Search NASA⌕ Search

SEARCH · Search NASA

Results for “SEL-421”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Real-Time Testbed for Transmission Line Protection

Hardware in the loop (HIL) testing is crucial for designing and managing electric power grids. These grids are becoming larger and more complex. The importance for students to have safe and intuitive ways to interact with the devices associated with the power grids has never been more crucial. Since most of these tests involve high voltages, this can be a deterrent for instructors and students in undergraduate programs. HIL testing is a solution to these common issues. This method has become one of the most popular methods for testing these power systems. With the use of Western Michigan University’s (WMU) Real-Time Digital Simulator (RTDS) and SEL-421-7 protection relay, a HIL testbed has been created. These devices were interconnected using the communication protocol known as Generic Object-Oriented Substation Event (GOOSE). A simulated transmission line system was modeled in an RTDS software RSCAD as the basis for this testbed. This model simulated different types of faults that could occur in a transmission line while in operation. The SEL-421-7 relay is connected to the RSCAD simulation via GOOSE to protect our simulated transmission line. This testbed was set up to give students a clear understanding of how distance protection works as well as how the SEL-421-7 will react to various kinds of faults, in addition to how useful the RTDS can be when testing different power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Hardware-in-The-Loop Implementation of Protection and Self-Healing of Microgrids

The design of a reliable protection scheme for microgrids often requires communication between protective devices and microgrid controllers. The authors have developed such a communication assisted scalable protection scheme with a self healing feature to protect a microgrid with 100% Inverter Based Resources (IBRs). The communication assisted scheme must be validated in real time with cyber physical co-simulation for successful demonstration. In this regard, the paper presents a co-simulation platform between a simulated power system model using RTDS and physical protective devices. The primary protection of the scheme is programmed in SEL 421-7 relay and backup protection is programmed in MATLAB on a generic computer acting as a microgrid controller. The IEC 61850 models are used to communicate between SEL-421-7 relay and RTDS, whereas TCP/IP communication connects the microgrid controller to RTDS. The paper’s focus is to demonstrate the co- simulation platform with communication links established using both protocols and validate the proposed scheme in real-time on the IEEE 123 node distribution feeder. The paper explains the configuration of the IEC 61850 and TCP/IP communications as the interface requires proper hardware and software setup. Furthermore, the real time performance indicates the Hardware In the Loop (HIL) framework as a competent testing environment for the developed protection scheme for microgrids.

42 ENGINEERING↗