Results of Reservoir Modeling of the Operation and Production of a Recompleted Gas Well in a Geopressured/Geothermal Reservoir in the Wilcox Formation, Texas, for Electricity Generation
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The following report contains details on the drilling and completion of the new wells D-9-8#2 and D-9-9#2, as well as the recompletion work for the previously temporarily abandoned D-4-13 and D-4-14 wells. Each of the four wells will be used for observation activities for the SECARB Phase III Anthropogenic Test. A drilling and completion narrative and an as built description of the well including drawings and material specifications for the D-9- 8#2 and D-9-9#2 are outlined in this report. An outline of the recompletion procedure for the D-4-13 and D-4-14 wells is also included.
Seven raster surfaces generated from wellbore information that are thought to influence fluid and or gas migration in the subsurface. Wellbore information was originally retrieved from the IHS Energy Group (current as of April 2015), which is a proprietary, commercial database containing information for most oil and gas wells in the U.S. Processing of wellbore information into gridded cells was performed to provide a graphic solution to overcome the problem of displaying proprietary well data. No proprietary data are displayed or included in the cell maps. These rasters were developed to serve as inputs to the SIMPA (Spatially Weighted Multivariate Probabilistic Assessment) tool. Each raster surface is a derivative product of wellbore dataset. Each raster represents a single wellbore attribute or combination of attributes that speak to the following wellbore characteristics: number of recompletions, year spud, year abandoned, year completed, number of abandoned wells, hole direction, switch from production to injection. The original wellbore information, retrieved from the IHS Energy Group, are in the form of points – these derivative rasters aggregate point attributes to approximately 1,000-meter resolution grid cells. Each raster only includes cells that contain wellbores with the characteristics represented in each surface (i.e. if the wellbores in a given cell have no year abandoned data, the cell is not included in the raster). Since the raster cells combine data from multiple points in many cases, methods such as the average, minimum, and count are used to summarize the information in each cell. The specific operations used to develop each raster are detailed in its metadata.
The Hydraulic Fracture Test Site (HFTS) is a field-based hydraulic fracturing research experiment performed in the West Texas Permian (Midland) Basin. The HFTS includes $25 million of hydraulic fracturing research that is centralized around eleven horizontal wells fractured with over 400 stages in the Upper and Middle Wolfcamp formations as well as two recompleted legacy wells. As part of the HFTS experiment, and in addition to the comprehensive field data that was collected, approximately 600 feet of excellent quality, whole core was obtained by drilling a high-angle core well through the induced hydraulic fractures at the test site. Based upon observations of the acquired core, the understanding of hydraulic fracture propagation and effectiveness of proppant placement is challenging current thinking. Well interference testing and in-situ reservoir pressure measurements using bottom hole gauges in producing wells and discrete multilevel pressure gauges in an offset monitor well aid in understating fracture connectivity and conductivity over time.
The purpose of the Caldwell Ranch Exploration and Confirmation Project was to drill, test, and confirm the present economic viability of the undeveloped geothermal reservoir in the 870 acre Caldwell Ranch area of the Northwest Geysers that included the CCPA No.1 steam field. All of the drilling, logging, and sampling challenges were met. Three abandoned wells, Prati 5, Prati 14 and Prati 38 were re-opened and recompleted to nominal depths of 10,000 feet in 2010. Two of the wells required sidetracking. The flow tests indicated Prati 5 Sidetrack 1 (P-5 St1), Prati 14 (P-14) and Prati 38 Sidetrack 2 (P-38 St2) were collectively capable of initially producing an equivalent of 12 megawatts (MWe) of steam using a conversion rate of 19,000 pounds of steam/hour.
The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008).
The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring are conducted as part of the subsurface corrective action strategy. The site is currently in the fourth year of the 5-year proof-of-concept period that is intended to validate the compliance boundary. Analytical results from the 2012 monitoring are consistent with those of previous years. Tritium remains at levels below the laboratory minimum detectable concentration in all wells in the monitoring network. Samples collected from reentry well UC-1-P-2SR, which is not in the monitoring network but was sampled as part of supplemental activities conducted during the 2012 monitoring, indicate concentrations of tritium that are consistent with previous sampling results. This well was drilled into the chimney shortly after the detonation, and water levels continue to rise, demonstrating the very low permeability of the volcanic rocks. Water level data from new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels have not yet recovered from the 2011 sampling event during which several thousand gallons of water were purged. It has been recommended that a low-flow sampling method be adopted for these wells to allow head levels to recover to steady-state conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from alluvial wells installed in 2009 continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to groundwater flow at the site.
Two temporarily abandoned Citronelle Oil Field wells (D 4-13 and D 4-14) located up-dip from the D 9- 7#2 injection well (approximately 3,500 feet away) and outside of the area of review (Figure 1) were designated to be used for the monitoring activities associated with the SECARB Anthropogenic Test. Both wells were recompleted prior to the project, which included perforating the D 4-14 within the injection zone and the D 4-13 above the proposed confining unit. The D-4-13 well provides above-zone pressure monitoring in a perforated interval from 9,186 feet to 9,188 feet, with the gauge landing nipple at 9,111 feet. In-zone pressure monitoring occurs in the D-4- 14, perforated from 9,420 feet to 9,422 feet. The gauge landing nipple was set at 9,375 ft. Following the completion of the project These wells were converted back to their original condition for oilfield operations.
The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was proof-of-concept and monitoring with institutional controls. Annual sampling and hydraulic head monitoring are conducted as part of the subsurface corrective action strategy. The site is currently in the third year of the 5-year proof-of-concept period that is intended to validate the compliance boundary. Analytical results from the 2011 monitoring are consistent with those of previous years. Tritium remains at levels below detection in all wells. Water levels continue to rise in the reentry well UC-1-P-2SR that was drilled into the chimney shortly after the detonation, demonstrating the very low permeability of the volcanic rocks. Water level data from the new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels do not recover after yearly sampling events during which several thousand gallons of water are purged. It is recommended that low-flow sampling methods be adopted for these wells to allow head levels to recover to steady-state conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from alluvial wells installed in 2009 continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to flow at the site.
The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring of the well network are conducted as part of the subsurface corrective action strategy for the site. The monitoring well network was enhanced in 2013 with the installation of a new well MV-6. The site is currently in the fifth year of the 5-year proof-of-concept monitoring period. Analytical results from the 2013 monitoring are consistent with those of previous years indicating no tritium or 14 C concentrations above the required detection limits. Water level data from new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels have not yet recovered from the 2011 sampling event during which several thousand gallons of water were purged. Low-flow bladder pumps were installed during the November 2013 sampling event to reduce the well purge volumes and the impact purging has on the water levels during sampling. The new bladder pumps allow the collection of groundwater samples using the low-flow sampling method and will allow head levels to recover to steadystate conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from site continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to groundwater flow at the site.