Search NASA⌕ Search

SEARCH · Search NASA

Results for “SALT WASTE PROCESSING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

October 2025 Semiannual Composite Salt Waste Processing Facility Decontaminated Salt Solution Toxicity Characteristic Leaching Procedure Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Disposal Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Processing Facility Decontaminated Salt Solution and Z area premix material for the October 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 51 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The October 2025 Semiannual Cement-Free grout sample met 61 79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

Hsieh, Madison [Savannah River National Laboratory↗

April 2025 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Production Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Disposal Facility waste form was prepared at Savannah River National Laboratory using the Salt Waste Processing Facility Decontaminated Salt Solution and Z-area premix material for the April 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 43 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The April 2025 semiannual Cement-Free grout sample met the South Carolina Code of Regulations for Hazardous Waste Management Regulations 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents, and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2024 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2024 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained.1 The April 2024 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2024 (1QFY2024) and the Second Quarter Fiscal Year 2024 (2QFY2024). The following facts pertaining to the WAC are drawn from the analytical results provided in this report. WAC TARGETS and LIMITS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC TARGETS and LIMITS. Nitrosamines were not detected in the SWPF DSS salt solution sample above the instrument detection limits of <1 mg/L. The minimum detection limit (<3.33E-01 pCi/mL) is reported for 94 Nb as determined from the minimum detectable activity associated with the radiochemical method used for this radionuclide. The reported detection limit is above the requested SRMC target minimum detection limit concentration. However, the minimum detection limit reported for the April 2024 semiannual SWPF DSS sample for 94 Nb is lower than the estimated detection limit of 4.38E-01 pCi/mL initially established by SRNL in 2009. Thus, per guidance from SRMC, 2 SRNL continues to achieve as low as practical detection limits for this radionuclide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2023 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2023 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The October 2023 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the Third Quarter Fiscal Year 2023 (3QFY2023) and the Fourth Quarter Fiscal Year 2023 (4QFY2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Undissolved Solids from Salt Waste Processing Facility (SWPF) Salt Batches Collected via Filtration

SRNL researchers performed six experiments wherein 0.1 μm-grade stainless steel filters were used to filter samples pulled from salt batches 6, 9B, and 11B, without the addition of monosodium titanate. Three of these experiments were performed to collect filterable solids from each salt batch and characterize trapped solids via scanning electron microscopy. The remaining three experiments were performed to collect and then dissolve the same solids using 3.5 M nitric acid (similar to that employed in the Salt Waste Processing Facility) for characterization via Inductively-coupled plasma atomic emission spectroscopy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

April 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the April 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The April 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

October 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the October 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). At 64 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The October 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the sample collection at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Salt Waste Processing Facility Streams on the Nitric-Glycolic Flowsheet in the Chemical Processing Cell

An evaluation of the previous Chemical Processing Cell (CPC) testing was performed to determine whether the planned concurrent operation, or “coupled” operations, of the Defense Waste Processing Facility (DWPF) with the Salt Waste Processing Facility (SWPF) has been adequately covered. Tests with the nitricglycolic acid flowsheet, which were both coupled and uncoupled with salt waste streams, included several tests that required extended boiling times. This report provides the evaluation of previous testing and the testing recommendation requested by Savannah River Remediation. The focus of the evaluation was impact on flammability in CPC vessels (i.e., hydrogen generation rate, SWPF solvent components, antifoam degradation products) and processing impacts (i.e., acid window, melter feed target, rheological properties, antifoam requirements, and chemical composition).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Salt Waste Processing Facility August 2022 Tank 201 sample

Two Salt Waste Processing Facility (SWPF) Tank 201 samples were collected from the replacement of the decontaminated salt solution (DSS) coalescer at different times; one in December of 2021 and the other in August 2022. The December 2021 sample was collected after nitric and water flushing of the DSS Coalescer. The Aug 2022 sample was collected after water flushing only. The December 2021 Tank 201 solids were previously characterized and documented. SWPF requested the characterization of the August 2022 Tank 201 sample, and the comparison of the characterization results for these two Tank 201 solids collected at different dates.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Material Compatibility of Elastomers Used in the Salt Waste Processing Facility(SWPF)

Near the beginning of calendar year 2021, Salt Waste Processing Facility (SWPF) processed nearly a million gallons of initially diluted, and subsequently undiluted, supernatant. Higher than usual levels of Isopar L were detected in the Decontaminated Salt Solution (DSS). After shutting down the process and inspecting the DSS coalescers, personnel discovered the coalescers media appeared deformed and at least one had extruded out of the sealing surfaces. The gasket material was removed and sent to the Savannah River National Laboratory to possibly determine the cause of gasket degradation. A memorandum was issued documenting the results that could not rule out assembly error of the coalescer. For example, over torquing the gaskets beyond their recommended degree of compression, may have been a potential failure mode. SRNL recommended performing a quick compatibility test between the different process solutions used at SWPF and four different polymeric materials (the fifth one-Kalrez ® -arrived at the end of this test).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the Soluble and Insoluble Portions of Solids from the Salt Waste Processing Facility Tank 201 and Tank 202 Samples

The Salt Waste Processing Facility (SWPF) Tank 201 and Tank 202 samples have been characterized using X-ray diffraction (XRD), scanning electron microscope/energy dispersive x-ray (SEM/EDX), particle size analysis (PSA-Microtrac), Fourier transform-infrared (FT-IR) and nuclear magnetic resonance ( 1 H NMR) spectroscopic techniques to characterize and identify organic and inorganic components in Tanks 201 and 202 as part of efforts to understand the problems occurring at SWPF due to the presence of solids in the recovered solvent.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the Soluble and Insoluble Portions of Solids from the Salt Waste Processing Facility Tank 201 and Tank 202 Samples

The Salt Waste Processing Facility (SWPF) Tank 201 and Tank 202 samples have been characterized using X-ray diffraction (XRD), scanning electron microscope/energy dispersive x-ray (SEM/EDX), particle size analysis (PSA-Microtrac), Fourier transform-infrared (FT-IR) and nuclear magnetic resonance ( 1 H NMR) spectroscopic techniques to characterize and identify organic and inorganic components in Tanks 201 and 202 as part of efforts to understand the problems occurring at SWPF due to the presence of solids in the recovered solvent.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of glasses in support of the Sludge Batch 9 variability study for coupled operation with the Salt Waste Processing Facility

Prior to the processing of Sludge Batch 9 (SB9) with Frit 803 at the Defense Waste Processing Facility (DWPF), assessments and experimental glass work were completed to support the qualification of SB9 coupled processing with streams from the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). This previous work did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF) because the Product Composition Control System (PCCS) models limited the TiO 2 concentration in glass to 2 weight percent (wt.%). These high activity streams from SWPF include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank as well as Cs-containing strip effluent. The incorporation of these SWPF streams is expected to reach TiO2 concentrations in glass greater than 2 wt.% based on an MST addition of 0.4 g MST/L of salt solution. If double strike operation is required, then the MST addition is increased to 0.8 g MST/L of salt solution. Therefore, revisions to the models contained in PCCS were completed to allow the evaluation of glasses containing greater than 2 wt.% TiO 2 , but less than 6 wt.%. To support the implementation of the revised PCCS for SB9 – Frit 803 processing at DWPF prior to SWPF startup, the applicability of the new durability models for the SB9 variability study glasses was verified. Since the initial SB9 qualification for ARP-MCU coupled operation, additional Tank 40 analyses have been completed, which served as the basis for an updated projection of the SB9 blend composition in Tank 40. To identify a frit optimized for SB9 coupled operation with SWPF, the Savannah River National Laboratory (SRNL) performed a paper-study by utilizing Measurement Acceptance Region (MAR) assessments with DWPF PCCS. Based on these MAR assessment results, Frit 625 was recommended for processing both single and double MST strike scenarios. Savannah River Remediation (SRR) requested that SRNL perform a variability study with both Frit 803 and Frit 625 for SB9 coupled operation with SWPF. The objective of the variability study is to demonstrate that the Product Consistency Test (PCT) responses of the glasses are acceptable relative to the chemical durability of the Environmental Assessment (EA) reference glass and predictable by the current DWPF PCCS models for durability. This report documents the development of a test matrix that will support the variability study. To provide operational flexibility prior to SWPF startup, the predictability of glasses within the glass region for Frit 625-SB9 coupled operation with ARP-MCU was also confirmed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

X-ray diffraction and scanning electron microscope characterizations of the salt waste processing facility tank 101 and tank 104 solid samples

The “as-received” Salt Waste Processing Facility (SWPF) Tank 101 and two Tank 104 samples (pre-wash and washed solids) have been characterized using x-ray diffraction (XRD) and scanning electron microscope/energy dispersive x-ray (SEM/EDX) techniques to address the concerns for the existence of solids, which may interfere with the operational performance of the SWPF crossflow filtration process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Analyses of Boric Acid Samples from the Salt Waste Processing Facility

Savannah River National Laboratory (SRNL) analyzed boric acid samples from the Salt Waste Processing Facility (SWPF). This document reports the results of these analyses. Analysis of these samples indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. The characteristics of both samples was as expected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Potential Routes for Titanium and Mercury Concentrations within Salt Waste Processing Facility

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC)/ Salt Waste Processing Facility (SWPF) personnel to investigate the potential routes for titanium and mercury accumulations within the SWPF Flowsheet. The first part of this work examined how various forms of mercury can migrate through the solvent extraction system. This entailed single stage distribution tests, a multi-stage Extraction-Scrub-Strip (ESS) test, and a detailed speciation analysis of several salt batch feed samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗