SEARCH · Search NASA
Results for “Safety II”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Analyses in Support of Risk-Informed Natural Gas Vehicle Maintenance Facility Codes and Standards: Phase II
Safety standards development for maintenance facilities of liquid and compressed natural gas fueled vehicles is required to ensure proper facility design and operating procedures. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase II work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest using risk ranking. Detailed simulations and modeling were performed to estimate the location and behavior of natural gas releases based on these scenarios. Specific code conflicts were identified, and ineffective code requirements were highlighted and resolutions proposed. These include ventilation rate basis on area or volume, as well as a ceiling offset which seems ineffective at protecting against flammable gas concentrations. ACKNOWLEDGEMENTS The authors gratefully acknowledge Bill Houf (SNL -- Retired) for his assistance with the set-up and post-processing of the numerical simulations. The authors also acknowledge Doug Horne (retired) for his helpful discussions. We would also like to acknowledge the support from the Clean Cities program of DOE's Vehicle Technology Office.
Assessment of Influence of Voids on Phase II Mining Safety at Artemievsk Deposit
Based on the developed parametric model of mined-out area in Artemievsk Mine, parameters and anticipated size of accumulated voids and exposures within the limits of Phase I mining are determined. Stability of underground excavations is estimated by the data of 3D modeling of rock mass stress state. Implementation of recommendations will allow safe completion of Phase I and transition to Phase II mining.
EBR-II Passive Safety Demonstration Tests Benchmark Analyses - Phase 2
Explore the source record for details and available documents.
Benchmark Simulations of the Thermal-Hydraulic Responses during EBR-II Inherent Safety Tests using SAM
An advanced system analysis tool SAM is being developed for fast-running, improved-fidelity, and whole-plant transient analyses at Argonne National Laboratory under DOE-NE’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. As an important part of code development, companion validation activities are being conducted to ensure the performance and validity of the SAM code. This paper presents the benchmark simulations of two EBR-II tests, SHRT-45R and BOP-302R, whose data are available through the support of DOE-NE’s Advanced Reactor Technology (ART) program. The code predictions of major primary coolant system parameter are compared with the test results. Additionally, the SAS4A/SASSYS-1 code simulation results are also included for a code-to-code comparison.
Always look on the bright side of life: Taking a different perspective on cybersecurity performance
This presentation will introduce participants to key mental models on how to think about and understand safety from two of the leading voices in the discipline – Dr. Erik Hollnagel and Dr. Todd Conklin – and from there we ask the simple question of “how can we apply this to cybersecurity?” At the completion of this presentation attendees will be able to describe Dr. Hollnagel’s Safety-II approach and Dr. Conkiln’s definition of safety as “not the absence of accidents but the presence of effective defenses.” They will be able to explain how these ideas translate to the cybersecurity world broadly, and more specifically to operational technology cybersecurity where physical safety consequences are coupled to control system performance. Finally, participants will be able to identify how selected principles from Weick and Sutcliffe’s high reliability organization theory can help operationalize these key mental models around safety, for improved organizational cybersecurity over the long run.
CH Packaging Program Guidance
The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted.
CH Packaging Program Guidance
The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.
CH Packaging Program Guidance
The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.
Design of the NSLS-II Top-Off Safety System
The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently being installed. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations.
Dose Calculations for NSLS-II Beamline Frontend Safety Shutters
Bremsstrahlung is produced in the storage ring by the interaction of the electron beam with residual gas molecules and/or with storage ring components like vacuum chamber, magnet yokes etc. Such interactions are one of the sources of stored beam loss, resulting in beam decay, and occur continuously during storage ring operation. Gas bremsstrahlung interactions take place all around the storage ring, but are a particular problem in the straight sections for the insertion devices.
Estimating burnup uncertainties in KSU TRIGA Mark II reactor and their impact on reactor safety
Not provided.
Benchmark calculations on the phase II problem of uncertainty analyses for criticality safety assessment
The phase II benchmark problem of expert group UACSA includes a configuration of a PWR fuel storage rack and focuses on the uncertainty of criticality from manufacturing tolerance of design parameters such as fuel enrichment, density, diameter, thickness of neutron absorber and structural material, and so on. It provides probability density functions for each design parameter. In this paper, upper limits of k{sub eff} of 95%/95% tolerance with two methods are calculated by sampling design parameters using given probability distributions and compared with the result from traditional approach. (authors)
APPLYING CASCADED PARAMETER SCAN TO STUDY TOP-OFF SAFETY IN NSLS-II STORAGE RING
In this paper we introduce a new algorithm, the cascaded parameter scan method, to efficiently carry out the scan over magnet parameters in the safety analysis for storage ring top-off injection. In top-off safety analysis, one must track particles populating phase space through a beamline containing magnets and apertures and clearly demonstrate that for all possible magnet settings and errors, all particles are lost on scrapers within the properly shielded region. In the usual approach, the number of tracking runs increases exponentially with the number of magnet settings. In the cascaded parameter scan method, the number of tracking runs only increases linearly. This reduction of exponential to linear dependence on the number of set-points, greatly reduces the required computation time and allows one to more densely populate phase space and to increase the number of set-points scanned for each magnet. An example of applying this approach to analyze an NSLS-II beamline, the damping wiggler beamline, is also given.
Theory and Implementation of Nuclear Safety System Codes - Part II: System Code Closure Relations, Validation, and Limitations
This is Part II of two articles describing the details of thermal-hydraulic sys- tem codes. In this second part of the article series, the system code closure relationships (used to model thermal and mechanical non-equilibrium and the coupling of the phases) for the governing equations are discussed and evaluated. These include several thermal and hydraulic models, such as heat transfer coefficients for various flow regimes, two phase pressure correlations, two phase friction correlations, drag coefficients and interfacial models be- tween the fields. These models are often developed from experimental data. The experiment conditions should be understood to evaluate the efficacy of the closure models. Code verification and validation, including Separate Effects Tests (SETs) and Integral effects tests (IETs) is also assessed. It can be shown from the assessments that the test cases cover a significant section of the system code capabilities, but some of the more advanced reactor designs will push the limits of validation for the codes. Lastly, the limitations of the codes are discussed by considering next generation power plants, such as Small Modular Reactors (SMRs), analyz- ing not only existing nuclear power plants, but also next generation nuclear power plants. The nuclear industry is developing new, innovative reactor designs, such as Small Modular Reactors (SMRs), High-Temperature Gas-cooled Reactors (HTGRs) and others. Sub-types of these reactor designs utilize pebbles, prismatic graphite moderators, helical steam generators, in- novative fuel types, and many other design features that may not be fully analyzed by current system codes. This second part completes the series on the comparison and evaluation of the selected reactor system codes by discussing the closure relations, val- idation and limitations. These two articles indicate areas where the models can be improved to adequately address issues with new reactor design and development.
Towards the synthesis of modular process intensification systems with safety and operability considerations - application to heat exchanger network
In this paper, we present a systematic framework for the synthesis of safely operable process intensification systems. Herein, intensified designs are automatically generated by using phenomena-based Generalized Modular Representation Framework, while their safety and operability performances are guaranteed by incorporating: (i) flexibility analysis and multiperiod design, (ii) inherent safety analysis utilizing quantitative risk assessment, and (iii) multi-parametric model predictive control strategies developed via the PAROC framework. As an example from a broader set of intensified systems, the proposed framework is applied to heat exchanger network synthesis for thermal intensification, demonstrating its capability on enhancing safety and operability at early design stage.
Sodium Fast Reactor Safety and Licensing Research Plan – Volume II
Expert panels comprised of subject matter experts identified at the U.S. National Laboratories (SNL, ANL, INL, ORNL, LBL, and BNL), universities (University of Wisconsin and Ohio State University), international agencies (IRSN, CEA, JAEA, KAERI, and JRC-IE) and private consultation companies (Radiation Effects Consulting) were assembled to perform a gap analysis for sodium fast reactor licensing. Expert-opinion elicitation was performed to qualitatively assess the current state of sodium fast reactor technologies. Five independent gap analyses were performed resulting in the following topical reports: (1) Accident Initiators and Sequences (i.e., Initiators/Sequences Technology Gap Analysis), (2) Sodium Technology Phenomena (i.e., Advanced Burner Reactor Sodium Technology Gap Analysis), (3) Fuels and Materials (i.e., Sodium Fast Reactor Fuels and Materials: Research Needs), (4) Source Term Characterization (i.e., Advanced Sodium Fast Reactor Accident Source Terms: Research Needs), and (5) Computer Codes and Models (i.e., Sodium Fast Reactor Gaps Analysis of Computer Codes and Models for Accident Analysis and Reactor Safety). Volume II of the Sodium Research Plan consolidates the five gap analysis reports produced by each expert panel, wherein the importance of the identified phenomena and necessities of further experimental research and code development were addressed. The findings from these five reports comprised the basis for the analysis in Sodium Fast Reactor Research Plan Volume I.