Search NASA⌕ Search

SEARCH · Search NASA

Results for “Rapid cycling synchrotron”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

On the Possibility of Installing the Rapid Cycling Synchrotron of the Electron Ion Collider in the AGS Tunnel

This report describes electron injector concepts for the Electron Ion Collider (EIC) using the tunnel of the Alternating Gradient Synchrotron (AGS) of Brookhaven National Laboratory which is to be compared to the RCS in the RHIC tunnel or a new ring in a new tunnel. Possible designs of the electron booster synchrotron, the Rapid Cycling Synchrotron (RCS) with good spin transparency with electron energies of up to 10 GeV and 18 GeV and placing the injector linac in the adjacent Building 912 for are worked out. The main reason for studying such options is the expectation that it will reduce the Electron Ion Collider injector cost because no civil construction is required, the machine is very compact, and existing infrastructure can be used. The design of an RCS with a top energy of 10 GeV with good spin transparency is quite conventional. However, for collider operation with 18 GeV electrons, this option would require accelerating the 10 GeV beam in the Electron Storage Ring (ESR) to 18 GeV and relying on the Sokolov Ternov self-polarization at 18 GeV in the ESR. Solutions for an RCS with Electron energies of up to 18 GeV with or without spin transparency are found to be possible but push the envelope of conventional magnet technology.

43 PARTICLE ACCELERATORS↗

Dual-RF Phase Control for Adiabatic Energy Ramping in the EIC Rapid Cycling Synchrotron

The Electron-Ion Collider (EIC) Rapid Cycling Synchrotron (RCS) accelerates electrons from 750 MeV to 10 GeV over approximately 64.7 ms. While the baseline design simultaneously ramps both RF voltage and phase, this study evaluates an alternative where RF cavities are divided into two groups, each operating at a fixed 6.5 MV, with the effective voltage synthesized through phase control. In the symmetric scheme (Option A), both groups vary symmetrically about the synchronous phase to provide exact matching of energy gain and synchrotron tune throughout the ramp. Conversely, the asymmetric scheme (Option B) pins one group at the final operating phase while the other varies to supply the required energy gain. The feasibility of Option B is determined by the adiabaticity of the resulting synchrotron tune evolution, with ramp profiles, phase trajectories, and adiabaticity metrics analyzed for both implementations.

Gamage, B. [Thomas Jefferson National Accelerator ↗

Derivative-free optimization of a rapid-cycling synchrotron

Here, we develop and solve a constrained optimization model to identify an integrable optics rapid-cycling synchrotron lattice design that performs well in several capacities. Our model encodes the design criteria into 78 linear and nonlinear constraints, as well as a single nonsmooth objective, where the objective and some constraints are defined from the output of Synergia, an accelerator simulator. We detail the difficulties of the 23-dimensional simulation-constrained decision space and establish that the space is nonempty. We use a derivative-free manifold sampling algorithm to account for structured nondifferentiability in the objective function. Our numerical results quantify the dependence of solutions on constraint parameters and the effect of the form of objective function.

43 PARTICLE ACCELERATORS↗

A Damping Ring for the Rapid Cycling Synchrotron

The Electron-Ion Collider (EIC) electron accelerator chain consists of a 400 MeV electron Linear Accelerator (LINAC), the Rapid Cycling Synchrotron (RCS), and the Electron Storage Ring (ESR). The LINAC injects into the RCS, the RCS ramps to a top energy of 18 GeV and the electron beam is extracted to the ESR. To minimize the momentum spread of the 400 MeV injected beam and serve as a 28 nC electron accumulator ring, a damping ring is proposed. This ring may also serve as an intermediate energy booster for the RCS. The damping ring is not within the current baseline of the EIC project.

43 PARTICLE ACCELERATORS↗

The feasibility of electron beam slip stacking in EIC Rapid Cycling Synchrotron

Announced in 2020, the Electron Ion Collider will be constructed at Brookhaven National Lab (BNL) by modifying the existing Relativistic Heavy Ion Collider (RHIC) facility. Among the alterations include the installation of an electron storage ring (ESR) and a Rapid Cycling Synchrotron (RCS) in the existing RHIC tunnel. The RCS will accelerate polarized electrons from 400MeV to 5GeV,10GeV and 18 GeV and transfer it to the ESR. The LINAC source produces 7nC per shot meanwhile the RCS requires 28nC per bunch of charge. Currently, it is planned to inject 4 bunches into adjacent RF buckets and then merge them into a single RF bucket using fields from several RF cavities. However, this requires a kicker with an exceptionally fast rise and fall time to inject into adjacent RF bucket without disturbing the existing circulating bunch and this requires harmonic RF kickers. Our study focuses on determining the feasibility of an alternate particle injection method that will utilize slip stacking, a method that accommodates the circulation of multiple beams with different momentum in the same azimuthal space of the beampipe, thus permitting the accumulation of charge from several shots into a single RF bucket. We find the momentum aperture required for slip stacking using current RCS beam parameters exceeds the RCS’s momentum deviation limit,dp/p = 1.5%. We determine the appropriate dimensions the beam must have to enable slip stacking and conduct a literature review of slip stacking schemes in other facilities. The literature review tentatively indicates that slip stacking has not been attempted on electron beams at a major accelerator facility.. The slip stacking approach has the potential to save the cost of the harmonic RF kicker and bunch merging cavities.

43 PARTICLE ACCELERATORS↗

Effect of magnetic hysteresis on the dipole field in the EIC Rapid Cycling Synchrotron

The soft iron material, of which the yoke of a normal conducting magnet is made of, is subject to magnetic hysteresis under a time varying excitation. The hysteresis loop is influenced by the flow of induced eddy currents, which further affects the magnet field. The Rapid Cycling Synchrotron (RCS) at the planned Electron Ion Collider (EIC) facility will accelerate polarized electrons up to 18 GeV at 1 Hz. The impact of hysteresis in the magnet yoke on the magnet field during the ramp, including potential effects on cycle-to-cycle reproducibility, need to be evaluated. This will be the subject of discussion of this tech note in the context of the RCS dipoles.

43 PARTICLE ACCELERATORS↗

Electron Ion Collider Machine Protection System: On the necessity of the MPS abort system for Rapid Cycling Synchrotron

The Electron Ion Collider (EIC) accelerator complex includes multiple high-energy high-power accelerators [1]. Operation of such a complex is associated with numerous dangers of possible damage to the equipment. The EIC machine protection system (MPS) scope is to protect the components of each accelerator from damage by the beam. The EIC MPS design, commissioning and operation is closely interconnected with the protection of various accelerator subsystems, such as RF-system, cryogenics, vacuum system etc. Yet, the primary goal of the MPS is to protect the EIC accelerators from the possible damage caused by electron and proton beams.

43 PARTICLE ACCELERATORS↗

Consideration of HTS rapid-cycling magnet for staged muon acceleration

The HTS conductor hysteresis dominates magnet cable power loss but is independent of the magnetic field ramping rate. This makes the HTS conductor suitable to power the rapid-cycling accelerator magnet. We present a possible application of the HTS rapid-cycling magnet as outlined in [1,2] for the staged muon acceleration including the front-end Recirculating Linear Accelerator and the followed-up Rapid Cycling Synchrotrons delivering the muon beams to the Muon Collider.[1] H. Piekarz, S. Otten, A. Kario, H. ten Kate, “Rapid-cycling HTS magnet for muon acceleration”, US MC Inaugural Meeting, FERMILAB-POSTER-24-0219-AD, August 7-9, 2024[2] H. Piekarz, B. Claypool, S. Hays, M. Kufer, V. Shiltsev, “Record High Ramping Rates in HTS Based Supercond. Accelerator Magnet”, MT 27, IEEE Trans. on Applied Superccond, 32 (2022) 6, 4100404

Piekarz, Henryk [Fermilab]↗

Studies of Beam Intensity Effects in Fermilab Booster Synchrotron. Part II: Beam Emittance Evolution

Detrimental beam dynamics effects limit performance of high intensity rapid cycling synchrotrons (RCS) such as the 8 GeV Fermilab Booster. Here we report the results of comprehensive studies of various beam intensity dependent effects in the Booster. In the previous publication we presented the dependencies of the Booster beam intensity losses on the total number of protons per pulse and on key operational parameters such as the machine tunes and chromaticities. Here we discuss two methods of the Booster beam emittance measurements (the multi-wires proportional chambers and the ionization profile monitors), analyze the intensity dependent emittance growth effects and discuss the ultimate performance of the machine now and after foreseen and proposed upgrades.

43 PARTICLE ACCELERATORS↗

Studies of Beam Intensity Effects in Fermilab Booster Synchrotron. Part I: Introduction, Tune and Chromaticity Scans of Beam Losses

Detrimental beam dynamics effects limit performance of high intensity rapid cycling synchrotrons (RCS) such as the 8 GeV Fermilab Booster. Here we report the results of comprehensive studies of various beam intensity dependent effects in the Booster. Part I covers the dependencies of the Booster beam intensity losses on the total number of protons per pulse and on key operational parameters such as the machine tunes and chromaticities. In Part II we cross-check two methods of the beam emittance measurements (the multi-wires proportional chambers and the ionization profile monitors), analyze the intensity dependent emittance growth effects and discuss the ultimate performance of the machine now and after foreseen and proposed upgrades.

43 PARTICLE ACCELERATORS↗

Averaged invariants in storage rings with synchrotron motion

In an ideal accelerator, the single-particle dynamics can be decoupled into transverse motion—the betatron oscillations— and longitudinal motion—the synchrotron oscillations. Chromatic and dispersive effects introduce a coupling between these dynamics, the so-called synchro-betatron coupling. We present an analysis of the fully coupled dynamics over a single synchrotron oscillation that leads to an averaged invariant with synchro-betatron coupling in a generic lattice. Here, we apply this analysis to two problems: first, a toy lattice where the computations are analytically tractable, then a design for a rapid cycling synchrotron built using the integrable optics described by Danilov and Nagaitsev, showing that although there is fairly complex behavior over the course of a synchrotron oscillation, the Danilov-Nagaitsev invariants are nevertheless periodic with the synchrotron motion.

43 PARTICLE ACCELERATORS↗

Record High Ramping Rates in HTS Based Superconducting Accelerator Magnet

Here we report results of experimental test of the High Temperature Superconductor (HTS) based fast-cycling prototype accelerator magnet capable to operate up to about 300 T/s field ramping rate with some 0.5 T B-field in the magnet gap. The measured upper limit for the cryogenic cooling power required to support magnet conductor operation at high ramping rates indicates great potential for such type of magnets in rapid cycling synchrotrons for neutrino research or acceleration of very short-lived muons. The test magnet design, construction and supporting cryogenic and power systems are briefly described. The magnet's power test results are discussed in terms of a possible upgrade of this magnet design to 2 T B-field, a maximum feasible with super-ferric magnet.

43 PARTICLE ACCELERATORS↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

The eRHIC spin rotator and the beam optics of the 400 MeV transfer line to RCS

The 400 MeV LINAC 1 of the proposed eRHIC collider 1 is the first acceleration stage of the 18 GeV electron accelerator. The second acceleration stage of the electron accelerator is the Rapid Cycling Synchrotron (RCS), which can increase the energy of the electron bunches to 18 GeV and subsequently extract transfer and inject the 18 GeV electron bunches into the 18 GeV electron Storage Ring (SR) to collide with the hadron bunches of the existing (Relativistic Heavy Ion Collider (RHIC)) accelerator. This paper describes the beam optics of the transfer line between the 400 MeV LINAC and the RCS accelerator (LtRCS). The function of the LtRCS line is twofold, first to transfer the electron beam from the exit of the 400 MeV LINAC to the injection point of the RCS 1 and second to rotate the stable spin direction of the polarized electrons from the longitudinal direction to the vertical. A detailed description of the constraints to be satisfied by the LtRCS transfer line will be given. Finally, a section will also be devoted to discuss the spin rotator 2 .

43 PARTICLE ACCELERATORS↗