NASA NTRS2024
This Per- and Polyfluoroalkyl Substances (PFAS) Confirmatory Sampling (CS) Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document CS activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121, formerly known as the Area 3 Repeater Building (A3RB). A Phase I SWMU Assessment and Confirmatory Sampling Report (NASA 2019) and a Phase II and III SWMU Assessment and Confirmatory Sampling Report (NASA 2022b) were previously submitted detailing Center-Wide assessment activities performed at the John F. Kennedy Space Center (KSC) in Florida that identified 33 locations of concern and 19 areas of potential concern at KSC associated with the storage, use, or release of materials containing PFAS. A review of the analytical results from investigation derived waste samples collected in 2020 from the South Repeater Building area indicated concentrations of perfluorooctanesulfonic acid (PFOS) were above Florida Department of Environmental Protection (FDEP) provisional Groundwater Cleanup Target Levels of 70 nanograms per liter (ng/L) at a concentration of 1,750 ng/L. Following this review, the KSC Fire Chief was contacted; the Chief recalled fighting a brush fire in 1998 in the area, during which an unknown volume of aqueous film-forming foam was used to extinguish the fire. The Phase II and Phase III SWMU Assessment Report recommended this area proceed to CS. Historical results in this area are provided in Appendix A . PFAS CS activities were contracted at the South Repeater Building. Initial CS activities were conducted in accordance with the PFAS Assessment and Mitigation Work Plan (AECOM 2022), which was submitted to the NASA Remediation Project Management team and accepted by the team on November 1 and 8, 2021. The objectives of the PFAS CS were to: - - Confirm and begin to assess the extent of PFAS affected media in the South Repeater Building area. - - Identify locations for groundwater, soil, surface water, and soil core sampling. - - Qualitatively characterize the migration potential of released PFAS to environmental media (soil, groundwater, and surface water). The following activities were completed to meet the PFAS CS objectives: - - Installation of monitoring wells via direct push technology (DPT) and rotosonic techniques - - Groundwater, soil, and surface water sampling - - Collection of soil cores to evaluate site lithology - - Development of initial PFAS plume characterization