Search NASA⌕ Search

SEARCH · Search NASA

Results for “SNIC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Investigation of beam transmission in A 9SDH-2 3.0 MV NEC pelletron tandem accelerator

Electrostatic tandem accelerators are widely used to accelerate ions for experiments in materials science such as high energy ion implantation, materials modification, and analyses. Many applications require high beam current as well as high beam brightness at the target; thus, maximizing the beam transmission through such electrostatic accelerators becomes important. The Ion Beam Modification and Analysis Laboratory (IBMAL) at University of North Texas is equipped with four accelerators, one of which is a 9SDH-2 3.0 MV National Electrostatic Corporation (NEC) Pelletron Registered-Sign tandem accelerator. The tandem accelerator is equipped with three ion sources: one radio frequency-He ion source (Alphatross) and two ion sources of Cs-sputter type, the SNICS II (Source of Negative Ions by Cesium Sputtering) and a Cs-sputter source for trace-element accelerator based mass spectrometry. This work presents a detailed study of the beam transmission of hydrogen, silicon, and silver ions through the accelerator using the SNICS ion source with injection energies ranging from 20 keV to 70 keV. The beam transmission is quantified for three different terminal voltages: 1.5 MV, 2.0 MV and 2.5 MV. For a given terminal voltage, it has been found that beam transmission is strongly dependent on the ion source injector potential. Details of experiments and data analysis are presented.

43 PARTICLE ACCELERATORS↗

HIGH-ENERGY GAMMA-RAY AFTERGLOWS FROM LOW-LUMINOSITY GAMMA-RAY BURSTS

The observations of gamma-ray bursts (GRBs) such as 980425, 031203 and 060218, with luminosities much lower than those of other classic bursts, lead to the definition of a new class of GRBs-LL-GRBs. The nature of the outflow responsible for them is not yet clear. Two scenarios have been suggested: one is the conventional relativistic outflow with initial Lorentz factor of order of GAMMA{sub 0} approx> 10 and the other is a trans-relativistic outflow with GAMMA{sub 0} approx = 1-2. Here, we compare the high-energy gamma-ray afterglow emission from these two different models, taking into account both synchrotron self-inverse Compton (SSC) scattering and the external inverse Compton scattering due to photons from the cooling supernova or hypernova envelope (SNIC). We find that the conventional relativistic outflow model predicts a relatively high gamma-ray flux from SSC at early times (<10{sup 4} s for typical parameters) with a rapidly decaying light curve, while in the trans-relativistic outflow model, one would expect a much flatter light curve of high-energy gamma-ray emission at early times, which could be dominated by both the SSC emission and the SNIC emission, depending on the properties of the underlying supernova and the shock parameter epsilon{sub e} and epsilon{sub B}. The Fermi Gamma-ray Space Telescope should be able to distinguish between the two models in the future.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Bifurcation Generated Mechanical Frequency Comb

Here, we demonstrate a novel response of a nonlinear micromechanical resonator when operated in a region of strong, nonlinear mode coupling. The system is excited with a single drive signal and its response is characterized by periodic amplitude modulations that occur at timescales based on system parameters. The periodic amplitude modulations of the resonator are a consequence of nonlinear mode coupling and are responsible for the emergence of a “frequency-comb” regime in the spectral response. By considering a generic model for a 1:3 internal resonance, we demonstrate that the novel behavior results from a saddle node on an invariant circle (SNIC) bifurcation. The ability to control the operating parameters of the micromechanical structures reported here makes the simple micromechanical resonator an ideal test bed to study the dynamic response of SNIC behavior demonstrated in mechanical, optical, and biological systems.

42 ENGINEERING↗

Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species 80Ge and 17,18F accounted for 763 of these hours. This included an experiment using 17F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich 81Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. The majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes. This ion source uses a quartz tube in the transfer line between the production target and the ion source to selectively slow down some elements such as rubidium and cesium.

43 PARTICLE ACCELERATORS↗

Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species {sup 80}Ge and {sup 17,18}F accounted for 763 of these hours. This included an experiment using {sup 17}F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich {sup 81}Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was subsequently declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. Therefore, the majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes.

43 PARTICLE ACCELERATORS↗

Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report)

This report summarizes a pioneering effort in Electric Vehicle charging infrastructure ecosystem cybersecurity requirements, assessment methodologies, functional verification, as well as embodiment of the key technologies in the form of hardware and software tools being made available to the public. EPRI led a team of experts, as well as a stakeholder coalition encompassing all key actors in the EV charging infrastructure ecosystem that includes eXtreme Fast Charging (XFC) equipment (defined as 200kW or above). EV charging infrastructure in the United States is a patchwork of networks that have continued to grow organically and have been designed to serve the charging needs of the EV owners, who are their customers. In doing so, each network provider, as well as their connected entities such as the cloud Electric Vehicle Service Providers or EVSPs, utility back office, utility AMI networks, payment networks, as well as Original Equipment Manufacturer (EV manufacturer) telematics networks, have designed systems that may work well individually, but no single entity is responsible for the entire ecosystem to be secure in terms of data exchange. Furthermore, there is no uniformity in how each actor has implemented the cybersecurity requirements since no system-wide cybersecurity requirements existed prior to this project. The final project report describes the technical approach guided by the EV charging infrastructure cybersecurity working group, convened specifically for this project. The technical approach included definition of requirements at the ecosystem level, treated as a ‘system of systems’, and then passed down to individual systems (EVSE, EV, cloud EVSP, utility, and the payment networks), followed by developing the cybersecurity risk and vulnerability assessment methods, that were later applied to real-world cyber-physical systems at EPRI, ANL, and NREL laboratories, to validate both the process and the results. Finally, in a spotlight over the most vulnerable equipment, which is the EV charge station (AC or DC), the team developed a multi-layer cybersecurity implementation in the embedded domain embodied by the open-source Secure Network Interface Card (SNIC) demonstrating the various ways in which the infrastructure can be secured protecting against the identified attack surfaces. Finally, the entire process of EV infrastructure cybersecurity assessment was encapsulated in the Electric Vehicle Charging Cybersecurity Management (EVC2M) online GUI-based tool, that is expected to be released to the public. The report presents the objectives, the technical approach, the key results, and recommendations for future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cross-sections for 43 Sc, 44 m Sc, and 44 g Sc from two heavy ion reactions

Two different heavy ion reactions were used to produce 43 Sc (t$_{\frac12}$ = 3.891 h), 44g Sc (t$_{\frac12}$ = 4.042 h), and 44m Sc (t$_{\frac12}$ = 58.61 h) among other stable or long-lived chemically separable products. Production cross sections for 19 F + 27 Al and the reverse kinematic reaction 35 Cl + nat B were measured using an MC-SNICS ion source and the Notre Dame FN Tandem Accelerator. 19 F beams from 35 to 60 MeV were produced with beam currents between 40–80 pnA and 35 Cl beams were produced at six entrance energies with comparable beam currents. This work reports nuclear reaction cross sections 27 Al ( 19 F, x) 43 Sc, 27 Al ( 19 F, pn) 44g Sc, and 27 Al ( 19 F, pn) 44m Sc at six energies between 35 and 60 MeV lab energy. Cross sections within the same energy range were measured for 27 Al ( 19 F, 3pn) 42 K and 27 Al ( 19 F, 3p) 43 K. Comparative measurements were performed for the same compound nucleus produced from nat B( 35 Cl, x) 43 Sc, nat B( 35 Cl, pn) 44g Sc, and nat B( 35 Cl, pn) 44m Sc. The measured thin target cross sections show an overestimation by several statistical models for the scandium radioisotopes. This is corroborated by the measured thick target production rates for both entrance channels. This may be due to angular momentum effects of a heavy ion entrance channel compared to light-ion production, but additional work is required to understand this discrepancy. Finally, these measurements demonstrate that the medically useful 43 Sc, 44g Sc, and 44m Sc radioisotopes can be free of the long-lived contaminant 46 Sc without the use of enriched targets, using heavy ion beams and robust target materials.

07 ISOTOPE AND RADIATION SOURCES↗

An overview of the facilities, activities, and developments at the University of North Texas Ion Beam Modification and Analysis Laboratory (IBMAL)

The Ion Beam Modification and Analysis Laboratory (IBMAL) at the University of North Texas includes several accelerator facilities with capabilities of producing a variety of ion beams from tens of keV to several MeV in energy. The four accelerators are used for research, graduate and undergraduate education, and industrial applications. The NEC 3MV Pelletron tandem accelerator has three ion sources for negative ions: He Alphatross and two different SNICS-type sputter ion sources. Presently, the tandem accelerator has four high-energy beam transport lines and one low-energy beam transport line directly taken from the negative ion sources for different research experiments. For the low-energy beam line, the ion energy can be varied from {approx}20 to 80 keV for ion implantation/modification of materials. The four post-acceleration beam lines include a heavy-ion nuclear microprobe; multi-purpose PIXE, RBS, ERD, NRA, and broad-beam single-event upset; high-energy ion implantation line; and trace-element accelerator mass spectrometry. The NEC 3MV single-ended Pelletron accelerator has an RF ion source mainly for hydrogen, helium and heavier inert gases. We recently installed a capacitive liner to the terminal potential stabilization system for high terminal voltage stability and high-resolution microprobe analysis. The accelerator serves a beam line for standard RBS and RBS/C. Another beamline for high energy focused ion beam application using a magnetic quadrupole lens system is currently under construction. This beam line will also serve for developmental work on an electrostatic lens system. The third accelerator is a 200 kV Cockcroft-Walton accelerator with an RF ion source. The fourth accelerator is a 2.5 MV Van de Graaff accelerator, which was in operation for last several decades is currently planned to be used mainly for educational purpose. Research projects that will be briefly discussed include materials synthesis/modification for photonic, electronic, and magnetic applications, surface sputtering and micro-fabrication of materials, development of high-energy ion microprobe systems, and educational and outreach activities.

43 PARTICLE ACCELERATORS↗