Search NASA⌕ Search

SEARCH · Search NASA

Results for “SALT WASTE PROCESSING FACILITY (SWPF)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Investigation of Undissolved Solids from Salt Waste Processing Facility (SWPF) Salt Batches Collected via Filtration

SRNL researchers performed six experiments wherein 0.1 μm-grade stainless steel filters were used to filter samples pulled from salt batches 6, 9B, and 11B, without the addition of monosodium titanate. Three of these experiments were performed to collect filterable solids from each salt batch and characterize trapped solids via scanning electron microscopy. The remaining three experiments were performed to collect and then dissolve the same solids using 3.5 M nitric acid (similar to that employed in the Salt Waste Processing Facility) for characterization via Inductively-coupled plasma atomic emission spectroscopy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

April 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the April 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The April 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

October 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the October 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). At 64 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The October 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the sample collection at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

April 2025 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Production Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Disposal Facility waste form was prepared at Savannah River National Laboratory using the Salt Waste Processing Facility Decontaminated Salt Solution and Z-area premix material for the April 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 43 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The April 2025 semiannual Cement-Free grout sample met the South Carolina Code of Regulations for Hazardous Waste Management Regulations 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents, and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Material Compatibility of Elastomers Used in the Salt Waste Processing Facility(SWPF)

Near the beginning of calendar year 2021, Salt Waste Processing Facility (SWPF) processed nearly a million gallons of initially diluted, and subsequently undiluted, supernatant. Higher than usual levels of Isopar L were detected in the Decontaminated Salt Solution (DSS). After shutting down the process and inspecting the DSS coalescers, personnel discovered the coalescers media appeared deformed and at least one had extruded out of the sealing surfaces. The gasket material was removed and sent to the Savannah River National Laboratory to possibly determine the cause of gasket degradation. A memorandum was issued documenting the results that could not rule out assembly error of the coalescer. For example, over torquing the gaskets beyond their recommended degree of compression, may have been a potential failure mode. SRNL recommended performing a quick compatibility test between the different process solutions used at SWPF and four different polymeric materials (the fifth one-Kalrez ® -arrived at the end of this test).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Initial Analyses of the Salt Waste Processing Facility (SWPF) Batch 2 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Batch 2 for processing. This document reports the initial expedited results of the analyses of the Tank 21H qualification sample. Analysis of the Tank 21H SWPF Batch 2 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual color. Further sample results will be reported in a future document. This memo satisfies part of Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Second Set of Analyses of the Salt Waste Processing Facility (SWPF) Batch 2 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Batch 2 for processing. This document reports the second set of results of the analyses of the Tank 21H qualification sample. Analysis of the Tank 21H SWPF Batch 2 sample indicates that the material contains measured analytes in typical concentrations. This memo along with the previous results memo satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Waste Characterization Analysis - Salt Waste Processing Facility (SWPF) Waste Stream (Q4 CY2020)

The Saltstone Production and Disposal Facility is designed and permitted by the state of South Carolina Department of Health and Environmental Control (SCDHEC) to treat and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site (SRS). Low-level waste (LEW) aqueous streams from the Effluent Treatment Project (ETP) and decontaminated solutions from the Tank Closure Cesium Removal Unit (TCCR) and the Salt Waste Processing Facility (SWPF) are stored in Tank 50 until the LEW can be transferred to the Saltstone Facility for treatment and disposal. In the past, decontaminated solution from the Modular Caustic Side Solvent Extraction Unit (MCU) was stored in Tank 50 until the LEW could be transferred to the Saltstone Facility for treatment and disposal. MCU is currently in a suspended operations state. LEW that meets the Waste Acceptance Criteria (WAC) can be transferred, stored, and treated in the Saltstone Production Facility (SPF) for subsequent disposal as saltstone grout in the Saltstone Disposal Facility (SDF). Sampling will be conducted as new waste streams are identified for treatment and disposal at the Saltstone Industrial Wastewater Treatment Facility (IWTF) and Z-Area Industrial Solid Waste Landfill (ISWLF), Facility ID# 025500-1603, General Condition B.9 or every six years in accordance with South Carolina (SC) Regulation 61-107.19 Parti C, “Solid Waste Management: Solid Waste Landfills and Structural Fill - General Requirements.”

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 13 Tank 42H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 42H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 13. This document reports the long-term results of the analyses of the sample of Tank 42H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 11 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 11. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. However, the sample was dark colored. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 14 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 14. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 11 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 11. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. However, the sample was dark colored. This report satisfies Deliverable 3 of the Technical Task Request (TTR). This revision adds a further triplicate analysis for 129 I content.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ELAWD GROUT HOPPER MOCK-UP TESTING

A 10-inch READCO mixer is used for mixing the premix (45 (wt%) fly ash, 45 wt% slag, and 10 wt% portland cement) with salt solution in the Saltstone Production Facility (SPF). The Saltstone grout free falls into the grout hopper which feeds the suction line leading to the Watson SPX 100 duplex hose pump. The Watson SPX 100 pumps the grout through approximately 1500 feet of piping prior to being discharged into the Saltstone Disposal Facility (SDF) vaults. The existing grout hopper has been identified by the Saltstone Enhanced Low Activity Waste Disposal (ELAWD) project for re-design. The current nominal working volume of this hopper is 12 gallons and does not permit handling an inadvertent addition of excess dry feeds. Saltstone Engineering has proposed a new hopper tank that will have a nominal working volume of 300 gallons and is agitated with a mechanical agitator. The larger volume hopper is designed to handle variability in the output of the READCO mixer and process upsets without entering set back during processing. The objectives of this task involve scaling the proposed hopper design and testing the scaled hopper for the following processing issues: (1) The effect of agitation on radar measurement. Formation of a vortex may affect the ability to accurately measure the tank level. The agitator was run at varying speeds and with varying grout viscosities to determine what parameters cause vortex formation and whether measurement accuracy is affected. (2) A dry feeds over addition. Engineering Calculating X-ESR-Z-00017 1 showed that an additional 300 pounds of dry premix added to a 300 gallon working volume would lower the water to premix ratio (W/P) from the nominal 0.60 to 0.53 based on a Salt Waste Processing Facility (SWPF) salt simulant. A grout with a W/P of 0.53 represents the upper bound of grout rheology that could be processed at the facility. A scaled amount of dry feeds will be added into the hopper to verify that this is a recoverable situation. (3) The necessity of baffles in the hopper. The preference of the facility is not to have baffles in the hopper; however, if the initial testing indicates inadequate agitation or difficulties with the radar measurement, baffles will be tested.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the long-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. This memo satisfies Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples were sent for analysis to satisfy Deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗