Search NASA⌕ Search

SEARCH · Search NASA

Results for “Refueling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Impact of hydrogen refueling configurations and market parameters on the refueling cost of hydrogen

The cost of hydrogen in early fuel cell electric vehicle (FCEV) markets is dominated by the cost of refueling stations, mainly due to the high cost of refueling equipment, small station capacities, lack of economies of scale, and low utilization of the installed refueling capacity. Using the hydrogen delivery scenario analysis model (HDSAM), this study estimates the impacts of these factors on the refueling cost for different refueling technologies and configurations, and quantifies the potential reduction in future hydrogen refueling cost compared to today’s cost in the United States. The current hydrogen refueling station levelized cost, for a 200 kg/day dispensing capacity, is in the range of 6–8 dollars/kg H 2 when supplied with gaseous hydrogen, and 8–9 dollars/kg H 2 for stations supplied with liquid hydrogen. After adding the cost of hydrogen production, packaging, and transportation to the station’s levelized cost, the current cost of hydrogen at dispensers for FCEVs in California is in the range of 13–15 dollars/kg H 2 . The refueling station capacity utilization strongly influences the hydrogen refueling cost. The underutilization of station capacity in early FCEV markets, such as in California, results in a levelized station cost that is approximately 40% higher than it would be in a scenario where the station had been fully utilized since it began operating. In future mature hydrogen FCEV markets, with a large demand for hydrogen, the refueling station’s levelized cost can be reduced to 2 dollars/kg H 2 as a result of improved capacity utilization and reduced equipment cost via learning and economies of scale.

33 ADVANCED PROPULSION SYSTEMS↗

Enhanced methods for operating refueling station tube-trailers to reduce refueling cost

A method and apparatus are provided for operating a refueling station including source tube-trailers and at least one compressor to reduce refueling cost. The refueling station includes a gaseous fuel supply source including a plurality of tanks on a tube trailer coupled to a first control unit, and high pressure buffer storage having predefined capacity coupled to a second control unit and the first tanks by a pressure control valve and the first control unit, and at least one compressor. The refueling station is operated at different modes depending on a state of the refueling station at the beginning of each operational mode. The refueling system is assessed at the end of each operational mode to identify the state of the system and select a next mode of operation. The operational modes include consolidating hydrogen, or any gaseous fuel, within the tubes mounted on the trailer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Experimental Comparison of Hydrogen Refueling with Directly Pressurized vs. Cascade Method

This paper presents a comparative analysis of two hydrogen station configurations during the refueling process: the conventional “directly pressurized refueling process” and the innovative “cascade refueling process.” The objective of the cascade process is to refuel vehicles without the need for booster compressors. The experiments were conducted at the Hydrogen Research and Fueling Facility located at California State University, Los Angeles. In the cascade refueling process, the facility buffer tanks were utilized as high-pressure storage, enabling the refueling operation. Three different scenarios were tested: one involving the cascade refueling process and two involving compressor-driven refueling processes. On average, each refueling event delivered 1.6 kg of hydrogen. Although the cascade refueling process using the high-pressure buffer tanks did not achieve the pressure target, it resulted in a notable improvement in the nozzle outlet temperature trend, reducing it by approximately 8 °C. Moreover, the overall hydrogen chiller load for the two directly pressurized refuelings was 66 Wh/kg and 62 Wh/kg, respectively, whereas the cascading process only required 55 Wh/kg. This represents a 20% and 12% reduction in energy consumption compared to the scenarios involving booster compressors during fueling. The observed refueling range of 150–350 bar showed that the cascade process consistently required 12–20% less energy for hydrogen chilling. Additionally, the nozzle outlet temperature demonstrated an approximate 8 °C improvement within this pressure range. These findings indicate that further improvements can be expected in the high-pressure region, specifically above 350 bar. This research suggests the potential for significant improvements in the high-pressure range, emphasizing the viability of the cascade refueling process as a promising alternative to the direct compression approach.

08 HYDROGEN↗

On-Orbit Xenon Refueling Loading Times and Transient Analysis

The Power and Propulsion Element (PPE) of the Lunar Orbital Platform-Gateway will demonstrate the first on-orbit refueling of xenon propellant for a solar electric propulsion system. An analysis was performed in Microsoft Excel to determine what factors influence the overall refueling time of a single 2,000-kilogram capacity xenon propellant tank, as well as provide estimates for overall refueling duration. Due to the high heat of compression of xenon, the propellant tank could exceed its maximum allowable temperature during refueling if the xenon flow rate and temperature are unregulated. In order to prevent overheating, a logic based "bang-bang" operation was used for refueling, shutting off the mass feed when the tank reached a maximum temperature. Heat is removed from the tank via radiation to the surrounding spacecraft bus. The analysis shows that optimizing key parameters such as mass flow rate into the tank, residual propellant in the tank during the onset of refueling, and tank diameter significantly reduces the overall refueling duration. Optimization is not straightforward, however, as the loading time does not trend monotonically with the parameters. Overall, the most significant impact on loading duration comes from altering the residual propellant in the tank. Increasing the mass of residual propellant from 2 percent to 20 percent reduces the overall refueling duration by 56 percent. Future work based on this analysis includes creation of a SINDA/FLUINT model and building a ground-based xenon refueling system emulator.

Xenon↗

Thermal Analysis of Refueling Propellant Systems for PPE

To support the sustainability of Gateway, approach the challenge of sustainable presence beyond low earth orbit, and provide proving grounds for future missions beyond the surface of the moon, refueling capabilities must be incorporated into Gateway. The objective is to replenish propellants into the Power and Propulsion Element (PPE) from the European System Providing Refueling, Infrastructure and Telecommunications (ESPIRIT) through the Habitation and logistics outpost (HALO). PPE refueling will consist of a bipropellant transfer system, as well as a main propellant transfer system. Refueling the Power and Propulsion Element in near rectilinear halo orbit can present various issues, and to thermally maintain the refueling system during this event requires diligent planning and thermal design. Presently, a thermal model exists to analyze the components of the refueling system as the development of PPE continues. The analysis from the thermal model will verify the integrity of the all the components during a refueling event throughout the duration of the mission given various environmental differences. To confidently refuel PPE, thermal analysis, and various tests of the refueling components, must be completed to achieve the desired sustainability of Gateway.

Ethan Sparks↗

Refueling Infrastructure Scoping and Feasibility Assessment for Hydrogen Rail Applications

The feasibility and component cost of hydrogen rail refueling infrastructure is examined. Example reference stations can inform future studies on components and systems specifically for hydrogen rail refueling facilities. All of the 5 designs considered assumed the bulk storage of liquid hydrogen on-site, from which either gaseous or liquid hydrogen would be dispensed. The first design was estimated to refuel 10 multiple unit trains per day, each train containing 260 kg of gaseous hydrogen at 350 bar on-board. The second base design targeted the refueling of 50 passenger locomotives, each with 400 kg of gaseous hydrogen on-board at 350 bar. Variations from this basic design were made to consider the effect of two different filling times, two different hydrogen compression methods, and two different station design approaches. For each design variation, components were sized, approximate costs were estimated for major components, and physical layouts were created. For both gaseous hydrogen-dispensing base designs, the design of direct-fill using a cryopump design was the lowest cost due to the high cost of the cascade storage system and gas compressor. The last three base designs all assumed that liquid hydrogen was dispensed into tender cars for freight locomotives that required 7,500 kg of liquid hydrogen, and the three different designs assumed that 5, 50, or 200 tender cars were refueled every day. The total component costs are very different for each design, because each design has a very different dispensing capacity. The total component cost for these three designs are driven by the cost of the liquid hydrogen tank; additionally, delivering that much liquid hydrogen to the refueling facility may not be practical. Many of the designs needed the use of multiple evaporators, compressors, and cryopumps operating in parallel to meet required flow rates. In the future, the components identified here can be improved and scaled-up to better fit the needs of heavy-duty refueling facilities. This study provides basic feasibility and first-order design guidance for hydrogen refueling facilities serving emerging rail applications.

08 HYDROGEN↗

Development Testing of the Gateway Integrated Bipropellant Refueling Subsystem

The Lunar Gateway is a deep space orbiting outpost being developed by the National Aeronautics and Space Administration (NASA) in partnership with the European Space Agency (ESA) and other domestic and international partners. Because Gateway is a vital component of NASA’s Artemis program supporting long-term human exploration of the moon, it is designed for on-orbit refueling to allow for a longer life performance. The reaction control system (RCS) bipropellant refueling system onboard the station will have the capability to transfer propellants, monomethyl hydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3), under controlled conditions and will span across three modules: the European System Providing Refueling Infrastructure and Telecommunication Refueling Module (ESPRIT-RM or ERM), the Habitation and Logistics Outpost (HALO), and the Propulsion and Power Element (PPE). These propellant transfers are complex operations with known hazards, and one of the risk areas is exceeding the flight system’s maximum design pressure (MDP) in priming and refueling pause/stop operations. In priming, liquid propellant is transferred from a pressurized source tank to evacuated transfer lines, which could result in excessive transient surge pressures and potentially damage hardware. In refueling pause/stop operations, fast-acting isolation valves (IV) are closed, which could lead to damaging water hammer. To mitigate these risks and develop the system, a collaborative NASA/ESA/Thales Alenia Space – United Kingdom (TAS-UK) test program was completed at TAS-UK on a simplified refueling breadboard representing ERM, HALO, and PPE bipropellant transfer systems. The objectives of the integrated breadboard testing were to (1) gather performance data to characterize and demonstrate critical refueling operations, (2) help inform flight designs, and (3) to validate numerical models that can be extended to predicting flight system performance. Integrated breadboard test data has shown the architected system performance is closing initial design assumptions. Further testing with propellant on a higher fidelity fluid simulator and analysis are planned.

Adela D Han↗

Development Testing of the Gateway Integrated Bipropellant Refueling Subsystem

The Lunar Gateway is a deep space orbiting outpost being developed by the National Aeronautics and Space Administration (NASA) in partnership with the European Space Agency (ESA) and other domestic and international partners. Because Gateway is a vital component of NASA’s Artemis program supporting long-term human exploration of the moon, it is designed for on-orbit refueling to allow for a longer life performance. The reaction control system (RCS) bipropellant refueling system onboard the station will have the capability to transfer propellants, monomethyl hydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3), under controlled conditions and will span across three modules: the European System Providing Refueling Infrastructure and Telecommunication Refueling Module (ESPRIT-RM or ERM), the Habitation and Logistics Outpost (HALO), and the Propulsion and Power Element (PPE). These propellant transfers are complex operations with known hazards, and one of the risk areas is exceeding the flight system’s maximum design pressure (MDP) in priming and refueling pause/stop operations. In priming, liquid propellant is transferred from a pressurized source tank to evacuated transfer lines, which could result in excessive transient surge pressures and potentially damage hardware. In refueling pause/stop operations, fast-acting isolation valves (IV) are closed, which could lead to damaging water hammer. To mitigate these risks and develop the system, a collaborative NASA/ESA/Thales Alenia Space – United Kingdom (TAS-UK) test program was completed at TAS-UK on a simplified refueling breadboard representing ERM, HALO, and PPE bipropellant transfer systems. The objectives of the integrated breadboard testing were to (1) gather performance data to characterize and demonstrate critical refueling operations, (2) help inform flight designs, and (3) to validate numerical models that can be extended to predicting flight system performance. Integrated breadboard test data has shown the architected system performance is closing initial design assumptions. Further testing with propellant on a higher fidelity fluid simulator and analysis are planned.

Adela D Han↗

Modeling Continuous Online Refueling with SCALE 6.3.1 and Serpent-2 in the EIRENE Novel Molten Salt Reactor Design

The Molten Salt Reactor (MSR) is a Generation IV advanced fission reactor design in which the coolant, and in some cases the fuel itself, is in the form of liquid molten alkali-halide salts with a fluoride or chloride ionic base. In liquid-fueled MSRs, reactor refueling may be performed online, where fresh fuel salt is added to the core during operation without the need for shutdown periods. Refueling for these reactor designs is typically modeled using either a batch or continuous refueling approach, both of which can be simulated with the SCALE 6.3.1 and Serpent-2 code systems. However, the specific manner in which they are implemented can vary depending upon the desired rate of refueling, whether the refueling rate is constant or variable, and consideration of salt drainage for systems where the in-core salt volume is kept constant. In a novel MSR fuel cycle concept termed the “Sourdough” fuel cycle, fuel salt is allowed to “grow” within the core, with excess salt either being transferred to an external holding tank to maintain a constant core volume or diverted to an upper plenum within the core to allow for volume growth. In this work, continuous refueling was modeled in a thermal-spectrum, LEU-fueled, small MSR design operating with the Sourdough fuel cycle using the SCALE 6.3.1 and Serpent-2 codes. Two different continuous refueling approaches were simulated, with the performance of each being compared to determine which is most suitable for use with the Sourdough fuel cycle concept.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Practical Multi-Cycle Refueling Simulation of Stable Salt Reactors Based on REBUS Depletion Calculation

A Python software tool ReloadPy has been developed to assistant in formulating online refueling strategies for a family of stable salt reactors. ReloadPy wraps over the legacy fast reactor analysis codes REBUS, DIF3D, and PERSENT. These codes are used to perform single cycle depletion analysis and calculate reactivity worth and power density. ReloadPy determines a refueling assembly position to achieve the user-specified primary objective while satisfying constraints on various performance parameters such as the maximum power density, the maximum reactivity worth of reloaded assembly, and the minimum cycle length. Various capabilities of prescribing refueling sequence or a range of candidate refueling positions and restarting a previous simulation with altered options are implemented to reduce the required user’s efforts to investigate different refueling strategies. This report presents the computational models and methods and also serves as a user guide. Long-term simulation capabilities with different refueling strategies are demonstrated by a series of sample SSR refueling calculations with two-dimensional surrogate core models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary analysis of the benefits derived to US Air Force spacecraft from on-orbit refueling

This analysis was undertaken during FY-91 as a preliminary step to identify potential benefits from refueling Air Force satellites on orbit. Both economic and operational benefits were included. Operational benefits were related in economic terms to allow evaluation. All economic comparisons were made using FY-91 costs. An additional purpose of the effort was to identify the preferred mission parameters, for an on-orbit refueling system. A companion study was being concurrently conducted by SSD/XRP and NASA/JPL to develop a hardware concept for an on-orbit refueling system. The mass estimates for refueling missions obtained from the companion study were used in conducting the economic analyses of this benefits study. For this study, on-orbit refueling was based on the concept developed in the companion JPL study. The concept involves launching an S/C carrying fuel that would be transferred to another 'target' S/C which is already in orbit. The two S/C would then rendezvous, dock, and transfer fuel. Another fluid, such as a cryogenic, might be included if needed by the target S/C. The hardware concept for refueling was intended to minimize costs. The re-fueler S/C was designated to be expendable and would contain only the minimal capabilities. It would be launched into the orbit plane and altitude of the target S/C(s). The re-fueler S/C would rendezvous and dock with the target S/C and the fluid transfer would occur. When the refueling mission was completed, the re-fueler S/C would be ejected from the orbit. In order to optimize launch costs, some missions involved launching two re-fueler S/C on the LV. In this case the second re-fueler S/C would be placed in a storage orbit until needed.

Smith, Scott↗

NASA Gateway Refueling Architecture and Concept of Operation

The Lunar Gateway is a deep space orbiting outpost being developed by NASA in partnership with ESA and other domestic and international partners. It is a critical component of NASA’s Artemis program supporting long-term human exploration of the moon and is designed to be refueled, requiring the on-orbit transfer of propellants. The first two modules of Gateway to be launched will be the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). The PPE contains the bipropellant chemical and electrical propulsion systems that will provide attitude control and orbit raising capability for Gateway. The reaction control system (RCS) utilizes monomethylhydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3) as the fuel and oxidizer, respectively. Helium is used as a pressurant. The Advanced Electric Propulsion Systems (AEPS) and Busek hall thrusters that comprise the solar electric propulsion (SEP) system use xenon as the propellent. The ESPRIT Refueling Module, provided by ESA, will supply the propellant refueling function to Gateway’s propulsion systems. On-orbit refueling is a complex, technically challenging operation that is key to enabling sustainable crewed Lunar and Martian exploration. Numerous systems may be involved in the refueling operation. Also numerous systems are required to enable the successful ability for Gateway to refuel such as, SEP, RCS, Structure & Mechanisms (S&M), Guidance, Navigation and Control (GNC), Thermal, Software, Vehicle System Manager (VSM), Flight Ops, Extra Vehicular Robotics (EVR), Communication and Tracking (C&T), Avionics, and more. This paper will detail the design architecture, concept of operations, and challenges associated with the Gateway refueling system. The methodologies used in Gateway will be compared to those implemented in OSAM-1 and the best practices documented by AIAA and CONFERS (Consortium For Execution Of Rendezvous And Servicing Operations).

Brandie L. Rhodes↗

Providing Levelized Cost and Waiting Time Inputs for HDV Hydrogen Refueling Station Planning: A Case Study of U.S. I-75 Corridor

Widespread use of diesel fuels in freight transportation leads to greenhouse gas (GHG) emissions that play an important role in air pollution. The air pollution, as well as the energy crisis, drives the transition from diesel fuel to cleaner and more energy-efficient fuels such as hydrogen fuels. With such a transition, the strategic planning and optimization of supporting refueling infrastructure along the national highway for heavy-duty vehicles (HDVs) become a necessity. Cost and service level are two essential factors to be considered in hydrogen refueling station location and capacity optimization. The service level in this study is assessed by the delay (waiting time) at fueling stations as well as the fueling demand fulfilled. To this end, this study presents a methodology to provide waiting time (delay) and levelized hydrogen fuel cost inputs under different station configurations (number of dispensers and fill rates) for hydrogen refueling station planning. Determining the station configurations based on the trade-off between the two inputs is further discussed. Particularly, this study points out that the levelized cost and waiting time are affected by hourly demand patterns and estimates the two inputs under different peak hour fueling demand scenarios. The results suggest that, with the same daily demand, the cost, as well as the waiting time, increases obviously with the peak hour demand. In the case study, the cost grows at least 30% when the peak hour visit frequency of the daily total visits increases from 5% (evenly distributed pattern) to 10% (the most common pattern for existing diesel fueling stations along I-75). Accounting for this peak hour effect in hydrogen refueling station planning is recommended. Overall, the waiting time model and cost analysis provide key inputs for optimizing hydrogen refueling station location and configurations based on anticipated refueling demand patterns. The paper is the second in a series that aims to build a comprehensive modeling plan and optimize hydrogen refueling infrastructure along the Interstate 75 (I-75) corridor for HDVs.

Liu, Yuandong↗

Validation of Transient Spacecraft Refueling Model with Gateway Breadboard Test Data

The ability to refuel spacecraft on-orbit is a key enabling technology for deep space human exploration. On-orbit refueling requires priming a pressurized liquid propellant from a source tank into fluid transfer lines at vacuum conditions, which could result in excessive surge pressures beyond the system’s qualified operating limits and potentially damage hardware. Another source of potentially damaging surge pressures is the water hammer transient that occurs when the isolation valves are closed to pause or end the refueling operation. Therefore, it is imperative to employ numerical models during the development of flight hardware to parametrically characterize system performance over a wide range of operating conditions to minimize the risk of exceeding pressure limits during flight. Since rapid pressure transients can be difficult to model accurately, it is important to validate those models with test data. As part of the Gateway bipropellant refueling system development, a simplified fluidic breadboard system was created using water as a simulant for fuel to support early program risk reduction of refueling operations. The objectives of breadboard testing were to gather performance data to characterize and demonstrate critical refueling operations and to validate numerical models that can be extended to predicting flight system performance. A description of the breadboard test article and the results of numerical model validation is presented. The model is shown to have very good agreement with test data.

Refueling↗

Challenges in the designing, planning and deployment of hydrogen refueling infrastructure for fuel cell electric vehicles

Hydrogen can power transportation with near zero greenhouse gas emissions. With government support, early market development is now underway in several nations thanks to technological advances in fuel cell vehicles and electricity generation from renewable energy. Deploying a sustainable hydrogen refueling infrastructure faces methodological and practical challenges ranging from the creation of appropriate codes to managing the co-evolution of the refueling network and growth of the stock of hydrogen fuel cell vehicles. Furthermore, this paper presents a comprehensive review of the challenges facing the designing, planning and deployment of hydrogen refueling infrastructure progress to date and outlook for the future. The design and costs of refueling infrastructure as well as the lifecycle environmental effects of hydrogen vehicles depend on how hydrogen is produced and delivered to refueling stations. In recent years, important advances have been made in methods for planning the numbers, sizes and location of hydrogen stations. Institutional barriers are also gradually being overcome. Co-evolving the deployment of stations and the demand for fuel cell vehicles remains a crucial subject for future research.

33 ADVANCED PROPULSION SYSTEMS↗

AHTR Refueling Systems and Process Description

The Advanced High-Temperature Reactor (AHTR) is a design concept for a central station-type [1500 MW(e)] Fluoride salt-cooled High-temperature Reactor (FHR) that is currently undergoing development by Oak Ridge National Laboratory for the US. Department of Energy, Office of Nuclear Energy's Advanced Reactor Concepts program. FHRs, by definition, feature low-pressure liquid fluoride salt cooling, coated-particle fuel, a high-temperature power cycle, and fully passive decay heat rejection. The overall goal of the AHTR development program is to demonstrate the technical feasibility of FHRs as low-cost, large-size power producers while maintaining full passive safety. The AHTR is approaching a preconceptual level of maturity. An initial integrated layout of its major systems, structures, and components (SSCs), and an initial, high-level sequence of operations necessary for constructing and operating the plant is nearing completion. An overview of the current status of the AHTR concept has been recently published and a report providing a more detailed overview of the AHTR structures and mechanical systems is currently in preparation. This report documents the refueling components and processes envisioned at this early development phase. The report is limited to the refueling aspects of the AHTR and does not include overall reactor or power plant design information. The report, however, does include a description of the materials envisioned for the various components and the instrumentation necessary to control the refueling process. The report begins with an overview of the refueling strategy. Next a mechanical description of the AHTR fuel assemblies and core is provided. The reactor vessel upper assemblies are then described. Following this the refueling path structures and the refueling mechanisms and components are described. The sequence of operations necessary to fuel and defuel the reactor is then discussed. The report concludes with a discussion of the levels of maturity of the various SSCs to provide guidance for future technology developments. The conceptual design information presented in this report is very preliminary in nature. Significant uncertainty remains about several aspects of the process and even the radiation and mechanical performance of plate-type coated-particle fuel.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AHTR Refueling Systems and Process Description

The Advanced High-Temperature Reactor (AHTR) is a design concept for a central station-type [1500 MW(e)] Fluoride salt–cooled High-temperature Reactor (FHR) that is currently undergoing development by Oak Ridge National Laboratory for the US. Department of Energy, Office of Nuclear Energy’s Advanced Reactor Concepts program. FHRs, by definition, feature low-pressure liquid fluoride salt cooling, coated-particle fuel, a high-temperature power cycle, and fully passive decay heat rejection. The overall goal of the AHTR development program is to demonstrate the technical feasibility of FHRs as low-cost, large-size power producers while maintaining full passive safety. The AHTR is approaching a preconceptual level of maturity. An initial integrated layout of its major systems, structures, and components (SSCs), and an initial, high-level sequence of operations necessary for constructing and operating the plant is nearing completion. An overview of the current status of the AHTR concept has been recently published, and a report providing a more detailed overview of the AHTR structures and mechanical systems is currently in preparation. This report documents the refueling components and processes envisioned at this early development phase. The report is limited to the refueling aspects of the AHTR and does not include overall reactor or power plant design information. The report, however, does include a description of the materials envisioned for the various components and the instrumentation necessary to control the refueling process. The report begins with an overview of the refueling strategy. Next a mechanical description of the AHTR fuel assemblies and core is provided. The reactor vessel upper assemblies are then described. Following this the refueling path structures and the refueling mechanisms and components are described. The sequence of operations necessary to fuel and defuel the reactor is then discussed. The report concludes with a discussion of the levels of maturity of the various SSCs to provide guidance for future technology developments. The conceptual design information presented in this report is very preliminary in nature. Significant uncertainty remains about several aspects of the process and even the radiation and mechanical performance of plate-type coated-particle fuel.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗