Search NASA⌕ Search

SEARCH · Search NASA

Results for “SMSR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Performance experiments with alternative advanced teleoperator control modes for a simulated solar maximum satellite repair

Experiments are described which were conducted at the JPL Advanced Teleoperator Lab to demonstrate and evaluate the effectiveness of various teleoperator control modes in the performance of a simulated Solar Max Satellite Repair (SMSR) task. THe SMSR was selected as a test because it is very rich in performance capability requirements and it actually has been performed by two EVA astronauts in the Space Shuttle Bay in 1984. The main subtasks are: thermal blanket removal; installation of a hinge attachment for electrical panel opening; opening of electrical panel; removal of electrical connectors; relining of cable bundles; replacement of electrical panel; securing parts and cables; re-mate electrical connectors; closing of electrical panel; and reinstating thermal blanket. The current performance experiments are limited to thermal blanket cutting, electrical panel unbolting and handling electrical bundles and connectors. In one formal experiment even different control modes were applied to the unbolting and reinsertion of electrical panel screws subtasks. The seven control modes are alternative combinations of manual position and rate control with force feedback and remote compliance referenced to force-torque sensor information. Force-torque sensor and end effector position data and task completion times were recorded for analysis and quantification of operator performance.

Das, H.↗

Integrated tools for teleoperated satellite repair

Tools and tool handling techniques designed for demonstrating the use of the Advanced Teleoperation System at JPL in satellite repair operations are described in this paper. Our model for the repair demonstration is the Main Electronics Box (MEB) replacement on the Solar Maximum Satellite Repair (SMSR) procedure developed by NASA and successfully performed by the crew of Space Shuttle STS-13 in 1984. A summary of the repair procedure consists of uncovering thermal protection blankets on the satellite, removing screws from the MEB panel, opening the panel and clamping it in place, then removing electrical connectors from their sockets, cutting cords that hold electrical cables to the MEB panel, replacing the panel, and finally reversing the previous procedures. Methods for handling tools used in our SMSR procedure, along with details of the tool designs are discussed in this paper.

Das, H.↗

Teleoperator performance in simulated Solar Maximum Satellite repair

An investigation is conducted of the relative benefits of different teleoperator control modes in simulated space servicing. The simulation replicates part of the Solar Maximum EVA Satellite Repair (SMSR) mission of STS-13, in 1974. The formal experimental design and statistical analysis presented demonstrates that position control is superior for small workspace volume management. Quantitative studies demonstrate significant benefits of shared Cartesian control modes for contact tasks; good performance will require the systematic analysis and synthesis of man-machine systems.

Schenker, Paul S.↗

Mars Relays Satellite Orbit Design Considerations for Global Support of Robotic Surface Missions

This paper discusses orbit design considerations for Mars relay satellite (MRS)support of globally distributed robotic surface missions. The orbit results reported in this paper are derived from studies of MRS support for two types of Mars robotic surface missions: 1) the mars Environmental Survey (MESUR) mission, which in its current definition would deploy a global network of up to 16 small landers, and 2)a Small Mars Sample Return (SMSR) mission, which included four globally distributed landers, each with a return stage and one or two rovers, and up to four additional sets of lander/rover elements in an extended mission phase.

Robitics Mars↗

Managing Risk for the James Webb Space Telescope Deployment Mechanisms: Enabling First Light

The $10 billion James Webb Space Telescope (JWST) is perhaps the most ambitious astronomy mission in NASA history and is the largest and most powerful space science telescope optimized for infrared detection. It is operating in an L2 Orbit about a million miles away from the earth. This will complement and extend the discoveries of the Hubble Space Telescope. It was so big that it had to fold origami – style to fit in the rocket and open in space.Webb’s 5-layer tennis court sized sunshield assembly(SSA) protects the telescope from the Sun’s thermal radiation enabling instruments to operate about 230degree C below 0. It relayed the first amazing picture of galaxies to the world on 12 July 2022. Webb’s unprecedented infrared sensitivity will peer back in time over 13.5 billion years to see the first galaxies born after the Big Bang.

JWST↗