Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reconductoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Options for Meeting Data Center Demand in Virginia: Focus on GETs and Reconductoring [Slides]

Data center demand growth in Virginia will need to met with many options - GETs and/or reconductoring have the potential to be part of the solution suite in the short-term and medium-term. Almost all GETs and reconductoring technologies have more favorable economics than transmission wires investments considering relatively low levels of existing wide-scale deployment. Deployment of GETs and/or reconductoring is not a one size fits all - requires detailed analysis. The complementary nature of GETs and/or reconductoring impacts have the potential to be synergistic (more congestion relief, more transfer capability, more cost savings - when implemented together).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reconductoring Economic and Financial Analysis Tool (REFA) v1.0

REFA is designed to help transmission planners better understand the financial, environmental and economic benefits of reconductoring upgrades, using traditional or advanced conductors. More specifically, the tool enables grid planners and utilities to demonstrate the entire lifetime value of reconductoring projects, providing potential justifications for projects with higher Capex - the purchase of long-term physical or fixed assets used in a business's operations. Existing tools are designed to compare technical aspects of different conductor applications. They typically do not allow a cost-benefit analysis over the lifetime of the conductor's operations.

Heleno, Miguel↗

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors↗

Estimating the impact of tariff-driven behind-the-meter storage operation on distribution grid investments

Increasing growth of distributed solar photovoltaics (PV) and electric vehicles (EV) can strain local distribution networks and require costly upgrades. Distributed battery storage, often deployed alongside PV, can be used to mitigate those costs, depending on how batteries are operated. This study evaluates the potential deferral value of distributed battery storage across a range of tariff structures, focusing on the rate structures most commonly available to residential customers today and related variants. Deferrals are evaluated with a least-cost distribution grid expansion optimization model to identify requirements on line reconductoring, transformer upgrades, and voltage regulator installations under each tariff. Results show that TOU rates and net billing tariffs can yield meaningful deferral value, depending on specific tariff structure features. Under the best performing tariff structure tested, storage produced a median annualized deferral value of $7.18 per kW of storage capacity ( kW S ) across all feeders in the sample, though deferral values were considerably larger for feeders with peak loads that coincide with utility system peak, i.e., timing of TOU peak period. In contrast, under an unrestricted TOU design with no restrictions on grid charging or discharging, the median deferral value was $0/ kW S illustrating the critical importance of tariff structure details.

Rodriguez-Garcia, Luis↗

Least-cost Optimal Distribution Grid Expansion (LODGE) v1

LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate new loads and behind-the-meter DERs in combination with advanced non-wire alternative (NWA) planning solutions, such as utility-owned storage and distributed PV. Working with a set of least-cost solutions per feeder/substation allows us to benchmark and compare techno-economic performance of different traditional and NWA planning solutions. An important aspect of the LODGE model is that it includes power flow operation constraints. This means that the least-cost planning solutions delivered by LODGE are technically feasible. Available projects in LODGE portfolio include: 1) feeder reconductoring; 2) transformers upgrades; 3) non-wire alternatives, such as strategic siting and sizing of storage and distributed PV; 4) voltage regulators.

Heleno, Miguel↗

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Grid Impacts of Community Solar [Slides]

Community solar (CS) projects often face uncertain interconnection costs and fees associated with distribution grid infrastructure upgrades required to connect the project. These costs can determine the economic viability of a CS project, but they are difficult to assess. Cost uncertainty can discourage new projects and prevent communities from accessing the benefits of community solar projects. At the same time, CS deployment strategies hold potential to defer or avoid some distribution costs due to new loads. To mitigate CS interconnection costs, it is important to find least-cost combinations of distribution system infrastructure solutions (transformer upgrades, reconductoring, voltage regulators, storage), and to understand how location of CS projects within a feeder impact distribution grid upgrade costs. This study aims to quantify CS impacts on the distribution grid and provide policy and regulatory insights and CS deployment strategies to address them. It is the first analysis that has systematically studied the technical impacts of community solar projects on a wide range of distribution feeders using state-of-the-art optimization and power flow tools. The analysis employs Berkeley Lab’s novel Least-cost Optimal Distribution Grid Expansion (LODGE) model, a deterministic version of the REPAIR model, that optimally upgrades hundreds or even thousands of distribution circuits or feeders. This is the first application of the LODGE model. LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate CS in combination with alternative solutions, such as utility-owned storage and downsizing CS capacity. Working with a set of least-cost solutions per feeder allows us to benchmark, compare and find techno-economic trends in CS interconnection.

14 SOLAR ENERGY↗

Least-cost Optimal Distribution Grid Expansion (LODGE): Utility Pilots

The Least-cost Optimal Distribution Grid Expansion (LODGE) model provides the optimal portfolio of distribution system upgrades—e.g., voltage regulators, feeder reconductoring, transformer upgrades and non-wires alternatives (NWA), such as strategic siting of storage and distributed generation—to interconnect distributed energy resources (DERs) and enable load growth. It can be used to assess grid infrastructure costs and explore policy and regulatory solutions for distribution planning and DER valuation.In 2025, Berkeley Lab conducted three pilot analyses to validate LODGE results with empirical utility data before the model’s first release in 2026. The pilots, done with utilities in Washington, Colorado, and New Mexico, provide examples that illustrate how the model works, what it can do, and the value of the analysis.

Heleno, Miguel↗

Integrating Data Centers and Grid Technologies at Scale

This presentation focuses on the challenge of integrating AI-driven data centers with the power grid at scale. It examines the AI data center capacity challenge and the role of new Medium Voltage Direct Current (MVDC) and other grid-enhancing technologies in enabling efficient and reliable power delivery. The session will highlight the National Laboratory of the Rockies' ARIES capabilities and planning tools, along with collaborative examples involving Verrus, Compass, and Schneider through the Agora test bed for grid-friendly data center evaluations, and ON. Energy for UPS evaluation. It will showcase the NLR Stable Grid Platform for studying oscillations caused by large-scale data centers, along with planning tools to assess grid security and reliability. Additionally, the presentation covers reconductoring strategies to increase grid capacity and explores innovative data center architectures, including the Advanced DC Architectures with Power-electronic Transformers (ADAPT) platform, which enables testing of complete DC architectures for data centers.

24 POWER TRANSMISSION AND DISTRIBUTION↗