The costs of delaying remediation on human, ecological, and eco-cultural resources: Considerations for the Department of Energy: A methodological framework
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Several different types of aerogel and/or xerogel scaffolds have been demonstrated as effective sorbents for the capture and immobilization of radionuclides in gaseous form [e.g., iodine gas or I2(g), Xe] as well as ionic form (e.g., Ce4+, Cs+, I–, IO3-, Rb+, Sr2+, 99Tc7+, and U6+). These scaffolds have unique properties, which include high specific surface areas, high pore volumes, varieties of pore sizes, and functionalities that provide methods for binding radionuclides through physisorption, chemisorption, or a combination thereof. This combination of properties and functionalities make these types of materials ideal scaffolds for use as sorbents for capturing radionuclides. The primary base materials that will be discussed in this chapter include Ag0-functionalized silica aerogels, Ag+-impregnated aluminosilicate aerogels, Ag0-functionalized aluminosilicate aerogels, metal-impregnated (non-Ag) aluminosilicate aerogels and xerogels, sulfide-based aerogels, and carbon-based aerogel composites. For the capture of I2(g), the materials reported herein show some of the highest iodine loadings ever reported for inorganic sorbents. For the capture of ionic species, these materials also show promise to be some of the next generations of materials for active radionuclide remediation. This progress report will describe how these materials are fabricated, the general properties of these materials, as well as an overview of how they have been used for different applications in environmental remediation of radionuclides.
Changes to surface structure and chemistry occurring throughout the functional lifetime of lithium-ion batteries (LIBs) may impact the effectiveness of end-of-life rejuvenation methods. Solvent washing prior to electrochemical relithiation is shown to both increase relithiation efficacy and beneficially alter the interfacial chemistry of heavily degraded industrial cathode material. Four common solvents (acetone, diethyl carbonate, isopropyl alcohol, propylene carbonate) are employed to investigate the role of varying physicochemical solvent properties on the mechanism of capacity recovery. Electrochemical (dQ/dV, EIS), structural (XRD), and chemical (SPME-GC-MS) analysis techniques are employed to comprehensively analyze solvent-cathode interactions. Highly nucleophilic solvents (acetone, DEC) are found to reduce cathode charge-transfer impedance and enable stable impedance growth throughout subsequent cycling. The use of nucleophilic solvents under mechanically aggressive washing conditions may also enable the reintroduction of bulk lattice oxygen, thereby restoring anionic redox capacity. Further, the four solvents are found to selectively remove a subset of surface species from the aged cathode material, including residual electrolyte, additives, and electrolyte-additive reaction products, which are qualitatively analyzed. Surface species removal by each solvent is correlated with the electrochemical performance of the correspondingly washed cathode, highlighting the importance of an optimized washing protocol to effective remediation in the context of direct LIB recycling. For the material under study, the use of a simple acetone washing protocol prior to electrochemical relithiation enables up to 174% capacity recovery relative to unwashed/relithiated black mass.
Lead (Pb) contamination of soils is of global concern due to the devastating impacts of Pb exposure in children. Because early-life exposure to Pb has long-lasting health effects, reducing exposure in children is a critical public health goal that has intensified research on the conversion of soil Pb to low bioavailability phases. Recently, plumbojarosite (PLJ) conversion of highly available soil Pb was found to decrease Pb relative bioavailability (RBA <10%). However, there is sparse information concerning interactions between Pb and other elements when contaminated soil, pre- and post-remediation, is ingested and moves through the gastrointestinal tract (GIT). Addressing this may inform drivers of effective chemical remediation strategies. In this study, we utilize bulk and micro-focused Pb X-ray absorption spectroscopy to probe elemental interactions and Pb speciation in mouse diet, cecum, and feces samples following ingestion of contaminated soils pre- and post-PLJ treatment. RBA of treated soils was less than 1% with PLJ phases transiting the GIT with little absorption. In contrast, Pb associated with organics was predominantly found in the cecum. These results are consistent with transit of insoluble PLJ to feces following ingestion. The expanded understanding of Pb interactions during GIT transit complements our knowledge of elemental interactions with Pb that occur at higher levels of biological organization.
Self-assembled nanoribbons from small molecule amphiphiles with a structural domain to impart mechanical stability and chelating head groups are reported for the remediation of lead from contaminated water. The nanoribbons' remediation capacity is affected by pH and the presence of competing cations, and can be modulated by head group choice.
No abstract available
Not Available
Several nations are faced with the need to remediate large contaminated sites following World War II, the Cold War, and abandoned industrial sites, and to return them to productive land uses. In the United States, the Department of Energy (DOE) has the largest cleanup challenge, and its Hanford Site in the state of Washington has the most extensive and most expensive cleanup task. Ideally, the risk to ecological resources on remediation sites is evaluated before, during, and after remediation, and the risk from, or damage to, ecological resources from contaminants should be lower following remediation. In this paper, we report the risk to ecological resources before, during, and as a consequence of remediation on contaminated units requiring cleanup, and then examine the causes for changes in risk by evaluating 56 cleanup evaluation units (EUs) at the Hanford Site. In this case, remediation includes a restoration phase. In general, the risk to ecological and eco-cultural resources is currently not discernible or low at most contaminated units, increases during remediation, and decreases thereafter. Remediation often causes physical disruption to ecosystems as it reduces the risk from exposure to contaminants. Most new remediation projects at the Hanford Site include ecological restoration. Ecological restoration results in the potential for the presence of higher quality resources after remediation than currently exists on these contaminated lands and facilities. Although counter-intuitive, our evaluation of the risk to ecological resources following remediation indicated that a significant percentage of units (61%) will be at increased risk in the post-remediation period. This increased risk is due to DOE's successful remediation and restoration that results in a higher percent of native vegetation and higher ecological value on the sites in the post-remediation period than before. These newly-created resources can then be at risk from post-remediation activities. Risks to these new higher quality resources include the potential for spread of invasive species and of noxious grasses used in previous cleanup actions, disruption of ecosystems (including those with state or federally listed species and unique ecosystems), compaction of soil, use of pesticides to control invasive species, and the eventual need for continued monitoring activities. Thus, by greatly improving the existing habitat and health of eco-receptors, and maintaining habitat corridors between high quality habitats, the ecological resources in the post-remediated units are at risk unless care is taken to protect them. Many of the negative effects of both remediation and future monitoring (or other future land uses) can be avoided by planning and management early in the remediation process. We suggest DOE and other agencies convene a panel of managers, remediation scientists, regulators, environmental and ecological scientists, Native Americans, economists, and the public to develop a generic list of performance metrics for the restoration phase of remediation, including evaluation of success, which could be applied across the DOE complex.
Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.
The environmental remediation capabilities of nanoparticles were reviewed and evaluated. Nanoparticles (NPs) have been used to remediate various forms of environmental contamination. Various materials, morphologies, and conditions are required to remediate different contaminants. Nanoparticles may have benefits and/or limitations compared with traditional remediation methods. New techniques are being applied to mitigate the limitations of NPs. Nanomaterials are a promising technology for the environmental remediation. NPs have been used for the remediation of aqueous and atmospheric contaminants. Nanoparticles have been used to sequester contaminants toxic to human and environmental health. Various materials, morphologies, and conditions are necessary for the remediation of different contaminants. The remediation of heavy metals is of significant concern. Contaminants may be remediated by means of sorption or reduction. The remediation capability of nanoparticles is promising due to their high surface area and reactivity. Reaction kinetics are, therefore, notably fast. These characteristics make NPs attractive for environmental remediation. Various NPs have been used as sequestering agents for environmental contaminants. NPs have been used to remediate heavy metals as well as organic contaminants. Technical Objectives: Assess viability of nanoparticles (NPs) for environmental remediation; Review benefits and limitations of NPs; Design future experiments to test remediation capabilities of NPs. Future Plans: Create NP filters for remediation - Grow Au NPs on Stainless Steel Wool: Stainless steel wool has many defects and crevices allowing the Au NPs to grow on the surface; Stainless steel wool will not react with the heavy metal contaminants tested; NPs are embedded, so they do not have to be removed from solution. Test sorption capabilities with heavy metal contaminants in aqueous solution. Benefits of Gold NPs: Corrosion/oxidation resistant; Exhibit visible/near IR plasmon resonance; Can be synthesized by solution chemistry: cost efficient and easily scalable. Surfactants: Used to lower surface energy and prevent aggregation; Sodium citrate: anionic surfactant (-); Cetyltrimethylammonium bromide (CTAB): cationic surfactant (+); Ionic surfactants create charged NPs; Charged NPs can be used to sequester ionic contaminants (eg. heavy metals)
The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)
A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)
A key to success, during all aspects of the remediation process on legacy uranium sites, and easily transferable between countries and projects, is the integration of local knowledge. However, before this knowledge can be integrated, local trust and project understanding must be developed. Local trust and project understanding can only be developed through a principle-centred approach to a shared project vision, two-way communication of knowledge, alignment of project goals, and understanding the local needs early in the remediation process. Once public confidence is obtained, local trust and project understanding must be maintained throughout the entirety of the remediation process. Project understanding is an ongoing endeavor that needs continuous communication and varied methods to succeed. During the management of assessment, remediation, and post remediation monitoring on the Saskatchewan Research Council's CLEANS project (remediation of 37 legacy uranium mine sites in Northern Saskatchewan, Canada), integration of local knowledge has been an instrumental tool attributing to success. During site assessment, integration of local knowledge has included the development and implementation of land use surveys to determine realistic travel and occupancy on and adjacent to these legacy sites, and site specific traditional knowledge and land use studies that have contributed to the development of a detailed knowledge of local land use, resource utilization, country food intake, and human history of the sites. The local knowledge gained during the assessment process is invaluable as it provides information required to support remediation planning, such as: valued ecosystem components, human trophic utilization, length of site occupancy, cultural value assessment, and future land use considerations. During remediation planning, local and traditional knowledge can also be incorporated through determination of plant species suitability for revegetation, development and selection of remediation options, and setting realistic sustainable development targets for local project inclusion. During site remediation operations, local involvement can be utilized through direct labour and equipment, cultural resource monitoring (i.e. archaeological and heritage protection), local logistics and historic information transfer, and stakeholder communications and engagement support. Post remediation, local involvement is an efficient mechanism for long-term monitoring, and care and maintenance activities. Although there may be differences between countries, regions and sites, the remediation process on legacy uranium mines can universally be more successful through the integration of local knowledge; while developing rights/stakeholder engagement and capacity building. (authors)
Uranium mining and milling legacy sites still exist all over the world. Financial constraints play a key role in constraining the remediation of these sites, but a series of other factors must also be considered. The IAEA has been assisting its Member States in moving forward their remediation projects, and more specifically the Central Asian region has received dedicated attention in this aspect. In association with other international organisations such as the European Commission and European Bank of Reconstruction and Development among others in the scope of the CGULS initiative (Coordination Group of Uranium Legacy Sites), a series of activities have been put in place to assist the countries in that region. Through its Technical Cooperation Department, the IAEA has also supported other Member States to manage their legacies. The IAEA CIDER Project (Constraints in Decommissioning and Environmental Remediation) in its first phase investigated possible constraint to implementation of both decommissioning and environmental remediation projects, and collected successful experiences and lessons learned from remediation projects all over the world. It started with a survey in which almost 30 Member States participated. Constraints were examined in three main areas: i) Institutional Aspects (regulatory and policy); ii) Technological and iii) Social. These results have been published in a dedicated report available in the IAEA web page (also called the CIDER Baseline Report). Under the request of participating Member States, a second phase of CIDER has been initiated with a more focused (action oriented) character. In this regard experts developed a framework for helping countries in need under two major areas: Strategy Development and Implementation and Stakeholder Engagement Support. Two other initiatives under CIDER Phase II consisted of the Enhanced Capacity Building in Environmental Remediation (the so-called School of Environmental Remediation) and a database depicting the sites in and in need of remediation in a global perspective. This paper is intended to present and promote some aspects of the methodology conceived in CIDER Phase II to help countries establish remediation strategies that will facilitate overcoming some of the barriers mentioned above. Furthermore, it aims to discuss aspects that might be improved in the assistance provided by international organisations to countries in need of developing remediation projects, pointing out to some of the documented causes for not achieving more robust results. It is expected that the combination of different tools to share good practices e.g. web-based tools, e-Learning, webinars in addition to face-to-face training events, may enhance the chances of successful implementation of remediation of legacy sites, including former uranium production sites. This initiative opens a wide avenue for cooperation while providing a platform to bring together practitioners, regulators, contractors, funding organisations to enhance the support to be provided. By working together, more effective and sustainable results can be achieved and remediation of such sites implemented in a timely, safe and cost-effective way. (authors)
The Fernald Preserve, Ohio, Site underwent restoration and remediation under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). With the exception of the Great Miami Aquifer, the CERCLA remediation was declared physically complete on October 29, 2006, and the site was turned over to the US Department of Energy Office of Legacy Management for long-term care and maintenance. The Record of Decision under CERCLA specifies a concentration-based cleanup that requires the extraction and treatment of Great Miami Aquifer groundwater above Final Remediation Levels (FRLs) until the full, beneficial use potential of the aquifer is achieved, including use as a drinking water source. The area of the aquifer targeted for remediation is 126.5 hectares (312.70 acres). The groundwater pumping remediation was designed by modeling cleanup with the Variable Saturated Analysis Model in 3 Dimensions (VAM-3D) modeling code, developed by Hydrogeologic Inc. The original design called for 23 extraction wells operating at 379 liters per minute (lpm) (100 gallons per minute [gpm]) to 1135 lpm (300 gpm) each for a system total of 18,073 lpm (4775 gpm). In 2014, the system was optimized down to 20 extraction wells operating at 379 to 1893 lpm each for a system total of 19,180 lpm (5075 gpm). To date, pumping has been an effective remediation technology for the aquifer. At the end of 2017, the area of the aquifer remaining above FRLs was down to 38.2 hectares (94.4 acres). From August 1993 through December 2017 (24 years), 6235 kilograms (kg) (13,733 pounds) of uranium were removed from the aquifer by the pumping of 1.74 x 10{sup 11} liters (46.2 billion gallons) of water. Since 2010, treatment of groundwater to achieve regulatory discharge limits at the Great Miami River has not been needed on a routine basis. The ongoing remediation is now essentially a pumping operation, and this water does not require treatment. Metrics reported in the annual Site Environmental Report for the groundwater remediation indicate that, based on the model-predicted estimate of the mass of uranium that needs to be removed from the aquifer to achieve a concentration-based cleanup, the cleanup is approximately 86% - 87% complete. Current model predictions indicate that pumping will need to continue an additional 16 years (until 2035) in some of the wells. During the additional 16 years, it is estimated that approximately 1012 kg (2231 pounds) of uranium will be removed from the aquifer. System pumping rates are designed to decrease over the course of the remaining 16 years, dropping down to a system total of 11,638 lpm (3075 gpm) in 2022 and a system total of 4163 lpm (1100 gpm) in 2033. Even with the designed decreases in pumping rates, it is estimated that approximately 1 x 10{sup 11} liters (26.6 billion gallons) of water will be pumped from the aquifer to remove 1012 kg (2231 pounds) of uranium. This indicates that the remaining 16 years of operation will be much less efficient than the first 24 years. Decreasing efficiency is common for pumping operations. The worst-case scenario is that decreasing concentration trends stabilize above the cleanup FRLs and remediation goals are never achieved. Performance assessments of the pumping remedy will need to be routinely conducted to determine if pumping should be discontinued, if it should be continued but optimized, or if the pumping technology can be supplemented with a different technology that will improve the outcome of the remediation and make the operation more efficient and successful. (authors)
Lead exposures from legacy sources threaten children’s health. Soil in Omaha, Nebraska, was contaminated by emissions from a lead smelter and refinery. The U.S. Environmental Protection Agency excavated and replaced contaminated soil at the Omaha Lead Superfund Site between 1999 and 2016. The goal of this study was to assess the association of soil lead level (SLL) and soil remediation status with blood lead levels (BLLs) in children living near or on the site. We linked information on SLL at residential properties with children’s BLLs and assigned remediation status to children’s BLL measurements based on whether their measurements occurred during residence at remediated or unremediated properties. We examined the association of SLL and remediation status with elevated BLL (EBLL). We distinguished the roles of temporal trend and the intervention with time-by-intervention-status interaction contrasts. All analyses estimated odds ratios (ORs) with a generalized estimating equations approach to ensure robustness under the complex correlations among BLL measurements. All analyses controlled for relevant covariates including children’s characteristics. EBLL (> 5 μg/dL ) was associated with both residential SLL [e.g., OR=2.00; 95% confidence interval (CI): 1.83, 2.19; > 400–800 vs. ≤ 200 ppm] and neighborhood SLL [e.g., OR=1.85 (95% CI: 1.62, 2.11; > 400–800 vs. ≤ 200 ppm)] before remediation but only with neighborhood SLL after remediation. The odds of EBLL were higher before remediation [OR 1.52 (95% CI: 1.34, 1.72)]. Similarly, EBLL was positively associated with preremediation status in our interaction analysis [interaction OR=1.18 (95%CI: 1.02, 1.37)]. Residential and neighborhood SLLs were important predictors of EBLLs in children residing near or on this Superfund site. Neighborhood SLL remained a strong predictor following remediation. Our data analyses showed the benefit of soil remediation. Results from the interaction analyses should be interpreted cautiously due to imperfect correspondence of remediation times between remediation and comparison groups. https://doi.org/10.1289/EHP8657
Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. MNA can also be used after active remediation has been completed (e.g., pump-and-treat) as a polishing step to reach ultimate remedial action objectives. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When timescales for passive remediation extend to many decades, a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that receptors will not be impacted within the remediation timeframe.