Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHINE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

SHINE and Mini-SHINE Column Designs for Recovery of Mo from 140 g-U/L Uranyl Sulfate

Argonne is assisting SHINE Medical Technologies (SHINE) in their efforts to develop an accelerator-driven process that utilizes a uranyl-sulfate solution for the production of fission Mo-99. In an effort to design a Mo-recovery system for the SHINE project using low-enriched uranium (LEU), we conducted batch, breakthrough, and pulse tests to determine the Mo isotherm, mass-transfer zone (MTZ), and system parameters for a 130 g-U/L uranyl sulfate solution at pH 1 and 80°C, as described previously. The VERSE program was utilized to calculate the MTZ under various loading times and velocities. The results were then used to design Mo separation and recovery columns employing a pure titania sorbent (110-μm particles, S110, and 60 Å pore size). The plant-scale column designs assume Mo will be separated from 271 L of a 141 g-U/L uranyl sulfate solution, pH 1, containing 0.0023 mM Mo. The VERSE-designed recovery systems have been tested and verified in laboratory-scale experiments, and this approach was found to be very successful.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Summary of LANL FY19 Technical Interface Coordination with SHINE

In FY19, Los Alamos National Laboratory (LANL) provided technical support for SHINE emergent needs and technical interface coordination including coordination of SHINE CFD and thermal hydraulics conference calls, Mo-99 meetings and reviews, national laboratory conference calls, and program management activities such as reporting and tracking requirements for current FY19 activities. LANL has also provided general technology consultation support for emerging issues. LANL has participated in the bi-weekly conference calls with SHINE and other national laboratories regarding LANL’s current activities. Activities discussed include FY18 carryover items including the ANSYS Fluent-Nek5000 comparison study (for assessment of Nek5000 for coupled calculations), Supo 3-D CFD model geometry validation, and releasing CFD-MCNP coupled codes for the generic solution vessel simulations. Also, additional mid-year funded activities discussed during these conference calls include the ANL bubble experiment #2 collaboration. SHINE had a general technology consultation request in FY19. SHINE inquired about LANL’s capability to measure enrichment percentage of uranium samples, however, additional information is needed to continue. The meeting minutes for these activities are shown in Appendix A. LANL has also been providing monthly updates on the laboratory SharePoint site (managed by Pacific Northwest National Laboratory) regarding current FY19 activities. Monthly updates include current activity milestone and deliverable status, completion date updates and variances if applicable, and actual cost at the task dependent activity level. LANL attended several Mo-99 meetings and reviews in FY19. LANL attended the FY19 Mo-99 Laboratory Mid-Year Program and Financial Review at Argonne National Laboratory (ANL) on March 20-21, 2019, as well as the FY19 Mo-99 Program Meeting and Mid-Year Financial Review in Chicago, IL on April 29-30, 2019. LANL also attended the FY20 Laboratory Work Package Planning Meeting at ANL on June 4-6, 2019.

43 PARTICLE ACCELERATORS↗

Scintillation Hydro-Gel for Isotopic Neutron (SHINE): Eco-Friendly Quantum Dot Neutron Detectors

The development of new neutron detectors to replace helium-3 (3He) detectors is imperative due to a worldwide shortage of 3He following the draw down in nuclear weapons production since the end of the Cold War. The United States Department of Homeland Security would like to deploy monitors for the detection of neutron emissions from shipping containers housing illicit nuclear material; however, this effort has been put on hold until new replacements for 3He detectors can be developed. Scintillation Hydro-Gel for isotopic Neutron Emitters (SHINE) is a unique, first of its kind, 6Li-loaded quantum dot gel scintillator developed at INL. By incorporating 6Li with quantum dots in a gel matrix, SHINE displays the best properties of liquid and solid scintillators without their disadvantages such as continuous filtering to keep liquids free of contaminates, slow throughput of containers, higher base component costs, ‘dead’ voids in solid scintillators, and a high loading of 6Li without compromising on light transparency. Additionally, SHINE is completely eco-friendly, a breakthrough in high-efficiency detection systems. SHINE is a unique combination of 6LiCl, a highly water-soluble compound, and InP/ZnS core/shell quantum dots, which are poured into a gel-form using cross-linking polymers. In this presentation, SHINE has been successfully tested for neutron detection and shows promise as both a replacement for current 3He neutron detectors as well as potential use in handheld, compact neutron detection units and antineutrino detection.

36 MATERIALS SCIENCE↗

Technical Interface Coordination with SHINE (FY2020 Summary)

In FY20, Los Alamos National Laboratory (LANL) performed technical interface coordination with SHINE including coordination of SHINE CFD and thermal hydraulics conference calls, national laboratory conference calls, and program management activities such as reporting and tracking requirements for current FY20 activities. SHINE did not request any general technology consultation support for emergent issues. LANL has participated in the bi-weekly conference calls with SHINE and other national laboratories regarding LANL’s current activities. Activities discussed include the Supo 3-D CFD model geometry validation, releasing the CFD-MCNP coupled codes for the generic solution vessel simulations, and the ANL bubble experiment #2 design, preparation, and collaboration.

07 ISOTOPE AND RADIATION SOURCES↗

Integrating System to Edge-of-Network Architecture and Management for SHINES (SEAMS) Technologies of High Penetration Grids

Consistent with the U.S. DOE’s EERE SHINES FOA objectives, the goal of this project was to enable integration from EMS to variable DER in a way that delivered visibility and opportunities for managing and controlling distributed resources using SEAMS technologies. This project implemented several SHINES technologies, which included: (1) three Stem battery systems; (2) six ConnectDER PV collars; (3) two E-Gear PV/Battery storage interfaces; and (4) eight Kitu smart inverter emulators. A Siemens Energy IP DEMS was deployed in a development environment and integrated with the SHINES technologies via OpenADR and IEEE 2030.5 protocols with documented architecture. In the case of IEEE 2030.5, a suite of technologies including a gateway, an API, software and a server from Kitu Systems (the Citadel, Convoy, Kitu Crosslink API, and Kitu Spark) were used to demonstrate that the utility could achieve visibility of distributed energy resources (DER) and control of single and multiple DER systems with a single command. The project also included a LCOE analysis of SHINES technologies compared to traditional system and circuit mitigation measures.

14 SOLAR ENERGY↗

Micro-SHINE Uranyl Sulfate Irradiations at the Linac

Peroxide formation due to water radiolysis in a uranyl sulfate solution is a concern for the SHINE Medical Technologies process in which Mo-99 is generated from the fission of dissolved low enriched uranium. To investigate the effects of power density and fission on peroxide formation and uranyl-peroxide precipitation, uranyl sulfate solutions were irradiated using a 50-MeV electron linac as part of the micro-SHINE experimental setup. Results are given for uranyl sulfate solutions with both high and low enriched uranium irradiated at different linac powers.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Compendium of Phase-I Mini-SHINE Experiments

Argonne National Laboratory is assisting SHINE Medical Technologies in their efforts to develop the technology to become a domestic Mo-99 producer using low-enriched uranium (LEU). Mini-SHINE experiments are being performed with the high-current electron linear accelerator (linac) at Argonne. The target solution is a 90-150 g-U/L LEU uranyl sulfate at pH 1. In Phase 1, the convertor was tantalum with a maximum beam power on the convertor of 10 kW, and the target solution was limited to 5 L. This configuration generated a peak fission power density of 0.05 W/mL. Nine experiments were performed between February and October 2015. Results are reported and discussed for each experiment regarding the off-gas analysis system, the sampling and Mo-recovery operation, and the Mo-product concentration and purification system. In Phase 2, the convertor will be depleted uranium; beam power will increase to 20 kW; and the solution volume will be 18 L. This configuration will generate a fission power density of up to 1 W/mL.

43 PARTICLE ACCELERATORS↗

Direct Down-scale Experiments of Concentration Column Designs for SHINE Process

Argonne is assisting SHINE Medical Technologies in their efforts to become a domestic Mo-99 producer. The SHINE accelerator-driven process uses a uranyl-sulfate target solution for the production of fission-product Mo-99. Argonne has developed a molybdenum recovery and purification process for this target solution. The process includes an initial Mo recovery column followed by a concentration column to reduce the product volume from 15-25 L to < 1 L prior to entry into the LEU Modified Cintichem (LMC) process for purification.1 This report discusses direct down-scale experiments of the plant-scale concentration column design, where the effects of loading velocity and temperature were investigated.

42 ENGINEERING↗

Summary of LANL FY18 Technical Interface Coordination with SHINE

In FY18, Los Alamos National Laboratory (LANL) provided technical support for SHINE emergent needs and technical interface coordination including coordination of SHINE CFD/Thermal Hydraulics/transient analysis conference calls, Mo-99 meetings and reviews, national laboratory conference calls, and program management activities such as reporting and tracking requirements for cur rent FY18 activities. LANLhas also provided general technology consultation support for emerging issues.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of Zircaloy-4 Welding and Hydrogen Charging Effects for Use as the Structural Material for the Target Solution Vessel and Support Lines of SHINE

The subcritical hybrid intense neutron emitter (SHINE) is a proposed 99 Mo production facility to be constructed in the United States. It uses a deuterium (D) and tritium (T) fusion source to cause subcritical fission in an aqueous uranium solution, which is cycled to collect the 99 Mo products. The target solution vessel (TSV) is the container of the aqueous uranium solution, so it must remain structurally sound during operational exposure to water, fission products, neutrons, and hydrogen isotopes. The TSV will be large enough to require welding, so the exposure of joints to these same conditions must also be considered. The candidate material being investigated is Zircaloy-4. While Zircaloy-4 has a long history in the nuclear industry, it has primarily been used as fuel cladding at service temperatures of ~300°C. Zircaloy-4 must be evaluated for behavior under neutron irradiation at SHINE-relevant temperatures of <100°C. In this project, the effects of hydrogen, welding, and neutron irradiation at low temperatures are investigated.

36 MATERIALS SCIENCE↗

VENTSAR V3.0: A Python GUI for Estimating Contaminant Concentrations on or Near Buildings Due to Building Effects and Plume Rise and For Calculating Inhalation and Plume Shine Doses

VENTSAR: Originated as VENTAX (Smith and Weber 1983) on the IBM Mainframe at the Savannah River Site (SRS) as a Fortran program. Updated to VENTSAR XL V1.0 (Simpkins 1997) as a spreadsheet version using macros created in Microsoft Excel. Later updated to VENTSAR XL V2.0 (Dixon 2018) as a spreadsheet executing a modified version of the original VENTAX Fortran code. Estimates contaminant concentrations on or near a building from a release at a nearby location. Calculates concentrations for a given meteorological exceedance probability or for a given stability and wind speed combination. Can model a single building with or without a penthouse on top or a ground location from either a stack or ground release. Plume rise can be considered. Contaminant releases can be chemical or radioactive with downwind concentrations determined at user-specified distances. Wind passing over and around buildings creates a complicated dispersion pattern. Air-intake vents may be located on building roofs or near the ground downwind of a release source. An estimation of pollutant concentrations on or near a structure is important in determining expected pollutant levels. Meteorological data are selected based on a specific area of the site. Fortran-based VENTAX able to make fast, complex mathematical calculations. Not user-friendly VENTSAR XL V1.0 no longer supported due to obsolete Excel macros. VENTSAR XL V2.0 an interim solution using an Excel spreadsheet to interface with the modified VENTAX Fortran code. Requires user to have Microsoft Excel. Not an intuitive interface for someone unfamiliar with VENTSAR. Does not perform dose calculations. VENTSAR V3.0 goal to combine the strengths of previous versions of VENTSAR into a single, powerful yet user-friendly program with a Graphical User Interface (GUI). Not dependent upon a specific program or plug-ins. Self-contained package to be used on any computer running Microsoft Windows. User-friendly, intuitive GUI created in Python for parameter input. Executes same modified VENTAX Fortran code as VENTSAR XL V2.0. Outputs formatted text file of completed calculations for easy review and dissemination. Performs inhalation and plume shine dose calculations for up to 11 user-selected nuclides from a nuclide dose factor library of almost 500 nuclides. 12 test cases were created for verification of V1.0 and V2.0. Same test cases run in V3.0 to verify correct performance. V3.0 produced similar results to V1.0. Confirmed GUI did not alter calculations in any way. Comparisons of the test case results confirm the V3.0 GUI does not influence the VENTSAR calculations. Simply passes same input parameters to VENTAX Fortran code for execution. Provides end user an easy-to-use, intuitive tool to quickly make building effect and plume rise calculations, as well as, inhalation and plume shine dose calculations. No experience with or working knowledge of Fortran, Excel, command line, or macros required. Self-contained package allows VENTSAR be deployed to any Windows computer without the need for specific programs or plug-ins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light in the shadows: primordial black holes making dark matter shine

We consider the possibility of indirect detection of dark sector processes by investigating a novel form of interaction between ambient dark matter (DM) and primordial black holes (PBHs). The basic scenario we envisage is that the ambient DM is “dormant”, i.e., it has interactions with the SM, but its potential for an associated SM signal is not realized for various reasons. We argue that the presence of PBHs with active Hawking radiation (independent of any DM considerations) can act as a catalyst in this regard by overcoming the aforementioned bottlenecks. The central point is that PBHs radiate all types of particles, whether in the standard model (SM) or beyond (BSM), which have a mass at or below their Hawking temperature. The emission of such radiation is “democratic” (up to the particle spin), since it is based on a coupling of sorts of gravitational origin. In particular, such shining of (possibly dark sector) particles onto ambient DM can then activate the latter into giving potentially observable SM signals. We illustrate this general mechanism with two specific models. First, we consider asymmetric DM, which is characterized by an absence of ambient anti-DM, and consequently the absence of DM indirect detection signals. In this case, PBHs can “resurrect” such a signal by radiating anti-DM, which then annihilates with ambient DM in order to give SM particles such as photons. In our second example, we consider the PBH emission of dark gauge bosons which can excite ambient DM into a heavier state (which is, again, not ambient otherwise), this heavier state later decays back into DM and photons. Finally, we demonstrate that we can obtain observable signals of these BSM models from asteroid-mass PBHs (Hawking radiating currently with ~ $ \mathcal{O}\left(\textrm{MeV}\right) $ temperatures) at gamma-ray experiments such as AMEGO-X.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Signals of millicharged dark matter in light-shining-through-wall experiments

We discuss a novel detection technique for millicharged dark matter that makes use of existing light-shining-through-wall (LSW) experiments searching for massive dark photons. Since millicharged particles interact with both the visible and dark sectors, a small background of such particles enables the search for visible signals even in the limit of a massless dark photon. Furthermore, for sufficiently large couplings, a small dark matter subcomponent consisting of millicharged particles can have a terrestrial abundance that is significantly enhanced with respect to its galactic abundance. We leverage this fact to show that in certain parts of parameter space, future runs of the LSW Dark SRF experiment can be used to set the strongest limits on millicharged relics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Isolated oxygen vacancies in strontium titanate shine red: Optical identification of Ti 3+ polarons

Oxide perovskites exhibit fascinating physical properties that identify them as key materials for the next generation of oxide-based functional electronic devices, as well as for catalysis and photochemistry applications. In strontium titanate, substantial efforts have been devoted to elucidate the role of oxygen vacancies and localized electronic states, such as polarons, on those properties. In this paper, a new model is presented that assigns a definitive red luminescence signature at 2.0 eV to Ti 3+ polarons trapped at isolated oxygen vacancies. This emission provides an unequivocal identification for the oxygen vacancies, which allows monitoring their creation and annealing by a variety of physio-chemical treatments. Ionoluminescence with energetic (MeV) ion beams enables such identification by combining the sensitivity and resolution of spectroscopic techniques with their in situ character, as well as controlled incorporation of point defects, such as oxygen vacancies. Alternative models assigning the blue luminescence emission at 2.8 eV to oxygen vacancies are not supported by the experimental results. Finally and therefore, oxygen vacancies shine red and not blue, as previously proposed.

36 MATERIALS SCIENCE↗

$K^0_S$ meson production in inelastic p+p interactions at 31, 40 and 80 $\text {Ge}\hspace{-1.00006pt}\text {V}\!/\!c$ beam momentum measured by NA61$/$SHINE at the CERN SPS

The yields of $K^0_S$ mesons have been measured in inelastic p+p interactions at incident projectile momenta of 31, 40 and 80 $\text {Ge}\hspace{-1.00006pt}\text {V}\!/\!c$ ($\sqrt{s_{NN}}=7.7, 8.8$ and 12.3 $\text {Ge}\hspace{-1.00006pt}\text {V}$, respectively). The data were recorded by the NA61$/$SHINE spectrometer at the CERN Super Proton Synchrotron and the $K^0_S$ mesons identified via their decays into $\pi ^{+} \pi ^{-}$ pairs. Double-differential distributions are presented as function of transverse momentum and rapidity. The mean multiplicities of $K^0_S$ mesons were determined to be $(5.95 \pm 0.19 (stat) \pm 0.30 (sys)) \times 10^{-2}$ at 31 $\text {Ge}\hspace{-1.00006pt}\text {V}\!/\!c$, $(7.61 \pm 0.13 (stat) \pm 0.43 (sys)) \times 10^{-2}$ at 40 $\text {Ge}\hspace{-1.00006pt}\text {V}\!/\!c$ and $(11.58 \pm 0.12 (stat) \pm 0.55 (sys)) \times 10^{-2}$ at 80 $\text {Ge}\hspace{-1.00006pt}\text {V}\!/\!c$. The results on $K^{0}_{S}$ production are compared with the production of charged kaons in corresponding reactions and with model calculations (Epos1.99, SMASH 2.0 and PHSD) as well as with published data from other experiments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Spins and Heat in Nanoscale Electronic Systems (SHINES) (Final Report)

This project covers the funding period of 08/01/2014-07/31/2020. The project received a no-cost extension for 6 months which ended on 01/31/2021. The overall project is divided into two periods: full funding of $\$3$ million/year with the total of $\$12$ million for the first four years (08/01/2014-07/1/2018); and $\$1.9$ million for the two-year extension (08/01/2018-07/31/2020). During the first four-year period, SHINES supported 14 PIs plus two UCR seed PIs (internally funded). During the 2-year extension, only 7 PIs were involved, and 8 UCR seed PIs were supported using UCR internal funds.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Welded and Hydrogen Charged Zircaloy-4 and Welded Stainless Steel 347 Property Data and Microstructures for the Target Solution Vessel and Support Lines of SHINE

SHINE Medical Technologies is developing a facility that will produce molybdenum-99 for medical isotope procedures. As part of this facility, a metal tank, called the target solution vessel (TSV), will hold a uranyl sulfite solution. The TSV must withstand neutron irradiation near room temperature and potential corrosion from the aqueous solution. The large cylindrical TSV will be fabricated by welding and will have numerous pipes and connections also attached via welding. The vessel and those pipes will have varying thicknesses so both gas tungsten arc welding (GTAW) and flux-cored arc welding (FCAW) will be necessary to fabricate different sections. The original material under consideration for the TSV was Zircaloy-4 (Zry-4), but it is known to form a hydride which can degrade its mechanical properties. Thus, some investigation here is focused on the effects of hydrogen uptake in the Zry-4. Additionally, the alternative material being considered is AISI 347, a stainless steel. Both materials have little existing data for their neutron irradiation behavior below 100°C, and both have open questions on the weld behavior under neutron irradiation. Testing has focused on characterizing their weld properties with tensile tests and performing neutron irradiation of samples in the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL).

07 ISOTOPE AND RADIATION SOURCES↗