Search NASASearch

SEARCH · Search NASA

Results for “Risk-Informed Decision Making”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Evaluating Supply Prioritization Strategies for Risk-Informed Decision Making in an Arbitrary Gas Network

Supply disruptions and infrastructure failures in natural gas networks present critical challenges to energy reliability and risk-informed planning. This study evaluates two supply prioritization strategies, Maximum Delivery Prioritization (MDP) and Demand-Based Prioritization (DBP), within an arbitrary natural gas network under conditions of supply shortage. Model performance under both strategies is assessed in response to node and edge failure using demand satisfaction metrics, system-wide and localized dependency scores, and geographic information system (GIS)-based spatial analysis. Results show that DBP better preserves supply for high-demand nodes, while MDP offers broader coverage. The underlying network topology plays a critical role in shaping prioritization outcomes. Integrated GIS visualization enhances the interpretability of vulnerability assessments, revealing structurally critical components and localized vulnerabilities. The proposed framework supports scalable, data-driven decision-making for infrastructure planners and engineers, enabling improved disruption recovery and efficiency in constrained natural gas networks. These insights contribute to the development of more robust energy systems capable of withstanding stress and disruptions.

Peterson, Steven [ORNL] (ORCID:0000000287672998)

First-of-a-Kind Risk-Informed Digital Twin for Operational Decision Making

A digital twin (DT) is a digital model or a collection of models of a physical entity. DTs in the nuclear arena can be used from plant design through decommissioning. Decisions are typically a priori or made offline. Risk-informed decision making is identifying what can go wrong, its frequency, and the consequences of its failure. Ideally risk-informed decision making reflects the current state of the plant and provides a decision in real time. Traditionally, probabilistic risk assessments (PRAs) evaluate the failures of safety systems, the risk of core damage, and the offsite dose as the consequence. However, this DT evaluates the decisions on the control side rather than the protection side. It uses the same risk methods to probabilistically inform the decision-making process but in a different way. Rather than evaluating the risk of core damage, this DT evaluates the likelihood of avoiding a trip set point while maintaining plant safety. Performance-based assessments are identified via its probabilistic evaluation of operational alternatives based on system status. Because the purpose of the control system is to maintain system variables within prescribed operating ranges, upsets or challenges that can exceed a trip set point resulting in a plant transient and a challenge to plant mitigating systems based on actual plant conditions, are evaluated to safely maintain the plant within the operating ranges. The probabilistic portion of the model is autonomously and automatically adjusted, and the metric of interest (i.e. likelihood of avoiding a trip set point) is recalculated. The digital representation of the physical system (i.e. the DT) performs a deterministic performance–based assessment of the probabilistically identified alternatives identified to validate the probabilistic assessment. A decision-making algorithm selects the appropriate option based on the probabilistic and deterministic assessments and transmits a control signal to a component(s) to initiate a corrective action or informs an operator of its decision.

digital twin

Deep-learning-enhanced assessment of wellbore barrier effectiveness in geologic storage systems with intermediate aquifers

For geologic systems where carbon dioxide (CO 2 ) is injected underground, existing wells represent potential pathways for fluid migration. Here, this study introduces a novel deep learning model to quantify the likelihood and potential magnitude of fluid migration through wellbores at sites with intermediate aquifers or thief zones between the injection units and underground drinking water sources. Synthetic datasets, generated using reservoir simulations, captured a wide range of subsurface conditions, well attributes, operational parameters, and fluid migration scenarios. Among the regression models developed to predict brine and CO 2 leakage rates and CO 2 saturations along leaky wellbores, convolutional neural network (CNN) outperformed both Light Gradient Boosting Machine and deep neural network. Additionally, a CNN-based classification model was created to predict whether brine and CO 2 would leak along a wellbore, further improving performance over regression alone. The best models were integrated into the National Risk Assessment Partnership Open-source Integrated Assessment Model for rapid, stochastic assessment of storage system containment and leakage risks. A case study demonstrated the model’s ability to simulate fluid migration through existing wells with multiple intermediate aquifers. This computationally efficient wellbore model offers value in support of site performance evaluation and risk-informed decision making by stakeholders.

CO2 leakage

Developing a Process for Collaboration-Based Siting of a Federal Consolidated Interim Storage Facility in the United States: Learning from Communities Living with Legacy Waste

In June of 2023, the U.S. Department of Energy (DOE), Office of Nuclear Energy (NE) announced the selection of its Collaboration-Based Siting (CBS) Consortia, a group of 12 awardees, including the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) (led by Vanderbilt University) to assist DOE-NE with the development of its process for siting a federal consolidated interim storage facility (FCISF) for spent nuclear fuel (SNF) storage. At this time, DOE NE is not soliciting interested host communities, rather the CBS Consortia are tasked with in-depth engagement, mutual learning, and capacity building to provide DOE NE with feedback on the CBS process. CRESP’s objective is to engage communities in two regions (the Pacific Northwest and the Southeast) with sites currently storing defense- and research-related SNF to foster learning concerning the best and worst practices in community participation in risk-informed decision making. This includes learning from existing structures for public input in radioactive waste management decision making [e.g. citizen advisory boards (CABs)] and other local parties about how to build and sustain trust among the parties. CRESP has been working to engage stakeholders and Tribes surrounding two DOE sites historically differing in receptiveness to engaging with DOE and trusting in DOE to accomplish its missions. CRESP’s approach to date has consisted of (1) engaging voluntarily members and former members of the DOE Office of Environmental Management’s CABs to develop a mutual understanding of their perspectives, values, and experiences related to risk and participatory decision making; (2) engaging members of those communities that would likely be part of any radioactive waste management discussions and who may provide valuable feedback for the development of the CBS process; and in the longer term, (3) engaging communities to foster knowledge sharing on understanding and definitions of risk and how risk is factored into community decision making. Our emphasis is to identify opportunities for improving risk communication frameworks, strategies, and decision making. The selection of a future FCISF site is likely to result in the creation of a structure similar to a CAB composed of members of the local community. We anticipate that these insights can help DOE NE learn from existing participatory risk communication structures in place at sites storing defenseor research-related SNF to understand best practices for fostering enduring and participatory relationships with future CABs. Within this paper, we (1) describe CRESP’s overall approach to assisting DOE NE with maturing the CBS process; (2) present a summary of preliminary phase 1 project results, including the development of a body of knowledge (describing available resources to support community engagement, risk communica tion, and participatory decision making) and community ecosystem information (leveraging demographic, social, economic, and environmental attribute mapping and advanced sentiment analysis of social media data); and (3) based on these results, provide observations for future research opportunities to support the development of CBS processes for radioactive waste management facilities, generally.

collaboration-based siting

Bayesian Attack Model (BAM) User Story

This document presents a user story for the Bayesian Attack Model (BAM) tool designed to aggregate and analyze cyber-attack observables for operational technology (OT) systems. BAM aims to empower cybersecurity analysts by providing a streamlined interface for collecting observable data from various sources, enabling real-time analysis of potential adversary activity. By enhancing the response capabilities of security teams, BAM facilitates risk-informed decision-making and improves organizational security posture. This user story outlines the key functionalities, user interactions, and requirements necessary to successfully integrate BAM with other security information and event management (SIEM) technology and cybersecurity operations centers (CSOCs).

97 MATHEMATICS AND COMPUTING

Development of a Digital Twin for Hydrogen Dispersion and Safety Assessment in an Electrolyzer Based Hydrogen Production Facility

Digital twin models are virtual representations of physical systems that use real-time data to simulate and optimize performance. This study presents the development and initial implementation of a digital twin (DT) for the electrolyzer-based hydrogen production facility at NREL's Advanced Research on Integrated Energy Systems (ARIES), focused on enhancing safety and optimizing sensor placement through physics-based simulations and metadata integration. The DT incorporates detailed facility-specific information, including component layout, leak locations, and controlled release parameters, to model hydrogen dispersion under varying environmental conditions. Using steady-state computational fluid dynamics (CFD) simulations informed by real meteorological data, such as wind speed, direction, and vertical wind profiles, the DT enables visualization of hydrogen plume behavior and spatial concentration distributions. Comparative analysis between high and low wind speed scenarios illustrates the significant influence of wind dynamics on plume shape and extent, with horizontal momentum dominating dispersion at higher speeds, while buoyancy effects become more prominent under low wind conditions. These simulations generate a rich dataset embedded within the DT, allowing users to assess potential leak outcomes and identify optimal sensor locations based on concentration thresholds. The model supports scenario-based analysis to guide safety strategies and equipment deployment for open-area hydrogen infrastructure. The digital twin thus serves as a dynamic platform for virtual prototyping, providing predictive insight into hydrogen behavior and enhancing risk-informed decision-making. This initial phase establishes a validated foundation for future integration of transient, uncontrolled leak scenarios and real-time sensor feedback, positioning the DT as a critical tool for safety design, operational planning, and adaptive monitoring in hydrogen systems. Overall, the approach demonstrates the value of combining environmental data with digital simulations to inform safer and more efficient deployment of hydrogen technologies.

08 HYDROGEN

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Development of a Digital Twin for Hydrogen Dispersion and Safety Assessment in an Electrolyzer-Based Hydrogen Production Facility: Preprint

Digital twin models are virtual representations of physical systems that use real-time data to simulate and optimize performance. This study presents the development and initial implementation of a digital twin (DT) for the electrolyzer-based hydrogen production facility at the National Renewable Energy Laboratory (NREL)'s Advanced Research on Integrated Energy Systems (ARIES), focused on enhancing safety and optimizing sensor placement through physics-based simulations and metadata integration. The DT incorporates detailed facility-specific information, including component layout, leak locations, and controlled release parameters, to model hydrogen dispersion under varying environmental conditions. Using steady-state computational fluid dynamics (CFD) simulations informed by real meteorological data, such as wind speed, direction, and vertical wind profiles, the DT enables visualization of hydrogen plume behavior and spatial concentration distributions. Comparative analysis between high and low wind speed scenarios illustrates the significant influence of wind dynamics on plume shape and extent, with horizontal momentum dominating dispersion at higher speeds, while buoyancy effects become more prominent under low wind conditions. These simulations generate a rich dataset embedded within the DT, allowing users to assess potential leak outcomes and identify optimal sensor locations based on concentration thresholds. The model supports scenario-based analysis to guide safety strategies and equipment deployment for open-area hydrogen infrastructure. The digital twin thus serves as a dynamic platform for virtual prototyping, providing predictive insight into hydrogen behavior and enhancing risk-informed decision-making. This initial phase establishes a validated foundation for future integration of transient, uncontrolled leak scenarios and real-time sensor feedback, positioning the DT as a critical tool for safety design, operational planning, and adaptive monitoring in hydrogen systems. Overall, the approach demonstrates the value of combining environmental data with digital simulations to inform safer and more efficient deployment of hydrogen technologies.

08 HYDROGEN

Performing Numerical Analysis of Cybersecurity Options Using Dynamic Risk Analysis Tool EMRALD

Cyberattacks can have many different attack paths, durations, and goals. There are also many different mitigation options involving hardware, software, and/or humans. Considering a cyber threat should involve defense-in-depth methods and a quantitative or numerical evaluation of overall effectiveness against dynamic, time-dependent attacks to make cost and risk-informed decisions. Typical cyberattack modeling methods only provide a qualitative evaluation. The main areas of cybersecurity are confidentiality, integrity, and availability. For companies with cyber-physical systems such as advanced nuclear reactors, cyber-related safety is a requirement set by North American Electric Reliability and the U.S. Nuclear Regulatory Commission. They are also concerned about availability or reliability as a business case. As cyber threats are evolving to a business-for-hire structure, more attacks may focus on disrupting business success and reliability, causing financial and economic stability risk. Companies want to know business reliability and recovery from those threats, and that requires modeling physical behavior of the targets. Dynamic-state-based and Markov-based modeling provides a method for better cyber scenario modeling with different tools having issues such as state-base explosion. Dynamic modeling enables time and conditional features not found in other numerical evaluation methods. EMRALD (Event Modeling Risk Assessment using Lined Diagrams) is a dynamic risk analysis modeling and simulation tool and has features that reduce modeling issues. It has been used to model different time-dependent events including plant behavior and operator procedures. As a general modeling tool, EMRALD can also be used to model cyberattack scenarios with varying mitigation options and quantify effectiveness, producing numerical data for risk-informed decisions. This paper uses EMRALD to demonstrate that dynamic numerical risk analysis can be used for cyber threat modeling to provide insights for design decision-making and optimize defense strategies. Keywords: cyber modeling; cyber-physical systems; numerical cyber modeling

97 - MATHEMATICS AND COMPUTING

PSA 2025 DPRA for Cyber Optimization

Cyberattacks can have many different attack paths, durations, and goals. There are also many different mitigation options involving hardware, software, and/or humans. Evaluating defense options should include quantitative evaluation of overall effectiveness to make cost and risk-informed decisions. Typical cyberattack modeling methods only provide a qualitative evaluation and have difficulty with time dependent scenarios. The main areas of cybersecurity are confidentiality, integrity, and availability. For companies with cyber-physical systems such as advanced nuclear reactors, cyber-related integrity is a requirement set by the U.S. Nuclear Regulatory Commission. But companies are also concerned about availability or reliability as a business case. As cyber threats are evolving to a business-for-hire structure, more attacks focus on disrupting business success and reliability, causing financial and economic stability risk. Companies want reliability analysis while optimizing cost, which requires more than safety modeling methods. Dynamic-state-based and Markov-based modeling provides a method for better cyber scenario modeling with timing and conditional features not found in other numerical evaluation methods. EMRALD (Event Modeling Risk Assessment using Lined Diagrams) is a dynamic risk analysis modeling and simulation tool and has features that reduce modeling issues such as state-base explosion found in Markov-based tools. It has been used to model different time-dependent events including plant behavior and operator procedures. As a general modeling tool, EMRALD can also be used to model cyberattack scenarios with varying mitigation options and quantify effectiveness, producing numerical data for risk-informed decisions. This paper uses EMRALD to demonstrate that dynamic risk analysis can be used for cyber threat modeling to provide insights for design decision-making and optimize defense strategies.

97 - MATHEMATICS AND COMPUTING

INTEGRATION OF DATA ANALYTICS WITH SYSTEM HEALTH PROGRAMS

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry developed and regulatory programs. However, these programs have proven to be labor intensive and expensive. There is an opportunity to significantly enhance the collection, analysis, and use of this information to provide more cost-effective plant operation. Additionally, there is an acute industry need to leverage advanced technology to reduce costs and improve operational effectiveness. The goal of this paper is to provide effective and efficient analytical methods and tools to support risk-informed decisions for the equipment reliability and asset management programs at nuclear power plants. This is accomplished by creating a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). Here we are supporting typical system engineer decisions regarding maintenance activity scheduling and component ageing management. This is performed in a risk-informed context where herein the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow. A challenge is that the structure of this workflow strongly depends on the decision that needs to be made, the type of data available, and the constraints that need to be considered. Current methods are designed to provide specific answers to specific problems; however, these methods might prove to be inadequate even when problem settings slightly change (e.g., different types of requirements, additional dependencies between system reliability and economics). We tackled this challenge by designing framework in a flexible and modular fashion such that the user can assemble and customize his/her own workflow that integrates SSC economic lifecycle models (e.g., maintenance and replacement costs), system reliability models, and optimization methods.

97 - MATHEMATICS AND COMPUTING

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING

Integrating Intelligent Hydro-informatics into an effective Early Warning System for risk-informed urban flood management

The urban drainage system constantly facing flooding issues in coastal and urban areas. Robust and accurate urban flood management, particularly considering fast-moving compound floods, is crucial to minimize the impact of flood disasters in coastal cities. Till now, Ho Chi Minh City (HCMC) lacks an effective means of urban flood management because of flood risk communication among residents. Existing flood risk communication tools rely on post-disaster flood model outcomes and data. Therefore, this research proposes a real-time Early Urban Flooding Warning System (EUFWS) integrated with a user-friendly web and app interface. The backbone of this system consists of flood models developed using machine learning (ML) algorithms, combined with big data and Web-GIS visualization, with ML serving as the core for constructing the EUFWS. EUFWS offer several key advantages: they are available at all times, accessible from anywhere, and provide a real-time, multi-user working platform. Additionally, the system is flexible, allowing for the easy addition of components and services and scalable, adjusting to workload demands. EUFWS have been successfully deployed in Thu Duc City, Vietnam, as a case study and are operating effectively. EUFWS have been successfully deployed in Thu Duc City, Vietnam, as a case study and are operating effectively. Research results indicate that EUFWS supported decision-makers to be effectively risk informed and make intelligent decisions during urban flood emergencies. Finally, this underscores the significant potential of integrating ML and information technology to enhance the management of smart urban drainage systems in flood-prone cities worldwide.

54 ENVIRONMENTAL SCIENCES

ARCADE Analysis Methods & Validation Pathway

The Advanced Reactor Cyber Analysis and Development Environment (ARCADE) provides an automated analysis system which supports risk-informed performance based (RIPB) evaluations of nuclear control systems. Every possible cyber threat which could lead to consequence is identified by simulating the unsafe control action sequences which transform digital harm into physical harm. Eliminating the simulation of complex digital cyber attack chains cuts out unnecessary computational overhead and focuses directly on the physics of cyber-physical attacks. This focus enables designers to make informed decisions which can entirely eliminate categories of cyber threats against advanced reactors through the physical nature of the plant design. This narrowing of cyber threat against nuclear power plants through the physics of the system is intended to make any remaining threat management and cost efficient. This is the goal of the Tiered Cyber Analysis (TCA) outlined in NRC Draft Regulation Guide (RG) 5.96, which provides a RIPB cybersecurity approach for new reactors. ARCADE has been custom developed to meet the demands of the rigorous analysis required in Tier 1 of the TCA, which forms the foundation of the TCA process. Currently, ARCADE is still under development, but has made significant leaps in capability. A pilot analysis on the opensource Asherah simulator was performed which demonstrated key functionality goals. The next stage of ARCADE development involves improvements to the applications which support the analysis system, and enabling the analysis system to utilize the full suite of unsafe control action simulations. Since the analysis method’s core functions are complete, validation of the analysis method will be started concurrent to the next development stages. The automated analysis ARCADE will provide can radically change the cybersecurity design process for advanced reactors, reducing the cost of security implementation while enhancing cyber resilience. The pathway for ARCADE’s development to this goal has become much clearer. The majority of technical hurdles have been cleared, and the remaining development needs have been solidified. ARCADE is now capable of assisting the advanced reactor design process and directly support advanced reactor industry RIPB practices.

22 GENERAL STUDIES OF NUCLEAR REACTORS