Dose reconstruction for plutonium-239 intakes at the Rocky Flats Plant

Purpose: The Rocky Flats (RF) Plant was a weapons manufacturing facility that operated from the early 1950s to 1989. Its primary missions were the production of plutonium (Pu) pits for thermonuclear weapons and the processing of retired weapons for Pu recovery. The purpose of this study was to estimate radiation doses to a cohort of 4499 RF workers from an intake of 239 Pu, the primary plutonium isotope handled at the site. Materials and methods: The latest biokinetic models of the International Commission on Radiological Protection, or site-specific variations of those models, were used to estimate 239 Pu intakes for each worker based on model fits to bioassay data often coupled with lung measurements. Results: Urinary excretion and lung retention data for most 239 Pu intakes could be fit reasonably well by a mixture of Pu dioxide and moderately soluble material. For some workers, better fits were obtained by application of other absorption types including Type S, 239 Pu nitrate, or pure 239 Pu dioxide, or by assuming intake via a wound. The lungs typically received the highest tissue doses, with fifty-year committed equivalent doses in the range of 0.5–1 Sv for 275 workers, 1–5 Sv for 115 workers, and greater than 5 Sv for 12 workers. Conclusions: RF was a unique site regarding a large number of lung measurements available for determining the appropriate absorption types for inhaled material. Further, this provided higher confidence in reconstructed 239 Pu doses than is generally gained from urinary data alone.

61 RADIATION PROTECTION AND DOSIMETRY↗

Mortality among workers at the Rocky Flats Plant, 1951–2017

The Rocky Flats (RFs) Plant operated from 1951–1989 as part of the U.S. Department of Energy (DOE) nuclear complex. Its primary mission was weapons component fabrication, whereby workers were potentially exposed to radioactive and non-radioactive hazards. RF worker mortality was compared to the general population, and dose-response relationships between mortality and radiation organ doses were examined. RF workers first employed between 1951 and 1979 for ⩾30 d were identified (n = 9397). Vital status was determined using national and state death records up to 2017. Organ doses from external photons and neutrons irritation and internalised plutonium (Pu), americium (Am), and uranium (U) were modelled as cumulative lagged total doses per year. Beryllium exposure was evaluated as an effect modifier using data from the DOE Nationwide Beryllium Medical Program. Statistical analyses included standardised mortality ratios (SMRs), Cox proportional hazard models, and excess relative risk (ERR) models. Approximately 53.2% of workers were deceased by the end of the study. Nearly 90% were monitored for radiation exposure, with a mean weighted absorbed dose of 59.0 mGy for the lungs. Nearly 45% of workers had intakes of alpha-particle emitting radionuclides, and 46.7% were monitored for neutrons. Leading causes of death included ischemic heart disease (n = 999) and lung cancer (n = 361). The highest SMRs were observed for berylliosis (SMR: 176.9; 95% CI: 76.2, 348.7; n < 10) and asbestosis (SMR: 4.65; 95% CI: 2.23, 8.55; n = 10). Dose-response analyses showed no statistical increase in risk from low-dose radiation including lung cancer (ERR per 100 mGy: −0.02; 95% CI: −0.11, 0.08; n = 361) and Parkinson’s disease (ERR per 100 mGy: 0.13; 95% CI: −0.26, 0.31; n = 57). Approximately 45% of workers were monitored for beryllium, with a weak non-significant indication of effect modification for lung cancer risk. The RF cohort showed no evidence of a statistically significant increase in mortality from occupational radiation exposure. However, this study was limited by low statistical power, which inhibits the ability to detect effects. Future pooling of Million Person Study (MPS) cohorts will provide further insights, particularly regarding Pu as a carcinogen.

61 RADIATION PROTECTION AND DOSIMETRY↗

Plutonium Pit Production

A plutonium pit is a key component of a nuclear weapon. During the Cold War, the United States produced approximately 1,000 pits per year at the Rocky Flats Plant in Colorado. Rocky Flats was closed in 1992 and today the United States does not have the capability to manufacture new pits at the rate needed to maintain the nuclear deterrent. A delay in revitalizing this capability will eventually necessitate a larger, more expensive recapitalization effort in the future.

Source record↗

Data Mining of the Rocky Flats Library Archive for Plutonium Compatibility Studies

The objective of this project was to create a searchable database of plutonium compatibility studies from the Rocky Flats Archive. The Rocky Flats Plant was a manufacturing complex in Golden, Colorado that produced nuclear weapons. It primarily focused on producing plutonium pits, which were the cores of many nuclear implosion-type weapons. Because plutonium is an extremely reactive metal, avoiding the use of incompatible materials is imperative to avoid damaging the plutonium pit during its production. The Rocky Flats Plant had conducted extensive surveys of materials used in plutonium pit fabrication for their compatibility with plutonium.

36 MATERIALS SCIENCE↗

Rocky Flats Neutron Detector Testing at Valduc, France

Recent program requirements of the US Department of Energy/NNSA have led to a need for a criticality accident alarm system to be installed at a newly activated facility. The Criticality Safety Group of the Lawrence Livermore National Laboratory (LLNL) was able to recover and store for possible future use approximately 200 neutron criticality detectors and 20 master alarm panels from the former Rocky Flats Plant in Golden, Colorado when the plant was closed. The Criticality Safety Group participated in a facility analysis and evaluation, the engineering design and review process, as well as the refurbishment, testing, and recalibration of the Rocky Flats criticality alarm system equipment to be used in the new facility. In order to demonstrate the functionality and survivability of the neutron detectors to the effects of an actual criticality accident, neutron detector testing was performed at the French CEA Valduc SILENE reactor from October 7 to October 19, 2010. The neutron detectors were exposed to three criticality events or pulses generated by the SILENE reactor. The first excursion was performed with a bare or unshielded reactor, and the second excursion was made with a lead shielded/reflected reactor, and the third excursion with a polyethylene reflected core. These tests of the Rocky Flats neutron detectors were performed as a part of the 2010 Criticality Accident Alarm System Benchmark Measurements at the SILENE Reactor. The principal investigators for this series of experiments were Thomas M. Miller and John C. Wagner of the Oak Ridge National Laboratory, with Nicolas Authier and Nathalie Baclet of CEA Valduc. Several other organizations were also represented, including the Y-12 National Security Complex, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, CEA Saclay, and Babcock International Group.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Developing a competent criticality safety program: A retrospective - 14383

This paper considers the role of a nuclear criticality safety (NCS) program in protection of the nuclear facilities personnel as well as its mission and finances. It will discuss the author's experiences in assessing and strengthening the NCS program at the Idaho Chemical Processing Plant following the 1978 criticality accident. The weaknesses in the program illuminated by the event and the structural changes that resulted will be discussed. The upgrades to the development of the Criticality Safety Evaluation process, the strengthening of the implementation of limits and controls and the defense of the enhanced program in later years will be presented. The author's experiences with various problems in the NCS program at the Rocky Flats Plant in Colorado will also be detailed. The core problem of the disconnect between the NCS staff and the operators was addressed by a careful and cooperative rebuilding of the program by safety and operation staff. A key element in the new program was a clear assignment of responsibility for each program element and the role of a Criticality Safety Officer in each facility, reporting to and representing operations, in managing the communication flow and assuring the program field implementation so that the criticality risk reduction was as intended. From these practical experiences in focusing on identifying NCS program weaknesses and subsequent problem resolution, recommendation will be provided for elements of a robust NCS program. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Benchmark Evaluation of Plutonium Hemispheres Reflected by Steel and Oil

During the period from June 1967 through September 1969 a series of critical experiments was performed at the Rocky Flats Critical Mass Laboratory with spherical and hemispherical plutonium assemblies as nested hemishells as part of a Nuclear Safety Facility Experimental Program to evaluate operational safety margins for the Rocky Flats Plant. These assemblies were both bare and fully or partially oil-reflected. Many of these experiments were subcritical with an extrapolation to critical configurations or critical at a particular oil height. Existing records reveal that 167 experiments were performed over the course of 28 months. Unfortunately, much of the data was not recorded. A reevaluation of the experiments had been summarized in a report for future experimental and computational analyses. This report examines only fifteen partially oil-reflected hemispherical assemblies. Fourteen of these assemblies also had close-fitting stainless-steel hemishell reflectors, used to determine the effective critical reflector height of oil with varying steel-reflector thickness. The experiments and their uncertainty in keff values were evaluated to determine their potential as valid criticality benchmark experiments of plutonium.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

AK Re-evaluation of Rocky Flats Pond Sludge: Planning for Surprises - 16218

The Advanced Mixed Waste Treatment Project (AMWTP) uses the Sludge Repack Process (SRP) to treat prohibited liquids in retrieved containers of sludge originally stored in the early 1970's. Many of these containers were generated in the Rocky Flats Plant 2. Stage Sludge process. In June, 2015, operators at SRP identified containers of waste with historical IDs beginning with the prefix 742, indicating they were from the 2. stage process, but which were marked with the words 'Pond Sludge' and contained unusual waste such as rolled asphalt and plant material. This event required a reevaluation of the AK, which concluded that the pond sludge containers were from the same generating process as the rest of the 2. stage sludge, and did not change the hazardous waste numbers, waste material parameters or waste matrix code. This case study demonstrated the uncertainty inherent in all AK because of the long time period between generation of the waste and current characterization. Records are missing, unreadable, and difficult to interpret; memories are faulty; and containers continue to surprise us with unexpected waste. AK must be continually reevaluated and updated throughout the life of the project. When disposing of legacy waste, conditions such as that described in this case study should be expected and planned for. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plant (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Plutonium Hemisphere Critical Experiments Partially Reflected by Steel and Oil

A series of 15 critical experiments performed at the Rocky Flats Critical Mass Laboratory in the late 1960s were evaluated and then determined to represent acceptable benchmark experiments for the validation of calculational methods. This series of experiments was part of a larger set of experiments performed to evaluate operational safety margins at the Rocky Flats Plant. The experiments consisted of bare plutonium metal hemishells reflected by steel hemishells of increasing thickness and motor oil. The hemishell assembly was suspended within dual aluminum tanks. Criticality was achieved by pumping oil into the tanks such that effectively infinite reflection was achieved in all directions except directly above the assembly; then the critical oil height was recorded. The results of these experiments had been initially ignored because early computational methods had been inadequate to analyze partially-reflected configurations. The dominant uncertainties include the uncertainty in the average plutonium density and the composition of materials in the gaps between the plutonium hemishells. Simple and detailed benchmark models were developed. Eigenvalue calculations using MCNP5 and ENDF/B-VII.0 were within 2s of the benchmark values. This benchmark evaluation has been added to the ICSBEP Handbook.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Rocky Flats CAAS System Recalibrated, Retested, and Analyzed to Install in the Criticality Experiments Facility at the Nevada Test Site

Neutron detectors and control panels transferred from the Rocky Flats Plant (RFP) were recalibrated and retested for redeployment to the CEF. Testing and calibration were successful with no failure to any equipment. Detector sensitivity was tested at a TRIGA reactor, and the response to thermal neutron flux was satisfactory. MCNP calculated minimum fission yield (~2 x 10 15 fissions) was applied to determine the thermal flux at selected detector positions at the CEF. Thermal flux levels were greater than 6.39 x 10 6 (n/cm 2 -sec), which was about four orders of magnitude greater than the minimum alarm flux. Calculations of detector survivable distances indicate that, to be out of lethal area, a detector needs to be placed greater than 15 ft away from a maximum credible source. MCNP calculated flux/dose results were independently verified by COG. CAAS calibration and the testing confirmed that the RFP CAAS system is performing its functions as expected. New criteria for the CAAS detector placement and 12-rad zone boundaries at the CEF are established. All of the CAAS related documents and hardware have been transferred from LLNL to NSTec for installation at the CEF high bay areas.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War

Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE). In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and maintaining safety at each site while negotiating state and Federal environmental compliance agreements. The program also concentrated on characterizing waste and nuclear materials and assessing the magnitude and extent of environmental contamination. By the late 1990s, EM had made significant progress in identifying and characterizing the extent of contamination and cleanup required and began transitioning from primarily a characterization and stabilization program to an active cleanup and closure program. During that time, EM formulated multi-year cleanup and closure plans, which contributed to cleanup progress; however, reducing the overall environmental risk associated with the cleanup program remained a challenge. In response, the Secretary of Energy directed a review of the EM program be undertaken. The resulting 'Top-to Bottom Review' re-directed the program focus from managing risks to accelerating the reduction of these risks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The evolution of the Nevada National Security site waste acceptance criteria - 15312

The Nevada National Security Site Waste Acceptance Criteria (DOE/NV--325) is an evolution of requirements spanning almost three decades of waste acceptance at the Nevada National Security Site (NNSS). The original waste acceptance criteria (WAC) document was written in 1978 (document NVO-185) and underwent multiple revisions as time passed and disposal experience was gained. This document came into being when the NNSS first started receiving significant quantities of low-level radioactive waste (LLW) from offsite U.S. Department of Energy (DOE) generators, such as the Mound and Rocky Flats Plants. The original WAC was far less prescriptive and rigorous than the current criteria since many of the current DOE order directives, Federal/State laws, and regulations did not exist. The current WAC reflects the results of numerous revisions in order to address the nuances of the varied waste streams and package configurations accepted for disposal at the NNSS. This includes waste streams that exhibit challenges not previously faced or covered by the WAC and therefore, from time to time, require new information and or changes to be made to the WAC. These wastes now represent a growing percentage of the remaining waste at cleanup sites across the DOE Complex. These waste streams present challenges, such as the technical basis for ensuring safe transportation to and disposal at the NNSS. The current WAC (Rev. 10 dated June 2013), is Available online at: http://www.nv.energy.gov/library/publications/Environmental/DOENV{sub 3}25.pdf). Other challenges for the NNSS include incorporating new and emerging technologies and addressing stakeholder concerns. Addressing these challenges sometimes results in changes to the NNSS WAC. Drivers for revising the NNSS WAC over the years have included operating experience improvements, the need to specify waste origin/ownership, and identifying preferred transportation routing. This paper will discuss various aspects of the NNSS WAC, and how it has evolved based upon DOE orders and requirements, acceptance of offsite mixed wastes, acceptance of non-radioactive classified wastes, stakeholder concerns and agreements, and the changing face of the remaining legacy waste at DOE sites across the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 51: Idaho Transuranic Waste Challenges, Solutions and Implications for the Future (3/5)

This panel focused on the retrieval, characterization, treatment, certification, and shipping of transuranic (TRU) waste at the Idaho National Laboratory (INL) Site, Idaho, USA. The INL began receiving TRU waste from offsite generators (primarily the Rocky Flats Plant in Colorado, USA) beginning in 1954. Until 1970, the INL Site disposed of barrels, boxes, and other debris in a shallow, unlined landfill. Beginning in 1970, the INL Site began storing TRU waste on an asphalt pad, which was then covered with several feet of soil. This practice continued until the late 1980's at which time a large air support building was erected over the waste. In the mid-to-late 1990's, the air support building was removed and a massive building was constructed over the entire dirt mound. Contractors retrieved the waste from the early 2000's through February 2017 to support an Idaho Settlement Agreement milestone that required the retrieval of 65,000 cubic meters of TRU waste and removal from Idaho. This panel focused on the Idaho Transuranic Waste Challenges, Solutions and Implications for the Future. The Idaho Transuranic Waste Program includes buried and stored waste retrieval and processing of contact- and remote-handled transuranic waste. Over the duration of the program, the Idaho site has conducted targeted retrieval of buried waste from the 1950's and 1960's; designed, permitted, built, operated, and completed the mission of a facility to process 65,000 cubic meters of waste; and shipped more than 57,000 cubic meters of waste to WIPP. Presentation proposed: Transuranic Waste Challenges and Solutions (Hoss Brown, Fluor Idaho, LLC (USA), John McCoy, Fluor Idaho, LLC (USA), James Malmo, US DOE (USA), Doug Pruitt, Department of Energy Idaho Field Office (USA), Kenneth Princen, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗