas and represents the underlying regulatory framework that drives site operations towards records of decision and site closure.

Mangel, Adam R.↗

Effect of Selected Modeling Assumptions on Subsurface Radionuclide Transport Projections for the Potential Environmental Management Disposal Facility at Oak Ridge, Tennessee

The Department of Energy’s Office of Environmental Management recently revised a Remedial Investigation/ Feasibility Study (RI/FS) that included an analysis of subsurface radionuclide transport at a potential new Environmental Management Disposal Facility (EMDF) in East Bear Creek Valley near Oak Ridge, Tennessee. The effect of three simplifying assumptions used in the RI/FS analyses are investigated using the same subsurface pathway conceptualization but with more flexible modeling tools. Neglect of vadose zone dispersion was found to be conservative or non-conservative, depending on the retarded travel time and the half-life. For a given equilibrium distribution coefficient, a relatively narrow range of half-life was identified for which neglect of vadose zone transport is non-conservative and radionuclide discharge into surface water is non-negligible. However, there are two additional conservative simplifications in the reference case that compensate for the non-conservative effect of neglecting vadose zone dispersion: the use of a steady infiltration rate and vadose zone velocity, and the way equilibrium sorption is used to represent transport in the fractured material of the saturated aquifer. With more realistic representations of all three processes, the RI/FS reference case was found to either provide a reasonably good approximation to the peak concentration or was significantly conservative (pessimistic) for all parameter combinations considered.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated Conceptual Model for the 300 Area Uranium Groundwater Plume

The 300 Area uranium groundwater plume in the 300-FF-5 Operable Unit is residual from past discharge of nuclear fuel fabrication wastes to a number of liquid (and solid) disposal sites. The source zones in the disposal sites were remediated by excavation and backfilled to grade, but sorbed uranium remains in deeper, unexcavated vadose zone sediments. In spite of source term removal, the groundwater plume has shown remarkable persistence, with concentrations exceeding the drinking water standard over an area of approximately 1 km2. The plume resides within a coupled vadose zone, groundwater, river zone system of immense complexity and scale. Interactions between geologic structure, the hydrologic system driven by the Columbia River, groundwater-river exchange points, and the geochemistry of uranium contribute to persistence of the plume. The U.S. Department of Energy (DOE) recently completed a Remedial Investigation/Feasibility Study (RI/FS) to document characterization of the 300 Area uranium plume and plan for beginning to implement proposed remedial actions. As part of the RI/FS document, a conceptual model was developed that integrates knowledge of the hydrogeologic and geochemical properties of the 300 Area and controlling processes to yield an understanding of how the system behaves and the variables that control it. Recent results from the Hanford Integrated Field Research Challenge site and the Subsurface Biogeochemistry Scientific Focus Area Project funded by the DOE Office of Science were used to update the conceptual model and provide an assessment of key factors controlling plume persistence.

300 Area↗

100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Transmittal of the Calculation Package that Supports the Analysis of Performance of the Environmental Management Waste Management Facility Oak Ridge, Tennessee (Based 5-Cell Design Issued 8/14/09)

This document presents the results of an assessment of the performance of a build-out of the Environmental Management Waste Management Facility (EMWMF). The EMWMF configuration that was assessed includes the as-constructed Cells 1 through 4, with a groundwater underdrain that was installed beneath Cell 3 during the winter of 2003-2004, and Cell 5, whose proposed design is an Addendum to Remedial Design Report for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee, DOE/OR/01-1873&D2/A5/R1. The total capacity of the EMWMF with 5 cells is about 1.7 million cubic yards. This assessment was conducted to determine the conditions under which the approved Waste Acceptance Criteria (WAC) for the EMWMF found in the Attainment Plan for Risk/Toxicity-Based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee [U.S. Department of Energy (DOE) 2001a], as revised for constituents added up to October 2008, would remain protective of public health and safety for a five-cell disposal facility. For consistency, the methods of analyses and the exposure scenario used to predict the performance of a five-cell disposal facility were identical to those used in the Remedial Investigation and Feasibility Study (RI/FS) and its addendum (DOE 1998a, DOE 1998b) to develop the approved WAC. To take advantage of new information and design changes departing from the conceptual design, the modeling domain and model calibration were upaded from those used in the RI/FS and its addendum. It should be noted that this analysis is not intended to justify or propose a change in the approved WAC.

54 ENVIRONMENTAL SCIENCES↗

Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation/feasibility study (RI/FS) reports developed for upland areas, riparian areas, and groundwater in the Hanford Site River Corridor. The RI/FS reports will evaluate the impacts to soil, groundwater, and river sediments and lead to proposed cleanup actions and records of decision to address releases from the Hanford Site reactor operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

100-F Target Analyte List Development for Soil

This report documents the process used to identify source area target analytes in support of the 100-F Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

100-F↗

100-N Area Decision Unit Target Analyte List Development for Soil

This report documents the process used to identify source area target analytes in support of the 100-N Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

100-N↗

100-K Target Analyte List Development for Soil

This report documents the process used to identify source area target analytes in support of the 100-K Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

100-K↗

Enhanced Attenuation of Uranium in the Subsurface

Over time, the focus for the Hanford Site has moved from production to decommissioning and site remediation. Several hundred metric tons of near-surface vadose zone sediment have been excavated from the 300 Area in an effort to remove the source of the uranium contamination (DOE/RL, 2011). Despite remediation efforts, uranium continues to be problematic with concentrations greater than the maximum contaminant level (MCL, which is 30 µg/L) for drinking water. Due to the close proximity of the Columbia River, the uranium continues to be a focus of investigation and remediation. After finding that the uranium concentrations were not decreasing as quickly as expected (based on the 1996 ROD) the Tri-Parties set new milestones, including an update of the conceptual model for the 300 Area uranium plume (Williams et al., 2007). In order to more accurately complete a feasibility study and identify how to remediate the uranium in the groundwater, the DOE authorized a remedial investigation/feasibility study (RI/FS). RI/FSs are designed to screen technologies to determine effectiveness, implementability, and cost (see Chapter 2b). These studies are designed to be conducted concurrently as part of the CERCLA process, so the data collected during site characterization (part of the RI) can inform the treatability studies and field tests conducted under the FS (EPA 1988). For the 300 Area, this study included laboratory, field, and modeling components as well as additional sediment and groundwater characterization to determine a suitable remediation strategy to reduce the uranium concentration in the groundwater plume within the expected time frame and cost.

300 area, uranium, polyphosphate, Hanford book pro↗

Identification of 300 Area Contaminants of Potential Concern for Soil

This report documents the process used to identify source area contaminants of potential concern (COPCs) in support of the 300 Area remedial investigation/feasibility study (RI/FS) work plan. This report also establishes the exclusion criteria applicable for 300 Area use and the analytical methods needed to analyze the COPCs.

54 ENVIRONMENTAL SCIENCES↗

Technical evaluation of soil remediation alternatives at the building 812 operable unit, lawrence livermore national laboratory site 300

The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Work Plan: ISCR Pilot Test at Montgomery City, Missouri

This document presents a Work Plan for field-scale pilot testing of an in situ chemical reduction (ISCR) technology for the treatment of carbon tetrachloride contamination identified in soils and groundwater at the site of the grain storage facility formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Montgomery City, Missouri. The pilot test is recommended to support the identification and evaluation of candidate remedial technologies for possible implementation at the former Montgomery City facility, in the context of the site characterization (remedial investigation/feasibility study [RI/FS]) being conducted by the CCC/USDA at this location at the request of the Missouri Department of Natural Resources (MDNR).

LaFreniere, L. M.↗

Niagara Falls Storage Site - Balance of plant investigation results - 15432

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U. S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper details recent investigations into the underground utilities, groundwater/soil contamination, and past storage of contaminated material on the Balance of Plant Operable Unit of the NFSS. Recent fieldwork activities have investigated areas of elevated groundwater contamination as well as an investigation to determine/eliminate any preferential pathway that historical underground utilities may have provided on-site in these areas. Additional areas of investigation included strategic placement of groundwater wells at locations of historic residue storage piles and intersections of various underground utilities (based on aerial photography and geophysical surveys). Several hundred locations across the site were investigated with a gamma walk-over survey, boring, surveying and sampling of soil-cores to aide in the delineation of soil contamination throughout the Balance of Plant Operable Unit. The series of investigations indicated multiple operational areas still have impacts above background conditions, risk-based concentrations, and promulgated maximum contaminant levels for multiple media in the Balance of Plant Operable Unit. The soil, groundwater, sediment, and utility sampling data show that 1) radionuclide impacts derived from ore-residue handling operations still exist, 2) impacts from other inorganic and organic compound exist in TNT manufacturing and support areas, and 3) contaminant transport from past source areas is minimal. The full compendium of site history and recent sampling data provides a well-defined conceptual site model that provides the necessary input data to prepare volumetric soil estimates for the Balance of Plant Operable Unit Feasibility Study. The scale of the NFSS and complexity of prior operations provide many remedial challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Niagara Falls Storage Site - Interim Waste Containment Structure - 16199

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U.S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper will discuss the following: - Provide background information on the NFSS including the nature of the materials within the IWCS. - Explain the steps of the CERCLA and associated processes the Formerly Utilized Sites Remedial Action Program (FUSRAP) employs. - Describe the OUs for the NFSS property and the subunit designations used in the FS evaluations for the IWCS OU. - Provide the current project status within the CERCLA framework and path forward for all OUs and Vicinity Properties (VPs). Identify the Applicable or Relevant and Appropriate Requirements (ARARs) preferred by USACE and the regulatory agencies and explain the differences between the two positions. - Provide the comparative evaluation of the remedial alternatives assessed in the FS. - Identify the justifications for the USACE - Buffalo District selecting the preferred remedial alternative within the Proposed Plan. The remedial action objectives for the IWCS OU are designed to provide short- and long-term protection of human health and the environment. CERCLA requires that any action taken be protective of human health and the environment as well as be compliant with identified ARARs. USACE evaluated 'No Action' and four potential remedial alternatives for the IWCS OU that ranged from leaving all of the wastes in-place and installing a final cover to partial and full removal of the contents. The four alternatives met the remedial action objectives defined identified for the IWCS OU. In accordance with the statutory requirements of CERCLA Section 121, remedial alternatives must comply with two threshold criteria, overall protection of human health and the environment and compliance with ARARs, in order to be carried forward for further evaluation. If a remedial alternative meets the threshold criteria, it is evaluated against the following five balancing criteria: - Long-term effectiveness and permanence; - Reduction in toxicity, mobility, or volume through treatment; - Short-term effectiveness; - Implementability; and, - Cost. The Feasibility Study evaluation led to the preferred remedial alternative selection and this will be the focus of this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗