Coronado Generating Station Repowering Evaluation - Siting Evaluation
The purpose of this initial siting evaluation is to consider the suitability of the Salt River Project (SRP) owned land at/near Coronado Generating Station (CGS) for a nuclear generating station (including advanced light water reactors, light water small modular reactors, and non-light-water designs1) and to assess if there are any exclusionary or avoidance factors associated with coal to nuclear repowering at CGS. This initial siting evaluation considers several characteristics (e.g., environmental conditions, seismic concerns, site footprint, water use, etc.) and highlights favorable/preferred characteristics as well as potential risks to feasibility. The results are intended to inform SRP on the strengths and weaknesses associated with the CGS site and inform the selection of candidate nuclear technologies for the CGS site that align with SRP’s mission and business objectives. This report relies on industry-recognized siting guidance, including Electric Power Research Institute’s (EPRI’s) Siting Guide (Reference 1) 2 and Nuclear Regulatory Commission’s (NRC’s) Regulatory Guide (RG) 4.7 (Reference 3), as well as nuclear domain expertise within the Gateway for Accelerated Innovation in Nuclear (GAIN), MPR Associates, Inc. (MPR), and the Idaho National Laboratory (INL).