Search NASA⌕ Search

SEARCH · Search NASA

Results for “Repowering Evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Coronado Generating Station Repowering Evaluation - Siting Evaluation

The purpose of this initial siting evaluation is to consider the suitability of the Salt River Project (SRP) owned land at/near Coronado Generating Station (CGS) for a nuclear generating station (including advanced light water reactors, light water small modular reactors, and non-light-water designs1) and to assess if there are any exclusionary or avoidance factors associated with coal to nuclear repowering at CGS. This initial siting evaluation considers several characteristics (e.g., environmental conditions, seismic concerns, site footprint, water use, etc.) and highlights favorable/preferred characteristics as well as potential risks to feasibility. The results are intended to inform SRP on the strengths and weaknesses associated with the CGS site and inform the selection of candidate nuclear technologies for the CGS site that align with SRP’s mission and business objectives. This report relies on industry-recognized siting guidance, including Electric Power Research Institute’s (EPRI’s) Siting Guide (Reference 1) 2 and Nuclear Regulatory Commission’s (NRC’s) Regulatory Guide (RG) 4.7 (Reference 3), as well as nuclear domain expertise within the Gateway for Accelerated Innovation in Nuclear (GAIN), MPR Associates, Inc. (MPR), and the Idaho National Laboratory (INL).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Ghent Generating Station Nuclear Study: Siting Evaluation

The purpose of this initial siting evaluation is to assess the suitability of the PPL Corporation (PPL) owned land at/near the Kentucky Utilities Ghent Generating Station (GGS) for the deployment of advanced nuclear reactors and to determine if there are any exclusionary or avoidance factors associated with siting nuclear power at GGS. The formal siting process for a nuclear reactor requires a great level of time (i.e., multiple years), effort, and detail. The Electric Power Research Institute (EPRI) estimates the formal siting process could take a dedicated team between one and three years to complete. This initial siting evaluation considers several characteristics (e.g., environmental conditions, seismic concerns, footprint, water use, etc.) and highlights favorable/preferred characteristics as well as potential risks to feasibility. Potential risks were explored in greater detail to provide PPL with additional insights to support decision planning. The results indicate the strengths and weaknesses associated with the GGS site as a location for a nuclear generating station and are intended to inform PPL’s next steps. The results of this initial siting evaluation will also inform the selection of candidate nuclear technologies for the GGS site that align with PPL’s mission and business objectives.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of Suitability of Selected Set of Coal Plant Sites for Repowering with Small Modular Reactors

This report summarizes the approach that ORNL developed for screening a sample set of small coal stations for possible repowering with SMRs; the methodology employed, including spatial modeling; and initial results for these sample plants. The objective in conducting this type of siting evaluation is to demonstrate the capability to characterize specific sample coal plant sites to identify any particular issues associated with repowering existing coal stations with SMRs using OR-SAGE; it is not intended to be a definitive assessment per se as to the absolute suitability of any particular site.

Coal↗

A Circular Economy for Solar Photovoltaic System Materials: Drivers, Barriers, Enablers, and U.S. Policy Considerations

As PV capacity increases, owners are also decommissioning older system assets. Estimates based on a 30-year lifetime assumption found that cumulative U.S. end-of-life (EoL) PV modules could total one million metric tons (Mt) by 2030 and up to 10 million Mt by 2050 (Weckend, Wade, and Heath 2016). Beyond maintenance replacements, early retirements that are due to efficiency upgrades and extreme weather, as well as PV deployment beyond earlier expectations, would increase these projections. PV system owners must evaluate equipment management options for used modules and system components retired during maintenance activities, refurbishment, repowering and system decommissioning. PV manufacturers must also evaluate material management options from customer returns, defects, and scrap. Management options for early retired and EoL PV system material include reuse, repair for reuse, recycling-based resource recovery, storage, and disposal. Disposal of PV system material increases the burden on landfill capacity, while reuse, repair for reuse, and recycling-based resource recovery (reuse/repair/recovery) options salvage valuable materials and provide secondary market opportunities and ancillary benefits (Weckend, Wade, and Heath 2016; EPA 2019c; SWEEP 2019). PV system owners may also decide store used modules and components as spares, or in the interim before a reuse or EoL management decision is made. Despite potential secondary market opportunities and the potential benefits associated with the repair/reuse/recovery of PV system material, anecdotal evidence suggests that in the United States decommissioned PV modules are stored, landfilled or otherwise disposed of (Salim et al. 2019; CPUC 2019b; DTSC 2019b; NREL 2019a). Some modules are being disposed of in municipal nonhazardous landfills and federally regulated hazardous treatment, storage, and disposal facilities, and others are being stored in warehouses until economically viable repair/reuse/recycling becomes available (CPUC 2019b; DTSC 2019b; NREL 2019a; Libby and Shaw 2018). As awareness of current practices grows, and the demand for critical PV module material increases, U.S. industry stakeholders, regulators, and policymakers are starting to (1) consider solutions to drive and enable environmentally sustainable materials management decisions and behaviors and (2) identify barriers to a circular economy for PV system materials. Circular economy principles attempt to transition from a "take-make-consume-dispose" linear economic system to a circular system that allows for the long life, and the reuse/repair/recovery of products and materials (Ellen MacArthur Foundation 2020). We begin this report by summarizing the drivers, barriers, and enablers to a circular economy for PV system materials in the United States. We then report on our analysis of federal and state regulatory considerations that may impact the repair/reuse/recovery of PV materials, and potential civil and criminal liabilities associated with noncompliance. We then discuss state policies and initiatives in the United States that expressly address PV system decommissioning and repair/reuse/recovery of PV materials. We conclude by providing case studies of U.S. business models for the repair/reuse/recovery of PV system materials. Our results are based on legal and literature-based research and interviews with solar industry stakeholders, regulators, and policymakers.

14 SOLAR ENERGY↗

A New Chapter in Solar: Bifacial PV from Emerging Topic to Core Curriculum

Associated with the new edition of the bifacial PV book, this talk reviews the transition of bifacial PV from niche innovation to standard practice, including progress in modeling and performance evaluation, and ongoing challenges in reliability, new applications, and fleet repowering.

14 SOLAR ENERGY↗

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Repowering: The Other Side of the Reliability Coin

Extreme weather, cracked backsheets, severe PID, poorly built modules, and installation flaws - all can compromise a solar plant's health and force repowering long before end of life. With more than 70% of U.S. PV capacity less than seven years old, the fleet is young, but its rapid expansion has introduced new materials and system designs that are still being tested under real-world conditions. As a result, reliability - not economics - is what most often drives repowering decisions. Repowering is frequently assumed to be an economically motivated choice, but our work shows that reliability concerns are the real trigger. Drawing from industry interviews, case studies, and modeling, we highlight the physical, electrical, and policy barriers owners face when deciding whether to repair, repower, or decommission. At the same time, repowering can create opportunities: renewed interconnection periods, improved energy yields, and strategic upgrades to extend system value. We present a quantitative framework using NLR's System Advisor Model (SAM) and PV in Circular Economy (PV ICE) tool to evaluate trade-offs across financial, material, and energy impacts. These findings provide practical guidance for navigating the realities of repowering today and underscore the critical role of reliability in shaping the future performance and sustainability of the PV fleet.

14 SOLAR ENERGY↗

Optimizing Repowering and Lifecycle Decisions with PV ICE and SAM

Should you repower or extend the life of your PV system? Are high-efficiency modules, durable modules, or recyclable modules the best option for your site and goals? Evaluating the trade-offs in design and lifecycle strategies can be complex. The PV in Circular Economy (PV ICE) tool is an open-source model designed to help developers, modelers, and decision-makers assess material flows, energy return on investment (EROI), and financial viability of PV systems. Now integrated with the System Advisor Model (SAM), PV ICE enables site-specific comparisons of lifecycle strategies - such as repowering benefits, module selection for reliability and recyclability, among others. This interactive tutorial will provide hands-on experience with PV ICE using Google Collab, exploring scenario-based analyses on these topics.

36 MATERIALS SCIENCE↗

Optimal control of a repowered vehicle: Plug-in fuel cell against plug-in hybrid electric powertrain

This paper describes two different powertrain configurations for the repowering of a conventional vehicle, equipped with an internal combustion engine (ICE). A model of a mid-sized ICE-vehicle is realized and then modified to model both a parallel plug-in hybrid electric powertrain and a proton electrolyte membrane (PEM) fuel cell (FC) hybrid powertrain. The vehicle behavior under the application of an optimal control algorithm for the energy management is analyzed for the different scenarios and results are compared.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Update on Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants

Under an award issued by the U.S. Department of Energy (DE-FE0031535), the Electric Power Research Institute (EPRI) is leading project to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants (including both subcritical and supercritical cycle configurations). The retrofit upgrade options are focused on evaluating increasing main steam and reheat steam temperatures from 1000°F (538°C) to hotter temperatures, ranging from ultra-supercritical (USC) (i.e., 1100°F or 593°C) to advanced USC (AUSC) conditions (≥1300° or 704°C) while maintaining steam pressures at their original values. By maintaining the original operating steam pressures as well as the original boiler and furnace enclosure envelopes, we aim to minimize the modifications required to the existing power plant, while still providing a significant improvement in heat rate. A unique aspect of this study is that the economic value of the heat rate improvement of each technically feasible option will be determined by detailed modeling of unit dispatch, over the remaining future plant life, in several regional power markets, using EPRI’s US-REGEN model. The capital cost estimates will be compared to the increased revenue estimated by the dispatch modeling to determine the overall economic attractiveness of each upgrade option. The results of this study have the potential to be applicable at up to 80% of the existing U.S. coal-fired power generation fleet. The project team, led by the Electric Power Research Institute, has completed the technical feasibility evaluation, and is currently executing the unit dispatch and capital cost evaluation portions of the work scope. This will describe the motivation for the project, explain the project’s structure and schedule, and provide details on the work scope and preliminary results of the technical feasibility evaluation.

01 COAL, LIGNITE, AND PEAT↗

FutureGen 2.0 Monitoring Systems Design Basis and Technology Selection: Geohydrologic, Geochemical and Geophysical Considerations

Advances in carbon capture and storage (CCS) technology show promise for addressing carbon dioxide (CO 2 ) emissions and global climate change concerns related to coal-fueled energy. The FutureGen 2.0 Project is intended to demonstrate 1) the technical feasibility of oxy-combustion technology as an approach for implementing carbon capture at new and existing coal-fueled energy facilities, and 2) utility-scale integration of transport and permanent storage of captured CO 2 in a deep geologic formation. Development of the FutureGen 2.0 CO 2 storage site is part of a larger project to design, build, and operate a commercial-scale CCS system capable of capturing, treating, and storing the CO 2 off-gas from a 168-MW(e) gross capacity oxy-combustion coal-fueled power plant located in Meredosia, Illinois—a first-of-its-kind, near-zero emissions coal-fueled power plant with CCS. In cooperation with the U.S. Department of Energy, the FutureGen 2.0 project partners will repower a previously retired oil-fired power plant with oxy-combustion technology to capture approximately 1.1 million metric tons of CO 2 each year—more than 90 percent of the plant’s carbon emissions. Emissions such as sulfur oxides, nitrogen oxides, and mercury will be reduced to near-zero levels. Safe and proven pipeline technology will be used to transport the CO 2 to the storage site and inject it deep into the subsurface through a network of deep-injection wells for long-term storage through geologic sequestration. An evaluation that considered pertinent hydrologic, geochemical, and geophysical processes was performed during development of the testing and monitoring program for the FutureGen 2.0 project. This evaluation informed the technology screening process and, in conjunction with project- and regulation-driven monitoring objectives, was the basis for monitoring technology selection. A summary of the overall monitoring approach adopted by the FutureGen 2.0 project, and a detailed description of the testing and monitoring activities that the FutureGen Industrial Alliance, Inc. will undertake at the FutureGen 2.0 storage site near Jacksonville, Illinois, are documented in a project-maintained testing and monitoring plan. All testing and monitoring activities will be performed in accordance with Title 40 of the Code of Federal Regulations (CFR) Sections 146.89, 146.90, and 146.91 (40 CFR §146.89, 146.90, and 146.91) to verify that the storage site is operating as permitted and is not endangering any underground sources of drinking water (USDWs).

54 ENVIRONMENTAL SCIENCES↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Powering Circularity Through Data Reporting and Collection

Sustainability and Circular Economy have many metrics for evaluation. Calculating mass intensity, energy return on investment, financial payback, and recycling rate for proposed technology changes and lifecycle management can support decision making. Robust data with modeling tools can perform these calculations, informing good decision making. Analyses show that reliability is more critical than recyclability. Improved data gathering and tool accessibility will support our industry to make more circular choices for PV lifecycle management.

14 SOLAR ENERGY↗

FutureGen 2.0 Oxy-Coal Combustion Carbon Capture Plant Pre-FEED Design and Cost

This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (instead of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.

Flanigan, Tom↗

Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC (Final Report)

Alstom Power Inc., a wholly owned subsidiary of the General Electric Company (GE) recently completed “Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC” under Award No. DE-FE0026183 for the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL). This project developed a design for testing of a high temperature nickel-based superalloy thick-walled header to simulate cycling and flexible plant operation in new and existing plants. The objective was to simulate the expected thermal stresses of a new AUSC plant or a retrofit header in an existing plant to improve flexible dynamic operation while maintaining component integrity and overall power plant reliability. The high performance superalloy materials that enable higher operating temperatures and pressures can support future transformational power technologies including new AUSC plants at 4250-5000 psi, 730°C/760°C or will serve as a replacement component in a repowered or retrofit USC coal powered cycling plant at 3600 psi, 600°C. These alloys can also enable supercritical CO2 cycles, nuclear power, solar power and more efficient natural gas combined cycle units as targeted by the U.S. DOE/NETL Cross-Cutting Research Technology Program Plan. Recently developed advanced nickel alloys such as Inconel 740H (740H) and Haynes 282 (H282) have been successfully tested on a pilot scale for fireside corrosion using steam loop tubing at AUSC temperatures of 760°C in actual operating coal fired boiler. These high strength materials have been demonstrated their adequacy for use in other high temperature boiler components such as superheater tubes. Thick-walled superheater outlet headers which operate at high temperatures and pressure under severe cycling condition are considered as one of the most critical component in the AUSC coal fired boiler. Over the design life of a plant, these headers are exposed to the most severe fatigue and creep damage accumulation and need to be properly designed for the expected cycling in an AUSC plant with flexible operation. These materials need to demonstrate adequate design life of 20 to 30 years for creep and fatigue conditions. The following tasks were performed: 1. A conceptual design was developed of a thick-walled component representative of typical headers with several tube connections and proper flow rates (~100,000 lbs/hr) suitable for Phase II test at 760°C operation. This was based on a process analysis of expected full scale new and component retrofit designs for AUSC; 2. A multi-physics flow and heat transfer computational fluid dynamics (CFD) analysis of the component for proper layout of the header configuration, number and geometry (size) of tubes required for bypass flow, flow rates through the tubing, and sectional pressure drops was performed. Steam to header metal heat transfer film coefficients in the header section and the tubes during the two stages (half load and full load) of the cycling operation were evaluated and used in the stress analysis; 3. Detailed analytical evaluation of the thick-walled pipe and tube connections for mechanical integrity under cycling conditions was performed. This included transient thermal stress analysis and fatigue usage estimation including the tube-to-pipe weld geometries and weld materials; 4. A layout and design of the thick-walled test component was developed and instrumentation required for a test was identified; 5. Continuum Damage Mechanics (CDM) creep prediction models were extended to 740H and H282 and validated with public data on 740H and H282 for use in creep analysis. In addition, detailed creep analyses were performed separately for the design life of the conceptual AUSC superheater outlet header using these General Electric (GE) creep constitutive models. GE was the prime contractor for the project, which was directed by Principal Investigator Robert Schrecengost and Lead Scientist Dr. B. Reddy Ganta. Other collaborative participants in this project included GE Global Research, GE Boiler Engineering, and a Technical Consultant from EPRI.

01 COAL, LIGNITE, AND PEAT↗

Biogas Utilization in Refuse Power Plants (BURP 2 )

The BURP 2 project investigated the technical and financial viability of co firing biogas with waste coal for power generation while using carbon capture and sequestration to achieve net negative emissions. A comparative assessment integrating geospatial mapping, technoeconomic analysis, and life cycle analysis was carried out to evaluate retrofitting an existing coal fired facility in West Virginia, versus developing a new greenfield power plant in Kentucky located near a low quality coal resource. The study found that CO 2 capture rates of 90% or higher, in combination with biogas feedstocks such as animal manure, could significantly reduce global warming potential compared to plants using neither biogas nor CO 2 capture systems. Economic feasibility depended heavily on federal tax credits and proximity to fuel sources. In both greenfield and retrofit scenarios, access to biogas played a key role. Because the retrofit site was located close to existing biogas resources, it represented a feasible option, whereas the greenfield site, being far from pipelines or biogas sources, would require prohibitively expensive biogas transport infrastructure. Overall, the research showed that repurposing waste or low-quality coal with renewable biogas and CO 2 capture systems could provide a viable approach for reducing carbon emissions in power production, if biogas resources are easily accessible and available in sufficient quantities.

01 COAL, LIGNITE, AND PEAT↗