Search NASASearch

SEARCH · Search NASA

Results for “SPACECRAFT POWER SUPPLY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

The heat sterilizable battery.

Sealed heat sterilizable high impact resistant battery for space missions, grafting acrylic acid and polyethylene by irradiation for separator

SPACECRAFT POWER SUPPLY

Radiation hardening design of nuclear powered spacecraft

The design and operation of space systems utilizing nuclear fueled power systems must consider the radiation environment from the earliest stages of their design. A range of nuclear systems are being considered for present and future satellite systems capable of supplying tens of kilowatts to multimegawatt and generating a corresponding range of radiation environments. The effects of these radiations on electronics and materials can be minimized by implementing early design considerations which maximize the design efficiency and minimize the impact on system mass. Space systems design considerations for the radiation environment must include all sources in addition to the self induced gamma ray and neutron radiation. These include the orbital dependent environment from the high energy electron and protons encountered in natural space. The system trades which the designer must consider in the development of space platforms which utilize nuclear reactor power supplies are discussed.

R E Schmidt

Solar Array Automation Limitations

Significant progress in the automation of the spacecraft electrical power systems has been made within the past few years. This is especially important with the development of the space station and the increasing demand on the electrical power systems for future satellites. The key element of the spacecraft power system, the solar arrays which supply the power, will have to grow to supply many tens of kilowatts of power within the next twenty years. This growth will be accompanied by the problems associated with large distributed power systems. The growth of the arrays, the on-array management problems and potential solutions to array degradation or failure are discussed. Multilowatt arrays for unmanned spacecraft with comments on the implications of array degradation for manned spacecraft are discussed.

Terry M Trumble

Ulysses navigation

Ulysses, a cooperative NASA and ESA project, measures charged and neutral particles, magnetic fields, and electromagnetic wave emissions from the Sun's polar regions and the out of elliptic heliospheric environment. ESA supplied the spacecraft and one half of the instruments, and is in control of the spacecraft and its attitude. NASA supplied the power supply, one half of the instruments, the launch vehicle, and tracks the spacecraft and performs the navigation. Orbit determination results mapped to the time of Jupiter's arrival show improved accuracy and consistency over the course of the mission to date. Solar radiation pressure model uncertainties are major contributors to orbit determination errors, but are being estimated more accurately as data are accumulated.

H. J. Gordon

Space Power

Appropriate directions for the applied research and technology programs that will develop space power systems for U.S. future space missions beyond 1995 are explored. Spacecraft power supplies; space stations, space power reactors, solar arrays, thermoelectric generators, energy storage, and communication satellites are among the topics discussed.

Source record

Automatic battery formation cycler and controller

Automatic battery formation cycler and controller to determine charge capacity and to perform charge-discharge operations for electrochemical cells intended for satellite power sources

CHARGE DISTRIBUTION

Value of Geothermal Energy Storage for Supply-Side and Demand-Side Applications

This report presents the results of a study examining the value potential for geothermal energy storage (GES), a long-duration energy storage resource that stores thermal and/or geomechanical energy in the subsurface. GES could benefit the overall U.S. power system by temporally shifting electricity generation (supply-side) or meeting building heating and cooling load (demand-side). This report analyzes supply-side and demand-side opportunities independently because of differences in applications and models. Currently there is significant uncertainty about the development costs for GES, with only a limited number of demonstration plants for electric energy storage and building heating and cooling storage developments. In this report, we estimate the value of supply-side and demand-side GES to the bulk power system in the contiguous United States. Because of the significant uncertainty about GES development costs, this analysis does not consider GES deployment costs but instead focuses on the value of GES to the U.S. electricity system. The estimated values of GES provide reference points for economically competitive commercial cost targets. Supply-side GES is modeled as part of an enhanced geothermal system (EGS) generation plant in NREL's Regional Energy Deployment System (ReEDS) capacity expansion model (Ho et al. 2021). In contrast to conventional geothermal plants, which generate constant power, EGS plants have unique features that may allow for in-reservoir energy storage for flexible generation. Demand-side GES for heating and cooling, including seasonal hot and cold storage and short-duration heat pump storage, is incorporated into a price-taker model using Cambium electricity marginal cost projections. To establish an upper bound for the value of GES, analysis focused on favorable scenarios for storage with high generation from zero marginal cost, variable renewable energy resources. High penetrations of variable renewable energy generation can increase hourly electricity price variability, which increases the value of temporal energy arbitrage for storage technologies like GES.

15 GEOTHERMAL ENERGY

Resilience Strategies to Ensure Water Supply Continuity During Extended Grid Outages

The towns of Edgartown, Oak Bluffs and Tisbury, on the island of Martha’s Vineyard, MA, are concerned about the effect of prolonged grid outages on continuity of their water supply. Water pumping stations operated by the water utilities that currently serve each of the towns currently have backup power generation that can support water delivery for up to one week during peak water demand periods. Sandia advised on options to extend water supply to two weeks.

Mammoli, Andrea Alberto [Sandia National Laborator

Quantifying Primary Arc-Induced Degradation of Perovskite Solar Cells

Primary arcing induced by spacecraft charging presents a significant hazard to thin film solar cells if left unchecked. Here, we present the results of a preliminary effort to quantify the impacts of primary arcing to perovskite solar cells. Solar cells operating in a charged environment are susceptible to electrostatic discharges known as arcing. While primary arcs are not generally considered a major concern for traditional space PV, for thin film cells, these can induce significant heating and subsequent damage. We conducted ESD testing in a LEO-like plasma in the National Plasma Interaction Facility at NASA Glenn Research Center to quantify impacts to cell performance by arcing. The perovskites tested saw a decrease of short circuit current with an increased number of arcs, averaging a relative change of 73.89 ± 15.90% after 60 total arcs supplied a cumulative energy dose of 76.12 mJ to the string. Ongoing work entails testing with larger perovskite data sets and expanding to include additional thin film cell technologies to demonstrate the risk unmitigated primary arcing presents.

primary arcing

ITOS Power System Design

A brief description of the ITOS power systems is presented. The descriptions are from viewgraphs shown to the participants of the Workshop. A block diagram of ITOS power supply subsystem is presented along with graphs representing: ITOS voltage limit versus temperature; and battery charge-discharge current profiles over an orbit period.

A F Obenschain

Global Precipitation Measurement (GPM) Spacecraft Lithium Ion Battery Micro-Cycling Investigation

The Global Precipitation Measurement (GPM) spacecraft was jointly developed by NASA and JAXA. It is a Low Earth Orbit (LEO) spacecraft launched on February 27, 2014. The power system is a Direct Energy Transfer (DET) system designed to support 1950 watts orbit average power. The batteries use SONY 18650HC cells and consist of three 8s by 84p batteries operated in parallel as a single battery. During instrument integration with the spacecraft, large current transients were observed in the battery. Investigation into the matter traced the cause to the Dual-Frequency Precipitation Radar (DPR) phased array radar which generates cyclical high rate current transients on the spacecraft power bus. The power system electronics interaction with these transients resulted in the current transients in the battery. An accelerated test program was developed to bound the effect, and to assess the impact to the mission.

Lithium Ion Battery Performance

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

NRHO

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

mission design