Blind Validation Study of PRICE TruePlanning and SEER-H

Two of the primary parametric costing tools used to estimate the development and production cost of future spacecraft hardware are PRICE TruePlanning by PRICE Systems, and System Estimation and Evaluation of Resources-Hardware (SEER-H) by Galorath. These are standard tools used by NASA and industry to estimate the cost of new aerospace hardware. This study is an independent verification of the accuracy of these tools and was originally published in 2018. The purpose of this presentation is to circulate the findings of that study among the NASA cost community. Both PRICE Systems and Galorath have completed internal validation studies of their parametric cost estimating tools; however, they only provided the results of the studies and did not detail the exact methods used to perform the validation. In the present study, cost estimators used PRICE TruePlanning and SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. In the present study, SEER-H had an average error of 23%, median error of -0.3%, with a standard deviation of 43%. PRICE had an average error of 52%, median error of 50%, and standard deviation of 45%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates; however, none of the missions fell within PRICE’s confidence intervals. There were several factors independent of PRICE and SEER-H which may have affected the accuracy of the results in the present study including: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER↗

Blind Validation Study of Parametric Cost Estimation Tool SEER-H for NASA Space Missions

One of the primary parametric cost modeling tools used by NASA and the aerospace industry to estimate the development and production cost of future spacecraft hardware is SEER-H by Galorath. To date, no independent validation of this tool for cost estimation of space missions has been reported in the literature. In the present validation study, cost estimators used SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. The point estimates of SEER-H had an average error of 23%, median error of -0.3%, and a standard deviation of 43%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates. Several factors independent of SEER that may have affected the accuracy of the results have been identified and are discussed; these include: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER-H↗

Blind Study Validating Parametric Costing Tools PRICE True Planning and SEER-H for NASA Science Missions

Two of the primary parametric costing tools used to estimate the development and production cost of future spacecraft hardware are PRICE True Planning - Space Missions Catalog by PRICE Systems, and SEER-H by Galorath. These are standard tools used by NASA and industry to estimate the cost of new aerospace hardware. However, no independent verification of the accuracy of these tools is publicly available. Both PRICE Systems and Galorath have completed internal validation studies of their parametric cost estimating tools; however, they only provided the results of the studies and did not detail the exact methods used to perform the validation. In the present study, cost estimators used PRICE True Planning and SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. In the present study, SEER had an average error of 23%, median error of -0.3%, with a standard deviation of 43%. PRICE had an average error of 52%, median error of 50%, and standard deviation of 45%. There were several factors independent of PRICE and SEER which may have affected the accuracy of the results in the present study including: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

Friz, Paul D.↗

Blind Study Validating Parametric Costing Tools PRICE TruePlanning and SEER-H for NASA Science Missions

Two of the primary parametric costing tools used to estimate the development and production cost of future spacecraft hardware are PRICE TruePlanning - Space Missions Catalog by PRICE Systems, and SEER-H by Galorath. These are standard tools used by NASA and industry to estimate the cost of new aerospace hardware. However, no independent verification of the accuracy of these tools is publicly available. Both PRICE Systems and Galorath have completed internal validation studies of their parametric cost estimating tools; however, they only provided the results of the studies and did not detail the exact methods used to perform the validation. In the present study, cost estimators used PRICE TruePlanning and SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. In the present study, SEER had an average error of 23%, median error of -0.3%, with a standard deviation of 43%. PRICE had an average error of 52%, median error of 50%, and standard deviation of 45%. There were several factors independent of PRICE and SEER which may have affected the accuracy of the results in the present study including: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

Paul D Friz↗

What Drives Spacecraft Cost: A Look Into How Material Characteristics Relate to the Material Complexity Multipliers

Today a variety of engineered materials are used to build the space vehicles and satellites that NASA, DOD and the aerospace community will use in future projects. These materials can be a significant part of the cost when designing and building these systems. Current cost models such as NASCOM, SEER-H and PRICE allow the cost analysis to select materials requirements during the development of the cost model. It should be noted however that some of these models do not always give the most detailed information with respect to material specifications for the given cost model. Instead the materials are defined within broad classification, giving questionable data with regard to specific material cost. It is the objective of this paper to present a summary of basic information on materials to assist the cost analyst in the development of their models. Specifically, this paper will compare materials and their complexity multipliers to some specific material properties.

Rosmait, Russell L.↗

New Method for Systems and Cost Analysis of Human Mars Entry Vehicles

Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically not estimated until after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more efficiently. This paper describes an extension to the tool SAPE (Systems Analysis for Planetary Entry, Descent, and Landing). This extension integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools. This new method is used to analyze several trade spaces of a HIAD (Hypersonic Inflatable Aerodynamic Decelerator) entry vehicle for human Mars missions. Key findings include quantifying the impacts of ballistic coefficient, main engine specific impulse, and thrust-to-weight ratio on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.

Friz, Paul D.↗

Parametric Cost Modeling of a Mid-Lift-to-Drag Ratio Vehicle for Human Mars Entry, Descent, and Landing

Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically estimated after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more rapidly. This paper uses the tool SAPE-C (Systems Analysis for Planetary Entry, Descent, and Landing-Cost). SAPE-C integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools and enables large design tradespace exploration early in the design process. SAPE-C is used to analyze several tradespaces of the Mid-Lift-to-Drag ratio rigid entry vehicle for human Mars missions. Key findings include quantifying the impacts of payload, vehicle length, and main engine specific impulse on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.

Mid L/D↗

Parametric Cost Modeling of a Mid-Lift-to-Drag Ratio Vehicle for Human Mars Entry, Descent, and Landing

Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically estimated after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more rapidly. This paper uses the tool SAPE-C (Systems Analysis for Planetary Entry, Descent, and Landing-Cost). SAPE-C integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools and enables large design tradespace exploration early in the design process. SAPE-C is used to analyze several tradespaces of the Mid-Lift-to-Drag ratio rigid entry vehicle for human Mars missions. Key findings include quantifying the impacts of payload, vehicle length, and main engine specific impulse on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.

Paul D Friz↗

Parametric Cost Modeling of a Mid-Lift-to-Drag Ratio Vehicle for Human Mars Entry, Descent, and Landing

Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically estimated after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more rapidly. This paper uses the tool SAPE-C (Systems Analysis for Planetary Entry, Descent, and Landing-Cost). SAPE-C integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools and enables large design tradespace exploration early in the design process. SAPE-C is used to analyze several tradespaces of the Mid-Lift-to-Drag ratio rigid entry vehicle for human Mars missions. Key findings include quantifying the impacts of payload, vehicle length, and main engine specific impulse on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.

Paul D Friz↗