Search NASA⌕ Search

SEARCH · Search NASA

Results for “Remote Work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Orbital construction support equipment - Manned remote work station

The Manned Remote Work Station (MRWS) is a versatile piece of orbital construction support equipment which can support in-space construction in various modes of operation. Proposed near-term Space Shuttle mission support and future large orbiting systems support, along with the various construction modes of MRWS operation, are discussed. Preliminary flight subsystems requirements and configuration design are presented. Integration of the MRWS development test article with the JSC Mockup and Integration Facility, including ground-test objectives and techniques for zero-g simulations, is also presented.

Nassiff, S. H.↗

Manned remote work station development article, executive summary

The mission requirements for the manned remote work station (MRWS) flight article and the manned remote work station open cherry picker development test article is defined. Considerations are given for the near, mid, and far term use of the MRWS with emphasis on its ultimate application: constructing the Solar Power Satellite.

Source record↗

Manned remote work station development article

The two prime objectives of the Manned Remote Work Station (MRWS) Development Article Study are to first, evaluate the MRWS flight article roles and associated design concepts for fundamental requirements and embody key technology developments into a simulation program; and to provide detail manufacturing drawings and schedules for a simulator development test article. An approach is outlined which establishes flight article requirements based on past studies of Solar Power Satellite, orbital construction support equipments, construction bases and near term shuttle operations. Simulation objectives are established for those technology issues that can best be addressed on a simulator. Concepts for full-scale and sub-scale simulators are then studied to establish an overall approach to studying MRWS requirements. Emphasis then shifts to design and specification of a full-scale development test article.

Source record↗

Manned remote work station development article. Volume 2: Simulation requirements. Appendix A: Open cherry picker development test articles specification

A manned remote work station (MRWS) mission scenario, broken down into the three time phases was selected as the basis for analysis of the MRWS flight article requirements and concepts. The mission roles for the three time phases, supporting tradeoff and evaluation studies, was used to identify key issues requiring simulation. The MRWS is discussed in terms of its capability to perform such operations as support of Spacelab experiments, servicing and repair of satellites, and construction. Future considerations for the use of the MRWS are also given.

Source record↗

Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

Source record↗

Manned remote work station development article. Volume 1, book 1: Flight article requirements. Appendix A: Mission requirements

The requirements for several configurations of flight articles are presented. These requirements provide the basis to design manned remote work station development test articles and establish tests and simulation objectives for the resolution of development issues. Mission system and subsystem requirements for four MRWS configurations included: open cherry picker; closed cherry picker; crane turret; and free flyer.

Source record↗

Manned remote work station - Safety and rescue considerations

It is noted that due to restrictions of payload and volume limitations of current and projected launch systems, space construction of ultralarge space structures is essential. The present paper discusses the concepts of a key piece of construction equipment needed to support assembly of such large structures. Attention is given to the manned remote work station (MRWS), a universal crew cabin to be used as a construction cherry picker, space crane turret, work station on a construction base rail system, or a free flyer. Concepts and safety and rescue requirements for this spacecraft are delineated for early applications in support of Shuttle operations, as well as applications in support of a mid to late 1980's space construction base. Finally, applications in support of constructing and maintaining a solar power satellite system are covered.

Nathan, C. A.↗

Cross-sectoral synergies for household energy savings: the role of electric vehicles, solar photovoltaics, and remote work

Over the past two decades, new technologies and behavioral shifts – such as electric vehicles, solar photovoltaics, and increased work-from-home practices – have reshaped residential electricity consumption and cost. However, their combined or synergistic impact on a household’s electricity cost remains unexplored. Leveraging data from the 2020 Residential Energy Consumption Survey, this study uses a structural equation model to unravel the extent to which the bundled adoption of EV-PV and stay-at-home decisions impact the total electricity cost of households. Results indicate that adopting both EVs and PV reduces electricity costs by 31% despite a 16% rise in consumption. When combined with stay-at-home practices, households still experience a 13% cost reduction, even with a 25% increase in electricity consumption. In conclusion, these findings suggest that financial savings are not merely a byproduct of adopting new technologies or behavioral changes but could serve as a key consideration for household contemplating engagement with multiple modern energy solutions simultaneously.

14 SOLAR ENERGY↗

Manned remote work station development article

Flight article and associated design concepts are evaluated to meet fundamental requirements of a universal crew cabin to be used as a construction cherrypicker, a space crane turret, a railed work station, or a free flyer. Key technology developments are embodied into a simulation program. A schedule and simulation test plan matrix is given for the open cabin cherry picker.

Source record↗

Remote Science Work Support, Context, and Approach on NASA's VIPER Mission

Returning humans to the Moon, sending humans for the first time to Mars will necessarily include an accompaniment of robotic vehicles. A mission work system will be needed that supports remote teams of humans and robots in cooperation (synchronous and asynchronous) with earthbound systems, engineering and science teams. All of these elements have individual development contexts and manners of operation; at the same time, all are in varying degrees conjoined during mission development stages and operations. As such, the assembly of elements (people, activities, disciplinary knowledge, and machines) that constitute a mission work system can be developed independently and cooperatively. Current missions and those in development, in keeping with NASA’s history of employing prior mission knowledge, will shape how and by which organizational schemas, or elements of, future missions will draw from, or wholly rely. NASA’s Volatiles Investigating Polar Exploration Rover mission, VIPER, presents an opportunity for a unique operational schema within the history of space exploration and remotely conducted science research.

science operations↗

Use of control umbilicals as a deployment mode for free flying telerobotic work systems

Work to date on telerobotic work systems for use in space generally consider two deployment modes, free flying, or fixed within a limited work envelope. Control tethers may be employed to obtain a number of operational advantages and added flexibility in the basing and deployment of telerobotic work systems. Use of a tether allows the work system to be separated into two major modules, the remote work package and the control module. The Remote Work Package (RWP) comprises the free flying portion of the work system while the Control Module (CM) remains at the work system base. The chief advantage of this configuration is that only the components required for completion of the work task must be located at the work site. Reaction mass used in free flight is stored at the Control module and supplied to the RWP through the tether, eliminating the need for the RWP to carry it. The RWP can be made less massive than a self contained free flying work system. As a result, reaction mass required for free flight is lower than for a self contained free flyer.

Kuehn, J. S.↗

Remote Concurrent Engineering: A-Team Studies in the Virtual World

NASA Jet Propulsion Laboratory’s (JPL’s)Architecture Team (A-Team) has nearly a decade of experiencein maturing early formulation mission and technology conceptsby combining innovative collaborative engineering methodswith cutting-edge subject matter expertise and advancedanalysis tools in an in-person environment. When COVID-19forced JPL’s workforce to work remotely in March 2020, ATeamhad to quickly pivot from an in-person collaborativeenvironment to a remote working environment.Through introspection, careful planning, and considerablepractice, A-Team was able to develop new operating proceduresto effectively continue early formulation studies in a virtualenvironment. A-Team has held over 57 remote studies in the 10months since the start of mandatory telework at JPL in March2020. In the remote setting, A-Team conducts studies in half-daysessions with clients and subject matter experts (SMEs) viavideoconferencing, shared computer screens, and digitalcollaborative tools.The key lesson is that increased staffing and planning is neededto prepare and successfully run remote A-Team studies. RemoteA-Team studies require careful selection of the appropriatetools for security, accessibility, and usability within theNASA/JPL environment. Knowledge capture methods andtemplates need to be thought out and agreed upon in advance asthere is less room for improvising in a remote format. Variouscommunication channels have to be monitored to allow for teamcoordination while maintaining fruitful participant engagementduring a session. In addition, technical backup for all roleswithin the A-Team have to be identified to allow the study tocontinue even if a team member’s connectivity is temporarilyinterrupted. Finally, careful thought has to be put into methodsand processes to create a collaborative environment in a virtualspace such that a group of experts who are only connected viathe internet can experience the creative spark and flow of a greatcollaborative and innovative study.

Zusack, Steven↗

Zooming in on virtual commutes: Telecommuting impacts on mobility and sustainability

Motivated by a societal shift towards remote work and rapid advancement in information and communication technologies, this study examines the impact of telecommuting on urban mobility across the nine counties of the San Francisco Bay Area, California. Utilizing a behaviorally realistic integrated agent-based transportation model and recent data on telecommuting patterns, we simulate the impact of multiple telecommuting scenarios on transportation system outcomes. This provides a comprehensive picture of the impact of remote work on travel costs and accessibility of all travelers, factoring in changes in mode use and congestion. We analyze how telecommuting influences broader societal factors such as transportation energy consumption. Our findings indicate that increased telecommuting reduces overall person miles traveled and transportation energy consumption. Furthermore, telecommuting results in externality benefits by improving accessibility and reducing commute times for non-telecommuters.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Analysis of Data from the Energetic Gamma-ray Experiment on the Gamma Ray Observatory

The work under the Grant has involved participation with the Compton Gamma Ray Observatory Energetic Gamma-Ray Experiment Telescope (EGRET) Team in the analysis of data obtained during instrument operations and the preparation of scientific papers and proposals for future observations. The Principal Investigator (PI) has been a co-author on a total of 90 papers published in refereed professional journals since the beginning of 1991, plus many other non-refereed publications, and contributed and invited papers at professional meetings and IAU telegrams. On seven of these papers he was the lead author. The EGRET team continues to submit IAU Astronomical telegrams and present many papers at scientific meetings. The effort by the PI has involved working remotely by internet connection on the Goddard Space Flight Center Computers where the EGRET data are archived. Students have monitored instrument performance, performed Viewing Period Analyses and analyzed data remotely. The PI has completed the detailed analysis of over 20 viewing periods to search for point sources and this work has been used in developing the first and second EGRET catalog of sources, published in Supplements to the Astrophysical Journal.

Kniffen, Donald A.↗