Search NASA⌕ Search

SEARCH · Search NASA

Results for “Remote Canister Closure system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

DOESC Remote Canister Closure System UT Inspection Couplant Solutions

The DOE Standard Canister (DOESC) Remote Canister Closure System is a remotely operated welding and inspection mechanism designed for the packaging of DOE-managed spent nuclear fuel into canisters. The ultrasonic testing (UT) inspection, included in the system, requires the use of water tanks that are opened to act as a couplant between the canister and the sensors. With the couplant, the UT inspection can guarantee accurate results determining imperfections in the weld.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of SNF, most of which are located at the INL site. “Road-ready dry storage” is a management concept where SNF is packaged into dry, sealed canisters, which are then placed in on-site storage in anticipation of later removal. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE SNF for road-ready dry storage. In support of establishing a large-scale road-ready dry storage program at the INL site, the demonstration will package a select amount of DOE-managed SNF into DOE Standard Canisters. The closure process for the DOE Standard Canisters will include fuel and basket loading, welding, inspection, leak testing, and if needed, repair. As a follow-up to previous discussion on the design of the DOE Closure Leak Test Assembly, this report describes recent fabrication and testing efforts performed at INL. DOE Standard Canisters are sealed by two sequential gas tungsten arc welds. Both are performed by remotely operated and semi-autonomous welding systems. The first weld is a circumferential pipe weld that completes assembly of the canister body and lid assembly. The second and final closure weld connects the vent plug to the vent port with an identical butt joint to the circumferential pipe weld. After the second weld is performed on the vent port, these welds are helium leak tested using an inside-out technique. In addition to the commercially available vacuum and leak detector systems, the DOE Standard Canister Closure Leak Test Assembly was designed for both remote and manual operation. This report describes fabrication and performance testing associated with the inside-out technique. INL staff designed and tested systems to accomplish these tasks. Hardware fabrication occurred at INL facilities. Forthcoming work includes design optimization, integration to existing systems, and implementation to packaging demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗