False Cape Data Collection Annex, Solid Waste Management Unit 113, Limited Resource Conservation and Recovery Act Facility Investigation Report, Kennedy Space Center, Florida

This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Report summarizes groundwater investigation activities performed between July 2020 and October 2023 at the False Cape Data Collection Annex (FCDC) (Solid Waste Management Unit [SWMU] 113) located at Kennedy Space Center, Florida. The purpose of the RFI is to characterize the nature and extent of volatile organic compound (VOC)-contaminated groundwater at FCDC; evaluate the fate and transport of VOC contamination; collect sufficient data to evaluate potential future requirements for the site, such as corrective measures, long term monitoring, or No Further Action; and conduct a human health preliminary risk evaluation (PRE) based on the groundwater data.

False Cape Data Collection Annex↗

Soil Interim Measures Implementation Report Q6 Radar Station – Solid Waste Management Unit 112 Locations of Concern 3 and 10 Kennedy Space Center, Florida

This report presents a summary of the soil interim measures (IM) implementation activities that occurred from January 23 through June 6, 2023, at the Q6 Radar Station (Q6RS) Solid Waste Management Unit (SWMU) 112, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at 10 Q6RS Locations of Concern (LOCs), identified during a SWMU assessment in 2013 (NASA 2013). Since the SWMU assessment, further confirmatory sampling and assessment was conducted for each LOC, and based on the data collected during these assessments, it was determined that Resource Conservation and Recovery Act Facility Investigation to further evaluate soil and groundwater was to be conducted at two LOCs: LOC 1 – Former Underground Storage Tanks (groundwater) and LOC 3 – Radar Antenna Refurbishment Area (soil). The LOC 1 groundwater assessment is ongoing, and the results will be presented under a separate cover. It was also determined that soil IM would be completed at two of the LOCs, LOC 3 and LOC 10 – Compressor Building Condensate Discharge. A Soil IM Work Plan was prepared and submitted in October 2021 (NASA 2021). The plan proposed excavation and disposal of barium and copper impacted soil in the LOC 3 and 10 areas. This report presents a summary and results of the soil IM implementation activities conducted at LOCs 3 and 10. The site contaminates of concern for this soil IM are barium and copper. The activities presented in this report includes soil IM implementation and groundwater sampling. From January 23 through March 24, 2023, AECOM Technical Services, Inc. (AECOM) field personnel conducted IM implementation activities in the LOC 3 and 10 areas. As presented in the IM Work Plan, shallow soils, impacted with metals, were excavated to a depth of 2 feet below land surface in the central area of the site around the radar antenna and associated equipment. AECOM personnel excavated 77.43 tons of soil using hand tools and, when able, heavy equipment. The soils were placed into lined roll-off containers, which were covered and transported under manifest to the Cedar Trail Landfill in Bartow, Florida. The site was restored to original condition using certified clean backfill material (sand), with filter fabric, and gravel. Areas outside of the excavation were restored with grass seed. On June 6, 2023, AECOM field personnel conducted groundwater sampling activities within the soil IM excavation area. AECOM personnel collected one groundwater sample from monitoring well Q6RS-MW0003. The sample was submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 6020B for metals (barium and copper). Barium and copper were detected at 18 micrograms per liter (µg/L) and 14 µg/L, respectively, and were below the State of Florida Groundwater Cleanup Target Levels (GCTLs) for barium at 2,000 µg/L and copper at 1,000 µg/L.

Chadwick Sloan Lee↗

Un-Numbered Operational Areas PRL 229 Railroad Tie Disposal Area Pond Confirmation Sampling Report

This Confirmatory Sampling (CS) Report (CSR) was prepared for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida in accordance with the CS Work Plan (CSWP) (HGL, 2022a). The CSR summarizes investigation activities performed on the Railroad Tie Disposal Area (RTDA) of the Un-Numbered Operational Areas (UNOA), Potential Release Location (PRL) 229 located at KSC. HydroGeoLogic, Inc. (HGL) prepared this report under Contract Number 80KSC019D0012. The purpose of the CSR is to provide information to evaluate the level of potential contamination in surface water and sediment samples collected from the RTDA PRL 229 Pond and determine if contaminants pose unacceptable risks to ecological receptors. The CSR provides analytical data of 10 sets of surface water and sediment samples collected in 2021. Surface water samples were analyzed for volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs), polynuclear aromatic hydrocarbon (PAHs), metals, hardness, and salinity, while sediment samples were analyzed for metals, total organic carbon (TOC), SVOCs, PAHs, and total petroleum hydrocarbons (TPH). The CSR includes a Screening Level Ecological Risk Assessment (SLERA) conducted under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program to determine if unacceptable risks to ecological receptors exist at PRL 229 Pond. Metals and PAHs were detected in surface water samples, including detections of antimony, arsenic, barium, calcium, copper, lead, magnesium, thallium, zinc, anthracene, benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-c,d)pyrene and pyrene. Based on measured salinity (1.03 to 1.21 parts per thousand), the pond was identified as freshwater. Sediment analytical results also contained detections of metals and PAHs, including antimony, arsenic, barium, beryllium, cadmium, chromium, copper, lead, mercury, nickel, selenium, thallium, zinc, anthracene benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-c,d)pyrene and pyrene. Potential risks to ecological receptors were evaluated in accordance with the SLERA Work Plan and the Decision Process Document for the Resource Conservation and Recovery Act (RCRA) Corrective Action Program at KSC (DPD) (Geosyntec, 2019), and using the 2021 sediment and surface water analytical results. Potential ecological receptors evaluated in the SLERA include the aquatic community, benthic invertebrates, aquatic birds, and aquatic mammals. The SLERA included Steps 2a through 2c of the Ecological Risk Assessment (ERA) process in accordance with the DPD. Using multiple lines of evidence, the SLERA concluded that many of the detected analytes are present at concentrations similar to those in background or reference locations at KSC, and/or at concentrations that would not pose a significant risk to ecological communities. There are no screening values available for the avian community, and PAHs are bioaccumulative compounds. For this reason, food web modeling was completed as a supplement to Step 2c to provide a quantitative evaluation of this exposure pathway. Food web modeling indicates that PAHs are unlikely to pose a risk to birds exposed to site sediment and surface water. Based on the results of the SLERA, the contaminants in sediment and surface water pose no to minimal risk to the ecological communities that could live or forage at the site. Based on the results of the SLERA, no further study is recommended for the RTDA Pond at PRL 229.

Confirmation Sampling↗

An industrial application of the JPL ACTS with energy recovery

The JPL Activated Carbon Treatment System (ACTS) uses sewage solids derived from municipal wastewater treatment systems as a source of organic material for powdered activated carbons (PAC). The PAC is used for the COD removal from wastewater and as a filter aid in the recovery of additional sewage solids.

Humphrey, M. F.↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida

The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.

Space Shuttle Program↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Communication

NASA s communication work for the UAS Command and Control area will build upon work currently being conducted under NASA Recovery Act funds. Communication portions of UAS NextGen ConOps, Stateof- the-Art assessment, and Gap Analysis. Preliminary simulations for UAS CNPC link scalability assessment. Surrogate UAS aircraft upgrades. This work will also leverage FY10 in-guide funding for communication link model development. UAS are currently managed through exceptions and are operating using DoD frequencies for line-of-sight (LOS) and satellite-based communications links, low-power LOS links in amateur bands, or unlicensed Instrument/Scientific/Medical (ISM) frequencies. None of these frequency bands are designated for Safety and Regularity of Flight. No radio-frequency (RF) spectrum has been allocated by the International Telecommunications Union (ITU) specifically for UAS command and control links, for either LOS or Beyond LOS (BLOS) communication.

Griner, James↗

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP↗

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures↗

Interim Measures Report for the Headquarters Building Area Location of Concern (LOC) 2E East SWMU 104 John F. Kennedy Space Center, Florida

The Hazardous and Solid Waste Amendment portion of the National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) Permit issued by the Florida Department of Environmental Protection (FDEP), requires identification and evaluation of all known Solid Waste Management Units (SWMUs) and Locations of Concern (LOCs) located on Kennedy Space Center (KSC) property. The KSC Headquarters Building Area (KHQA) has been identified as SWMU 104 under KSC's RCRA Program. This report summarizes the Interim Measure (IM) conducted by Geosyntec Consultants (Geosyntec) for NASA under Indefinite Delivery Indefinite Quantity Contract NNK12CA13B at the KHQA to mitigate potential exposure to polychlorinated biphenyl (PCB)-affected media at the eastern side of LOC 2E. The IM activities were conducted in June and July 2015 to remediate PCBs above the FDEP Residential Direct-Exposure (R-) Soil Cleanup Target Level (SCTL) of 0.5 milligram per kilogram (mg/kg) established by Chapter 62-777, Florida Administrative Code. The IM was performed in accordance with the IM Work Plan (IMWP) approved by the FDEP, dated August 2012. IM activities were conducted in accordance with the KSC Generic PCB Work Plan (NASA 2007).

Sager, Eric D.↗

Building M7-0505 Treatment Tank (SWMU 039) Annual Performance Monitoring Report

This Annual Performance Monitoring Report presents a summary of Interim Measure (IM) activities and an evaluation of data collected during the third year (June 2014 to September 2015) of operation, maintenance, and monitoring (OM&M) conducted at the Building M7-505 (M505) Treatment Tank area, Kennedy Space Center (KSC), Florida ("the Site"). Under KSC's Resource Conservation and Recovery Act Corrective Action Program, the M505 Treatment Tank area was designated Solid Waste Management Unit 039. Arcadis U.S., Inc. (Arcadis) began IM activities on January 10, 2012, after completion of construction of an in situ air sparge (IAS) system to remediate volatile organic compounds (VOCs) in groundwater at concentrations exceeding applicable Florida Department of Environmental Protection (FDEP) Chapter 62-777, Florida Administrative Code, Natural Attenuation Default Concentrations (NADCs). This report presents a summary of the third year of OM&M activities conducted between June 2014 and September 2015.

Source record↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Area South of K7-516, SWMU 100 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report documents groundwater interim measure activities from March 30, 2019 through December 31, 2019 at the Area South of K7-516 site located at Kennedy Space Center (KSC), Florida. An air sparge (AS) system consisting of 16 AS wells was installed along the Barge Canal in 2012 to be protective of the Outstanding Florida Waters (OFW). The AS system was expanded in 2015 by installing 40 AS wells to remediate the hot spot (HS) area. Additional expansion activities were performed in 2018 through the installation of eight additional AS wells along the Barge Canal. Currently 24 OFW and 40 HS AS wells are in operation. This report includes performance monitoring events for the OFW and HS areas, along with an annual Interim Groundwater Monitoring (IGWM) event in the Western Area. The 516S site has been designated Solid Waste Management Unit 100 under KSC’s Resource Conservation and Recovery Act Corrective Action program. This document was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011/80KSC019F0068. The OFW and HS AS systems are meeting the performance criteria and IM objectives of preventing contaminant migration and remediating groundwater within the treatment zone. Team consensus was reached to continue operation of the combined OFW and HS AS systems (Meeting Minute 2002-M02, Decisions 2002-D06, D09 and D04). Team consensus was also reached to continue semi-annual OFW performance monitoring and annual monitoring for the IGWM Western Area for the same wells sampled during 2019 events. In the eastern area, MW13, MW14, and MW15 will be reduced from semi-annual to annual frequency. For the HS Area, team consensus was reached to continue the current annual/biennial monitoring program (Meeting Minute 2002-M02, Decisions 2002-D02, D03, D05, D07 and D08).

Patrice L. Lehocky↗

Components Cleaning Facility, SWMU 30 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report (IGWMR) presents the findings of IGWM completed in June and December 2019 at the eastern portion of the Components Cleaning Facility (CCF East) site located at Kennedy Space Center (KSC), Florida. The site has been designated Solid Waste Management Unit (SWMU) 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Patrice L Lehocky↗

Corrosion Atmospheric Exposure Facility PRL #239 SWMU Assessment Report/Confirmation Sampling Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The Corrosion Atmospheric Exposure Facility (CAEF), also known as facility number K8-0600, and the Corrosion Test Area (CTA); also known as facility number K8-0237, herein referred to as the site, is designated Potential Release Location (PRL) 239 under the NASA RCRA permit. A SWMU Assessment (SA) was conducted between November 2019 and February 2020 to identify potential environmental impacts related to current and historic operations being conducted at the site. The SA included a site reconnaissance visit in February 2020, interviews with various personnel possessing knowledge of past work practices and operations at the site, and review of available historical documentation, engineering drawings, and facility inspection reports. Current site conditions were documented in photographs. Soil types and wildlife habitat were also evaluated. The objective of the assessment was to identify potential locations of concern (LOC) at the site and to determine whether further evaluation is required.

Kimberly Clower↗

Former Central Heat Plant, SWMU 045 Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements for the air sparging (AS) Interim Measure (IM) design provided in the IM Work Plan (IMWP) within the High Concentration Plume (HCP) at the Former Central Heat Plan (CHP) located at Kennedy Space Center (KSC), Florida. The IMWP presented an approach to implement an AS IM to reduce chlorinated volatile organic compound concentrations to concentrations that facilitate a transition to long-term monitoring. CHP has been designated Solid Waste Management Unit 045 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Christopher J Pike↗