Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Analyses”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation. Volume 5: Auxiliary shuttle risk analyses

Volume 5 is Appendix C, Auxiliary Shuttle Risk Analyses, and contains the following reports: Probabilistic Risk Assessment of Space Shuttle Phase 1 - Space Shuttle Catastrophic Failure Frequency Final Report; Risk Analysis Applied to the Space Shuttle Main Engine - Demonstration Project for the Main Combustion Chamber Risk Assessment; An Investigation of the Risk Implications of Space Shuttle Solid Rocket Booster Chamber Pressure Excursions; Safety of the Thermal Protection System of the Space Shuttle Orbiter - Quantitative Analysis and Organizational Factors; Space Shuttle Main Propulsion Pressurization System Probabilistic Risk Assessment, Final Report; and Space Shuttle Probabilistic Risk Assessment Proof-of-Concept Study - Auxiliary Power Unit and Hydraulic Power Unit Analysis Report.

Fragola, Joseph R.↗

A combined approach to investigate the toxicity of an industrial landfill's leachate: Chemical analyses, risk assessment and in vitro assays

Solid wastes constitute an important and emerging problem. Landfills are still one of the most common ways to manage waste disposal. The risk assessment of pollutants from landfills is becoming a major environmental issue in Europe, due to the large number of sites and to the importance of groundwater protection. Furthermore, there is lack of knowledge for the environmental, ecotoxicological and toxicological characteristics of most contaminants contained into landfill leacheates. Understanding leachate composition and creating an integrated strategy for risk assessment are currently needed to correctly face the landfill issues and to make projections on the long-term impacts of a landfill, with particular attention to the estimation of possible adverse effects on human health and ecosystem. In the present study, we propose an integrated strategy to evaluate the toxicity of the leachate using chemical analyses, risk assessment guidelines and in vitro assays using the hepatoma HepG2 cells as a model. The approach was applied on a real case study: an industrial waste landfill in northern Italy for which data on the presence of leachate contaminants are available from the last 11 years. Results from our ecological risk models suggest important toxic effects on freshwater fish and small rodents, mainly due to ammonia and inorganic constituents. Our results from in vitro data show an inhibition of cell proliferation by leachate at low doses and cytotoxic effect at high doses after 48 h of exposure. - Research highlights: {yields} We study the toxicity of leachate from a non-hazardous industrial waste landfill. {yields} We perform chemical analyses, risk assessments and in vitro assays on HepG2 cells. {yields} Risk models suggest toxic effects due to ammonia and inorganic constituents. {yields} In vitro assays show that leachate inhibits cell proliferation at low doses. {yields} Leachate can induce cytotoxic effects on HepG2 cells at high doses.

60 APPLIED LIFE SCIENCES↗

Recent evolution of risk analyses in atomic bomb survivor studies: new methods and applications

Abstract Several decades ago a dramatic leap forward occurred in the development and application of statistical methods for modeling radiation risk at the Radiation Effects Research Foundation (RERF). Poisson regression analysis for grouped person-year cohort data and the linear excess relative risk model were introduced, and subsequently a devoted software system, Epicure® (https://www.hirosoft.com), was developed by researchers at RERF and at the U.S. National Cancer Institute. Numerous advancements in understanding radiation effects on humans were made possible with these methods, which are still the state-of-the-art for risk assessment at RERF and have remained part of the standard toolbox for radiation—and other environmental—epidemiological studies worldwide. Nevertheless, as our understanding of radiation risk has increased, so have the breadth and depth of questions that require answers based on emerging data that are not amenable to these conventional methods. This overview briefly recounts the conventional methods and then describes our recent diversification into the use or development of new statistical approaches to meet the challenges of burgeoning biological data and emerging mechanistic information. We briefly discuss the development and application of new methods, current and planned, that are part of the RERF Statistics Department’s role in supporting institution-wide research, especially in our collaborations involving the Life Span Study, Adult Health Study, and First-generation Offspring Clinical Study. Some approaches to modeling and assessing radiation risk with newer methods mentioned herein have already been published, while some are still in development or are only beginning at the proposal stage.

Oncology↗

Risk analyses for the solar particle events of August through December 1989

The solar particle events of August through December 1989, among the largest ever recorded, are analyzed to assess the potential hazards to humans on interplanetary missions from events of these types. Using the coupled neutron-proton space radiation transport computer code BRYNTRN, risk estimates for the effects of exposures to the skin, ocular lens, and bone marrow are made for nominal thicknesses of the spacecraft aluminum shielding. Risk assessment in terms of absorbed dose is made for each event. Also presented are estimates of organ absorbed dose and dose equivalent for pairs of events which occurred within 30-day periods, and for the cumulative August through December 1989 period.

Townsend, Lawrence W.↗

Quantitative approaches for including equity in risk and resilience infrastructure planning analyses

Risk and resilience assessments for critical infrastructure focus on myriad objectives, from natural hazard evaluations to optimizing investments. Although research has started to characterize externalities associated with current or possible future states, incorporation of equity priorities at project inception is increasingly being recognized as critical for planning related activities. However, there is no standard methodology that guides development of equity-informed quantitative approaches for infrastructure planning activities. Here, to address this gap, we introduce a logic model that can be tailored to capture nuances about specific geographies and community priorities, effectively incorporating them into different mathematical approaches for quantitative risk assessments. Specifically, the logic model uses a graded, iterative approach to clarify specific equity objectives as well as inform the development of equations being used to support analysis. We demonstrate the utility of this framework using case studies spanning aviation fuel, produced water, and microgrid electricity infrastructures. For each case study, the use of the logic model helps clarify the ways that local priorities and infrastructure needs are used to drive the types of data and quantitative methodologies used in the respective analyses. The explicit consideration of methodological limitations (e.g., data mismatches) and stakeholder engagements serves to increase the transparency of the associated findings as well as effectively integrate community nuances (e.g., ownership of assets) into infrastructure assessments. Such integration will become increasingly important to ensure that planning activities (which occur throughout the lifecycle of the infrastructure projects) lead to long-lasting solutions to meet both energy and sustainable development goals for communities.

community-based↗

A Historical Overview of International Space Station Extravehicular Activity Meteoroid and Orbital Debris Risk

Nearly 300 spacewalks have been conducted over the last 25 years to help build and maintain the International Space Station (ISS). During the nearly 2,000 hours of extra-vehicular activity (EVA), crew members wear extra-vehicular mobility unit (EMU) “spacesuits” to mitigate hazards of the space environment including impacts from meteoroid and orbital debris (MMOD) particles. NASA includes detailed EMU MMOD risk analyses as part of the ISS EVA review and approval process. This paper provides a general historical overview of the ISS EVA MMOD risks and the associated risk assessment process. The NASA Johnson Space Center (JSC) Hypervelocity Impact Technology (HVIT) Team produces the ISS EVA MMOD risk analyses using the Bumper3 MMOD risk analysis code in conjunction with detailed information about the EVA including crew-member EVA work sites, crew translation paths, suit orientation, and duration. Detailed physical models of the EMU spacesuits and the ISS are included and tailored for each EVA analysis. Two types of MMOD risk are included: (1) Penetration, and (2) Catastrophic. Penetration risk is for any size leak in the EMU suit. Catastrophic risk is a subset of Penetration Risk and only includes penetrations that cause a 4mm diameter hole (or larger) in the inner “bladder” layer of the EMU suit. This size hole will exceed the ability of the EMU suit to compensate. The MMOD risk analyses also utilize the latest orbital debris environment and meteoroid environment models including additional transient factors to account for recent satellite break-ups and annual meteor storms. These additional factors and the associated increase in EVA MMOD risk are considered when scheduling an EVA to reduce EMU MMOD risk.

Dana M. Lear↗

A Review of International Space Station Extravehicular Activity Micrometeoroid and Orbital Debris Risk

Nearly 300 spacewalks have been conducted over the last 25 years to support the construction and maintenance of the International Space Station (ISS). During the nearly 2,000 hours of extra-vehicular activity (EVA), crew wore extra-vehicular mobility unit (EMU) “spacesuits” to help mitigate hazards of the space environment including impacts from micrometeoroid and orbital debris (MMOD) particles. The National Aeronautics and Space Administration (NASA) conducts detailed EMU MMOD risk analyses as part of the ISS EVA review and approval process. This paper provides a general historical overview of the ISS EVA MMOD risks and the associated risk assessment process. The NASA Johnson Space Center (JSC) Hypervelocity Impact Technology (HVIT) Team produces the ISS EVA MMOD risk analyses using the Bumper MMOD risk analysis code in conjunction with detailed information about the EVA including crew member EVA work sites, crew translation paths, suit orientation, and durations. Detailed physical models of the EMU spacesuit and the ISS are included and tailored for each EVA analysis. Two types of MMOD risk are included: (1) Penetration, and (2) Catastrophic. Penetration risk is for any size leak in the EMU suit. Catastrophic risk is a subset of Penetration Risk and only includes penetrations that cause a 4mm diameter hole (or larger) in the pressure-maintaining “bladder” layer of the EMU suit. This size hole will exceed the ability of the EMU suit to compensate. The MMOD risk analyses also utilize the latest orbital debris environment and meteoroid environment models including additional transient factors to account for recent satellite break-ups and annual meteor storms. These additional factors and the associated increase in EVA MMOD risk are considered when scheduling EVAs to reduce EMU MMOD risk.

Dana M. Lear↗

A Review of International Space Station Extravehicular Activity Micrometeoroid and Orbital Debris Risk

Nearly 300 spacewalks have been conducted over the last 25 years to support the construction and maintenance of the International Space Station (ISS). During the nearly 2,000 hours of extra-vehicular activity (EVA), crew wore extra-vehicular mobility unit (EMU) “spacesuits” to help mitigate hazards of the space environment including impacts from micrometeoroid and orbital debris (MMOD) particles. The National Aeronautics and Space Administration (NASA) conducts detailed EMU MMOD risk analyses as part of the ISS EVA review and approval process. This paper provides a general historical overview of the ISS EVA MMOD risks and the associated risk assessment process. The NASA Johnson Space Center (JSC) Hypervelocity Impact Technology (HVIT) Team produces the ISS EVA MMOD risk analyses using the Bumper MMOD risk analysis code in conjunction with detailed information about the EVA including crew member EVA work sites, crew translation paths, suit orientation, and durations. Detailed physical models of the EMU spacesuit and the ISS are included and tailored for each EVA analysis. Two types of MMOD risk are included: (1) Penetration, and (2) Catastrophic. Penetration risk is for any size leak in the EMU suit. Catastrophic risk is a subset of Penetration Risk and only includes penetrations that cause a 4mm diameter hole (or larger) in the pressure-maintaining “bladder” layer of the EMU suit. This size hole will exceed the ability of the EMU suit to compensate. The MMOD risk analyses also utilize the latest orbital debris environment and meteoroid environment models including additional transient factors to account for recent satellite break-ups and annual meteor storms. These additional factors and the associated increase in EVA MMOD risk are considered when scheduling EVAs to reduce EMU MMOD risk.

Dana M. Lear↗

Studies for the requirements of automatic and remotely controlled shutoff valves on hazardous liquids and natural gas pipelines with respect to public and environmental safety

This study assesses the effectiveness of block valve closure swiftness in mitigating the consequences of natural gas and hazardous liquid pipeline releases on public and environmental safety. It also evaluates the technical, operational, and economic feasibility and potential cost benefits of installing automatic shutoff valves (ASVs) and remote control valves (RCVs) in newly constructed and fully replaced transmission lines. Risk analyses of hypothetical pipeline release scenarios are used as the basis for assessing: (1) fire damage to buildings and property in Class 1, Class 2, Class 3, and Class 4 high consequence areas (HCAs) caused by natural gas pipeline releases and subsequent ignition of the released natural gas; (2) fire damage to buildings and property in HCAs designated as high population areas and other populated areas caused by hazardous liquid pipeline releases and subsequent ignition of the released propane; and (3) socioeconomic and environmental damage in HCAs caused by hazardous liquid pipeline releases of crude oil. These risk analyses use engineering principles and fire science practices to characterize thermal radiation effects on buildings and humans and to quantify the total damage cost of socioeconomic and environmental impacts. The risk analysis approach used for natural gas pipelines is consistent with risk assessment standards developed by industry and incorporated into Federal pipeline safety regulations. Feasibility evaluations for the hypothetical pipeline release scenarios considered in this study show that installation of ASVs and RCVs in newly constructed and fully replaced natural gas and hazardous liquid pipelines is technically, operationally, and economically feasible with a positive cost benefit. However, these results may not apply to all newly constructed and fully replaced pipelines because site-specific parameters that influence risk analyses and feasibility evaluations often vary significantly from one pipeline segment to another and may not be consistent with those considered in this study. Consequently, the technical, operational, and economic feasibility and potential cost benefits of installing ASVs and RCVs in newly constructed or fully replaced pipelines need to be evaluated on a case-by-case basis. In theory, installing ASVs and RCVs in pipelines can be an effective strategy for mitigating potential consequences of unintended releases because decreasing the total volume of the release reduces overall impacts on the public and to the environment. However, block valve closure has no effect on preventing pipeline failure or stopping the product that remains inside the isolated pipeline segments from escaping into the environment. The benefits in terms of cost avoidance attributed to block valve closure swiftness increase as the time required to isolate the damaged transmission pipeline segment decreases. Block valve closure swiftness is most effective in mitigating damage resulting from a pipeline release and subsequent fire when the damaged pipeline segment is isolated and the thermal radiation produced by the fire declines in time so that emergency responders can safely begin fire fighting activities immediately upon arrival at the scene. Similarly, the avoided cost of socioeconomic and environmental damage for hazardous liquid pipeline releases without ignition increase as time required to isolate the damaged pipeline segment decreases.

03 NATURAL GAS↗

Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's regulatory and demonstration testing of MAGNOX fuel flasks in the United Kingdom (the CEGB 'Operation Smash Hit' tests), and the 1980's regulatory drop and fire tests conducted on the TRUPACT II containers used for transuranic waste shipments to the Waste Isolation Pilot Plant in New Mexico. The primary focus of the paper is a detailed evaluation of the cask testing programs proposed by the NRC in its decision implementing staff recommendations based on the Package Performance Study, and by the State of Nevada recommendations based on previous work by Audin, Resnikoff, Dilger, Halstead, and Greiner. The NRC approach is based on demonstration impact testing (locomotive strike) of a large rail cask, either the TAD cask proposed by DOE for spent fuel shipments to Yucca Mountain, or a similar currently licensed dual-purpose cask. The NRC program might also be expanded to include fire testing of a legal-weight truck cask. The Nevada approach calls for a minimum of two tests: regulatory testing (impact, fire, puncture, immersion) of a rail cask, and extra-regulatory fire testing of a legal-weight truck cask, based on the cask performance modeling work by Greiner. The paper concludes with a discussion of key procedural elements - test costs and funding sources, development of testing protocols, selection of testing facilities, and test peer review - and various methods of communicating the test results to a broad range of stakeholder audiences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and Prioritization of Analysis Cases for Marine and Hydrokinetic Energy Risk Screening

In this report we describe the development of the Environmental Risk Evaluation System (ERES), a risk-informed analytical process for estimating the environmental risks associated with the construction and operation of marine and hydrokinetic energy generation projects. The development process consists of two main phases of analysis. In the first phase, preliminary risk analyses will take the form of screening studies in which key environmental impacts and the uncertainties that create risk are identified, leading to a better-focused characterization of the relevant environmental effects. Existence of critical data gaps will suggest areas in which specific modeling and/or data collection activities should take place. In the second phase, more detailed quantitative risk analyses will be conducted, with residual uncertainties providing the basis for recommending risk mitigation and monitoring activities. We also describe the process used for selecting three cases for fiscal year 2010 risk screening analysis using the ERES. A case is defined as a specific technology deployed in a particular location involving certain environmental receptors specific to that location. The three cases selected satisfy a number of desirable criteria: 1) they correspond to real projects whose deployment is likely to take place in the foreseeable future; 2) the technology developers are willing to share technology and project-related data; 3) the projects represent a diversity of technology-site-receptor characteristics; 4) the projects are of national interest, and 5) environmental effects data may be available for the projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Computational Analyses in Support of Sub-scale Diffuser Testing for the A-3 Facility: Unsteady Analyses and Risk Assessment - Part 2

Simulation technology can play an important role in rocket engine test facility design and development by assessing risks, providing analysis of dynamic pressure and thermal loads, identifying failure modes and predicting anomalous behavior of critical systems. This is especially true for facilities such as the proposed A-3 facility at NASA SSC because of a challenging operating envelope linked to variable throttle conditions at relatively low chamber pressures. Design Support of the feasibility of operating conditions and procedures is critical in such cases due to the possibility of startup/shutdown transients, moving shock structures, unsteady shock-boundary layer interactions and engine and diffuser unstart modes that can result in catastrophic failure. Analyses of such systems is difficult due to resolution requirements needed to accurately capture moving shock structures, shock-boundary layer interactions, two-phase flow regimes and engine unstart modes. In a companion paper, we will demonstrate with the use of CFD, steady analyses advanced capability to evaluate supersonic diffuser and steam ejector performance in the sub-scale A-3 facility. In this paper we will address transient issues with the operation of the facility especially at startup and shutdown, and assess risks related to afterburning due to the interaction of a fuel rich plume with oxygen that is a by-product of the steam ejectors. The primary areas that will be addressed in this paper are: (1) analyses of unstart modes due to flow transients especially during startup/ignition, (2) engine safety during the shutdown process (3) interaction of steam ejectors with the primary plume i.e. flow transients as well as probability of afterburning. In this abstract we discuss unsteady analyses of the engine shutdown process. However, the final paper will include analyses of a staged startup, drawdown of the engine test cell pressure, and risk assessment of potential afterburning in the facility. Unsteady simulations have been carried out to study the engine shutdown process in the facility and understand the physics behind the interactions between the steam ejectors, the test cell and the supersonic diffuser. As a first approximation, to understand the dominant unsteady mechanisms in the engine test cell and the supersonic diffuser, the turning duct in the facility was removed. As the engine loses power a rarefaction wave travels downstream that disrupts the shock cell structure in the supersonic diffuser. Flow from the test cell is seen to expand into the supersonic diffuser section and re-pressurizes the area around the nozzle along with a upstream traveling compression wave that emanates from near the first stage ejectors. Flow from the first stage ejector expands to the center of the duct and a new shock train is formed between the first and second stage ejectors. Both stage ejectors keep the facility pressurized and prevent any large amplitude pressure fluctuations from affecting the engine nozzle. The resultant pressure loads the nozzle experiences in the shutdown process are small.

Ahuja, Vineet↗

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.↗

Deep Cyber-Physical Situational Awareness for Energy Systems: A Secure Foundation for Next-Generation Energy Management

This document provides the final report for the CYPRES project. The purpose is (1) to highlight and summarize its major accomplishments and (2) to provide guidance on how its outcomes have informed and can inform important additional research and technology transfer. The goal of CYPRES was the research, development, and demonstration of a security-oriented next generation cyber-physical EMS for electric power systems that detects malicious and abnormal events through the fusion of cyber and physical data. To achieve this, the CYPRES project team researched, developed, and built a prototype of the solution, referred to as the CYPRES EMS. The CYPRES EMS is a proof-of-concept cyber-physical platform that demonstrates the management of the energy system, communications, security, and cyber-physical grid modeling and analytics. As part of the capabilities of the CYPRES EMS, the team designed and developed a suite of power system applications for monitoring, risk analyses, detection, and control that are inherently cyberaware. At its core, the project aimed to research, develop, and demonstrate a security-oriented next-generation cyber-physical Energy Management System (EMS) capable of detecting malicious and abnormal events through the innovative fusion of cyber and physical data. This approach represents a fundamental shift from traditional EMS, reimagining how critical infrastructure can be protected through unified cyber-aware and physics-aware secure data flow pipelines. The project’s cornerstone deliverable, the CYPRES EMS, serves as a proof-of-concept cyber-physical platform that revolutionizes the management of energy systems, communications, security, and cyber-physical grid modeling and analytics. This prototype implements a comprehensive suite of power system applications for monitoring, risk analyses, detection, and control, all designed with inherent cyber awareness. The system’s architecture extends from end-devices in the field through to control center applications, establishing a secure and resilient control framework that addresses the challenges posed by diverse devices of unknown trustworthiness connecting to modern power systems. Through this innovative approach to deep cyber-physical situational awareness, the CYPRES project not only advances the state-of-the-art in energy infrastructure protection but also establishes a new paradigm for how EMS can be designed, deployed, and operated in an increasingly complex threat landscape. The findings and developments from this project provide crucial insights for stakeholders across the energy sector, offering a blueprint for enhancing the reliability and resilience of our nation’s critical energy infrastructure in the face of evolving cyber threats.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analyses of risks associated with radiation exposure from past major solar particle events

Radiation exposures and cancer induction/mortality risks were investigated for several major solar particle events (SPE's). The SPE's included are: February 1956, November 1960, August 1972, October 1989, and the September, August, and October 1989 events combined. The three 1989 events were treated as one since all three could affect a single lunar or Mars mission. A baryon transport code was used to propagate particles through aluminum and tissue shield materials. A free space environment was utilized for all calculations. Results show the 30-day blood forming organs (BFO) limit of 25 rem was surpassed by all five events using 10 g/sq cm of shielding. The BFO limit is based on a depth dose of 5 cm of tissue, while a more detailed shield distribution of the BFO's was utilized. A comparison between the 5 cm depth dose and the dose found using the BFO shield distribution shows that the 5 cm depth value slightly higher than the BFO dose. The annual limit of 50 rem was exceeded by the August 1972, October 1989, and the three combined 1989 events with 5 g/sq cm of shielding. Cancer mortality risks ranged from 1.5 to 17 percent at 1 g/sq cm and 0.5 to 1.1 percent behind 10 g/sq cm of shielding for five events. These ranges correspond to those for a 45 year old male. It is shown that secondary particles comprise about 1/3 of the total risk at 10 g/sq cm of shielding. Utilizing a computerized Space Shuttle shielding model to represent a typical spacecraft configuration in free space at the August 1972 SPE, average crew doses exceeded the BFO dose limit.

Weyland, Mark D.↗