Risk-based analysis and decision making in multi-disciplinary environments

A risk-based decision-making process conceived of and developed at JPL and NASA, has been used to help plan and guide novel technology applications for use on spacecraft. These applications exemplify key challenges inherent in multi-disciplinary design of novel technologies deployed in mission-critical settings. 1) Cross-disciplinary concerns are numerous (e.g., spacecraft involve navigation, propulsion, telecommunications). These concems are cross-coupled and interact in multiple ways (e.g., electromagnetic interference, heat transfer). 2) Time and budget pressures constrain development, operational resources constrain the resulting system (e.g., mass, volume, power). 3) Spacecraft are critical systems that must operate correctly the first time in only partially understood environments, with no chance for repair. 4) Past experience provides only a partial guide: New mission concepts are enhanced and enabled by new technologies, for which past experience is lacking. The decision-making process rests on quantitative assessments of the relationships between three classes of information - objectives (the things the system is to accomplish and constraints on its operation and development), risks (whose occurrence detracts from objectives), and mitigations (options for reducing the likelihood and or severity of risks). The process successfully guides experts to pool their knowledge, using custom-built software to support information gathering and decision-making.

technology↗

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.↗

Advanced Human-System Interface Risk Analysis Based on Redundancy-guided Systems-theoretic Hazard Analysis and Human Reliability Analysis

Human-system interfaces (HSIs) play an important role in enabling operators to communicate with the nuclear power plant (NPP) side. Getting the information required to understand a NPP’s current status or perform necessary actions for responding to a given operational context are representative operator tasks performed using HSIs. To date, HSIs have been mainly evaluated in the context of human reliability analysis (HRA). However, the current HSI evaluation that occurs during HRA may be challengeable on two fronts: (1) reflecting the unique characteristics of HSI systems and (2) considering situations in which HSIs are poorly operated due to software/hardware malfunctions. Accordingly, this study proposes an approach for specifically evaluating HSIs for digital instrumentation and controls (DI&C) systems, using Redundancy-guided Systems-theoretic Hazard Analysis (RESHA) and HRA. RESHA is a method for analyzing DI&C systems with redundancy features. In this study, we investigate how HSIs are evaluated in existing HRA methods, and what challenges exist in the current approaches. To better evaluate HSIs for DI&C systems, this study modifies the existing HSI evaluation process by additionally modeling the HSI back- and front- ends. In this paper, a HSI fault tree for the APR1400 DI&C system is introduced through a piping and instrumentation diagram. It then touches upon what aspects of the suggested method must be further researched.

99 GENERAL AND MISCELLANEOUS↗

Risk-Based Dynamic Contingency Analysis Applied to Puerto Rico Electric Infrastructure

The U.S. Department of Energy’s (DOE) Office of Electricity and Office of Energy Efficiency & Renewable Energy have funded DOE National Laboratories to perform modeling, analysis, and high-level design of resilience-enhancement options for the power grid of the Commonwealth of Puerto Rico. The Pacific Northwest National Laboratory (PNNL) is one of the national laboratories contributing to the DOE effort. Under this funding, PNNL completed Phase I of their analysis in 2018, which identified high-priority transmission enhancements derived from detailed dynamic cascading analysis of severe contingencies, including a hurricane scenario example. This report describes additional analysis completed under Phase II, which was performed over 2019. The PNNL team applied decades of experience making complex power systems more resilient, reliable, secure, flexible, affordable and sustainable, with partners in government and industry. In this report, PNNL presents the Phase II analysis, in which a risk-based dynamic contingency analysis approach to evaluate impact of several hurricane scenarios was developed. This approach was used to identify high-priority enhancements and test resilience mitigation actions, including the evaluation of high-solar scenarios developed as a result of the 2019 Puerto Rico Integrated Resource Plan (IRP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Requirements for Application of Risk-Based Dynamic Contingency Analysis to Evaluate Hurricane Impact to Electrical Infrastructure in Puerto Rico

This paper presents a risk-based dynamic contingency analysis framework that was used to evaluate the hurricane impact to electrical infrastructure in Puerto Rico. PNNL developed a scalable risk-based framework for identifying high-voltage transmission resilience improvements by classifying and prioritizing high-risk power grid contingencies (system failures) under hurricane impact. The risk-based framework is founded on grid outage definitions with their associated probabilities of occurrence from hurricane events, in combination with an impact assessment derived from detailed dynamic cascading failure analysis. This paper focuses on a discussion around data requirements for transmission resilience planning for hurricane events, derived from the development of the risk-based framework and its application to Puerto Rico. This paper launches an important first step in encouraging the engineering community and power system industry to move towards establishing resilience planning as a routine practice. Since actual results for Puerto Rico contain sensitive information, sample simulation results will be used to illustrate the data requirements and risk-based dynamic cascading framework on the Puerto Rico power grid, as well as demonstrate the potential for such a simulation framework. The paper includes a discussion on the lessons learned, importance and need for improved datasets that are not usually considered in traditional power system planning. The paper will also elaborate on how the scalable simulation framework and datasets might be expanded to larger footprints and leveraged for modelling other types of natural disasters.

DCAT, Puerto Rico, hurricane, Power System Stabili↗

Hydrogen Fuel Cell Vehicles in Tunnels

There are numerous vehicles which utilize alternative fuels, or fuels that differ from typical hydrocarbons such as gasoline and diesel, throughout the world. Alternative vehicles include those running on the combustion of natural gas and propane as well as electrical drive vehicles utilizing batteries or hydrogen as energy storage. Because the number of alternative fuels vehicles is expected to increase significantly, it is important to analyze the hazards and risks involved with these new technologies with respect to the regulations related to specific transport infrastructure, such as bridges and tunnels. This report focuses on hazards presented by hydrogen fuel cell electric vehicles that are different from traditional fuels. There are numerous scientific research and analysis publications on hydrogen hazards in tunnel scenarios; however, compiling the data to make conclusions can be a difficult process for tunnel owners and authorities having jurisdiction over tunnels. This report provides a summary of the available literature characterizing hazards presented by hydrogen fuel cell electric vehicles, including light-duty, medium and heavy-duty, as well as buses. Research characterizing both worst-case and credible scenarios, as well as risk-based analysis, is summarized. Gaps in the research are identified to guide future research efforts to provide a complete analysis of the hazards and recommendations for the safe use of hydrogen fuel cell electric vehicles in tunnels.

33 ADVANCED PROPULSION SYSTEMS↗

Alternate Fuel Vehicles in Tunnels

Many types of vehicles using fuels that differ from typical hydrocarbons such as gasoline and diesel are in use throughout the world. These include vehicles running on the combustion of natural gas and propane as well as electrical drive vehicles utilizing batteries or hydrogen as energy storage. These alternative fuels pose hazards that are different from traditional fuels and the safety of these vehicles are being questioned in areas such as tunnels and other enclosed spaces. Much scientific research and analysis has been conducted on tunnel and garage hazard scenarios; however, the data and conclusions might not seem to be immediately applicable to highway tunnel owners and authorities having jurisdiction over tunnels. This report provides a comprehensive, concise summary of the literature available characterizing the various hazards presented by all alternative fuel vehicles, including light-duty, medium- and heavy-duty, as well as buses. Research characterizing both worst-case and more plausible scenarios and risk-based analysis is also summarized Gaps in the research are identified in order to guide future research efforts to provide a complete analysis of the hazards and recommendations for the use of alternative fuel vehicles in tunnels.

33 ADVANCED PROPULSION SYSTEMS↗

SMART: A Propositional Logic-Based Trade Analysis and Risk Assessment Tool for a Complex Mission

This paper introduces a new trade analysis software called the Space Mission Architecture and Risk Analysis Tool (SMART). This tool supports a high-level system trade study on a complex mission, such as a potential Mars Sample Return (MSR) mission, in an intuitive and quantitative manner. In a complex mission, a common approach to increase the probability of success is to have redundancy and prepare backups. Quantitatively evaluating the utility of adding redundancy to a system is important but not straightforward, particularly when the failure of parallel subsystems are correlated.

Ono, Masahiro↗

Aircraft Conceptual Design and Risk Analysis Using Physics-Based Noise Prediction

An approach was developed which allows for design studies of commercial aircraft using physics-based noise analysis methods while retaining the ability to perform the rapid trade-off and risk analysis studies needed at the conceptual design stage. A prototype integrated analysis process was created for computing the total aircraft EPNL at the Federal Aviation Regulations Part 36 certification measurement locations using physics-based methods for fan rotor-stator interaction tones and jet mixing noise. The methodology was then used in combination with design of experiments to create response surface equations (RSEs) for the engine and aircraft performance metrics, geometric constraints and take-off and landing noise levels. In addition, Monte Carlo analysis was used to assess the expected variability of the metrics under the influence of uncertainty, and to determine how the variability is affected by the choice of engine cycle. Finally, the RSEs were used to conduct a series of proof-of-concept conceptual-level design studies demonstrating the utility of the approach. The study found that a key advantage to using physics-based analysis during conceptual design lies in the ability to assess the benefits of new technologies as a function of the design to which they are applied. The greatest difficulty in implementing physics-based analysis proved to be the generation of design geometry at a sufficient level of detail for high-fidelity analysis.

Olson, Erik D.↗

A Risk-Based Approach for Aerothermal/TPS Analysis and Testing

The current status of aerothermal and thermal protection system modeling for civilian entry missions is reviewed. For most such missions, the accuracy of our simulations is limited not by the tools and processes currently employed, but rather by reducible deficiencies in the underlying physical models. Improving the accuracy of and reducing the uncertainties in these models will enable a greater understanding of the system level impacts of a particular thermal protection system and of the system operation and risk over the operational life of the system. A strategic plan will be laid out by which key modeling deficiencies can be identified via mission-specific gap analysis. Once these gaps have been identified, the driving component uncertainties are determined via sensitivity analyses. A Monte-Carlo based methodology is presented for physics-based probabilistic uncertainty analysis of aerothermodynamics and thermal protection system material response modeling. These data are then used to advocate for and plan focused testing aimed at reducing key uncertainties. The results of these tests are used to validate or modify existing physical models. Concurrently, a testing methodology is outlined for thermal protection materials. The proposed approach is based on using the results of uncertainty/sensitivity analyses discussed above to tailor ground testing so as to best identify and quantify system performance and risk drivers. A key component of this testing is understanding the relationship between the test and flight environments. No existing ground test facility can simultaneously replicate all aspects of the flight environment, and therefore good models for traceability to flight are critical to ensure a low risk, high reliability thermal protection system design. Finally, the role of flight testing in the overall thermal protection system development strategy is discussed.

Wright, Michael J.↗

Simulation-Based Recovery Action Analysis Using the EMRALD Dynamic Risk Assessment Tool

Recovery human action is defined as the action that prevents deviant conditions from producing unwanted effects. Analyzing recovery actions has been a critical part in human reliability analysis (HRA). However, there are a couple of limitations to treating recovery actions using only the current HRA methods available. Representatively, the existing recovery analysis does not specifically consider recovery actions as they have occurred in actual nuclear power plants (NPPs). To handle the challenges in the existing recovery analyses, this study suggests a way to analyze recovery actions under a dynamic HRA method, the Procedure-based Risk Investigation MEthod-Human Reliability Analysis (PRIME-HRA) method. The PRIME-HRA method suggests a way on how to develop dynamic simulation models using dynamic risk assessment tools such as the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) [1] and the Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) [2]. EMRALD and HUNTER are the dynamic probabilistic risk assessment and HRA tools developed at Idaho National Laboratory. In this paper, differences on analyzing recovery actions in the Technique for Human Error-Rate Prediction (THERP), the Cause-Based Decision Tree (CBDT) and the Korean Standard HRA (K-HRA) and challenges of these approaches are introduced. How we have developed the PRIME-HRA is also introduced in this paper. Then, the proposed approach to analyzing recovery human actions in dynamic context is partially discussed with an example.

99 GENERAL AND MISCELLANEOUS↗

Nuclear Radiation Fields on the Mars Surface: Risk Analysis for Long-term Living Environment

Mars, our nearest planet outward from the sun, has been targeted for several decades as a prospective site for expanded human habitation. Background space radiation exposures on Mars are expected to be orders of magnitude higher than on Earth. Recent risk analysis procedures based on detailed dosimetric techniques applicable to sensitive human organs have been developed along with experimental data regarding cell mutation rates resulting from exposures to a broad range of particle types and energy spectra. In this context, simulated exposure and subsequent risk for humans in residence on Mars are examined. A conceptual habitat structure, CAD-modeled with duly considered inherent shielding properties, has been implemented. Body self-shielding is evaluated using NASA standard computerized male and female models. The background environment is taken to consist not only of exposure from incident cosmic ray ions and their secondaries, but also include the contribution from secondary neutron fields produced in the tenuous atmosphere and the underlying regolith.

Brooke M Anderson↗

The Evolution of the NASA Commercial Crew Program Mission Assurance Process

In 2010, the National Aeronautics and Space Administration (NASA) established the Commercial Crew Program (CCP) in order to provide human access to the International Space Station and low Earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine that the Commercial Provider's transportation system complies with programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted hazard reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100% of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (S&MA) model does not support the nature of the CCP. To that end, NASA S&MA is implementing a Risk Based Assurance process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications.

Mission Assurance↗

The NASA Commercial Crew Program (CCP) Mission Assurance Process

In 2010, NASA established the Commercial Crew Program in order to provide human access to the International Space Station and low earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine the commercial providers transportation system complies with Programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted Hazard Reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100 percent of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (SMA) model does not support the nature of the Commercial Crew Program. To that end, NASA SMA is implementing a Risk Based Assurance (RBA) process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications. This paper will describe the evolution of the CCP Mission Assurance process from the beginning of the Program to its current incarnation. Topics to be covered include a short history of the CCP; the development of the Programmatic mission assurance requirements; the current safety review process; a description of the RBA process and its products and ending with a description of the Shared Assurance Model.

Commercial Crew Program↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.