Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduled arrival operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Radiological Recovery Logistics Tool - 20161

Argonne is building and testing a tool, the Radiological Recovery Logistics Tool (RRLT), that can be used during the response and recovery from a radiological or nuclear incident to effectively allocate appropriate commercial and public works equipment to mitigate, remove, and contain radiological contamination. The requirements for this tool - as well as development of the resulting software - is overseen by a steering committee of stakeholders from DHS's National Urban Security Technology Laboratory (NUSTL), the Federal Emergency Management Agency (FEMA), and the Environmental Protection Agency (EPA). One essential requirement is for RRLT to support the efficient and appropriate allocation of resources for a radiological response. Subsequent discussions between ANL and stakeholders have solidified the nature of this support to include identification of the types of resources to be allocated. The study reported in this paper has both factored fundamental concepts and connections out of this identification process and created a Knowledge Base detailing support goals, response scenarios, and efficacy information on dozens of equipment types. In short, RRLT will dynamically apply these findings to situational conditions surrounding contamination incidents. RRLT's Domain, the model of elements, ideas and relationships with which the tool will work, draws concepts from technical reports and stakeholder vocabularies to connect response goals and scenarios to types of equipment that offer utility towards those goals in those scenarios. RRLT's Knowledge Base will contain details on dozens of equipment types and facilitate the operator's discovery and consumption of these details most pertinent to a dynamically selected subset of goals. The core of its Domain Model is based on a report authored by this team. This report [1] contains a comprehensive list of proposed equipment to accomplish various missions or scenarios that might arise after a large-scale radiological contamination incident in an urban environment or critical infrastructure. The report divides potential response and recovery efforts into five support goals: Survey and monitoring of the contaminated area; Mitigation of received dose to first responders: Decontamination (gross and final) of buildings, vehicles, roadways, parks, and other surfaces: Waste management of solid waste generated during recovery operations: and Containment of wastewater and other waste generated during the response and recovery phases. RRLT's development is driven by use cases. A use case is an intention with which a user approaches the software. Use cases are grouped into delivery increments to schedule development, testing, and presentation to stakeholders. This model partitions the system into seven increments: User Arrival and Authentication, Search and Navigation, Equipment Recommendation, Plan Management, Content Management, and Expanded Access. Once a user 15 authenticated, RRLT will present the user with a dashboard that allows them to explore or search RRLT's content. The dashboard will also include a 'Plan' panel for collecting decisions and relevant observations about an incident at hand to facilitate development of an equipment list. RRLT will offer three general modes of access to items in the knowledge base: - Keyword search for direct discovery of items, - Navigation along predetermined paths from recovery goal towards equipment types, and - Interactive guidance towards equipment types by an autonomous software agent: the Equipment Recommendation Wizard. This presentation will detail progress in the development of the RRLT and also discuss opportunities for those interested in providing feedback on its content and functionality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shared automated vehicle fleet operations for first-mile last-mile transit connections with dynamic pooling

Shared automated vehicles (SAVs) have the potential to promote transit ridership by providing efficient first-mile last-mile (FMLM) connections through reduced operational costs to fleet providers and lower out-of-pocket costs to riders. To help plan for a future of integrated mobility, this paper investigates the impacts of SAVs serving FMLM connections, as a mode that provides flexibility in access/egress decisions and is well coordinated with train station schedules. To achieve this objective, a novel dynamic pooling algorithm was introduced to match SAVs with riders while coordinating the riders' arrival times at the light-rail station to a known train schedule. Microsimulations of SAVs and travelers throughout two central Austin neighborhoods show how larger service areas, higher levels of SAV demand, and longer arrival times between successive trains require larger SAV fleet sizes and higher SAV utilization rates to deliver close traveler wait times. Four-person SAVs appear to perform similar to 6-seat SAVs but will cost less to provide. Using a dynamic pooling algorithm tightly coordinated with train arrivals (every 15 min) delivers 87% of travelers to their stations in time to catch the next train, whereas uncoordinated assignments deliver just 58% of travelers in time.

33 ADVANCED PROPULSION SYSTEMS↗

Generic and ML Workloads in an HPC Datacenter: Node Energy, Job Failures, and Node-Job Analysis

HPC datacenters offer a backbone to the modern digital society. Increasingly, they run Machine Learning (ML) jobs next to generic, compute-intensive workloads, supporting science, business, and other decision-making processes. However, understanding how ML jobs impact the operation of HPC datacenters, relative to generic jobs, remains desirable but understudied. In this work, we leverage long-term operational data, collected from a national-scale production HPC datacenter, and statistically compare how ML and generic jobs can impact the performance, failures, resource utilization, and energy consumption of HPC datacenters. Our study provides key insights, e.g., ML-related power usage causes GPU nodes to run into temperature limitations, median/mean runtime and failure rates are higher for ML jobs than for generic jobs, both ML and generic jobs exhibit highly variable arrival processes and resource demands, significant amounts of energy are spent on unsuccessfully terminating jobs, and concurrent jobs tend to terminate in the same state. We open-source our cleaned-up data traces on Zenodo (https://doi. org/10.5281/zenodo.13685426), and provide our analysis toolkit as software hosted on GitHub (https://github.com/atlarge-research/2024-icpads-hpc-workload-characterization). This study offers multiple benefits for data center administrators, who can improve operational efficiency, and for researchers, who can further improve system designs, scheduling techniques, etc.

crossanalysis↗

EVI-EnSitePy (Electric Vehicle Infrastructure – Energy Estimation and Site Optimization Tool in Python) [EVI-X Modeling Suite] [SWR-25-07]

EVI-EnSitePy is a comprehensive agent-based tool designed for the analysis and design of high-power charging sites, encompassing a wide array of site agents including Electric Vehicles (EVs), chargers, energy storage units (ESS), renewable energy resources (DER), and loads. This versatile tool offers diverse functionalities and a modular modeling approach, allowing detailed configuration of agents based on power ratings, port numbers, energy capacities, demand requirements, charger interfaces, and flexibility to customize the tool for project specific goals. By simulating agent interactions and employing various metrics, EVI-EnSitePy enables the assessment of site performance, exploration of energy management systems (EMS), and implementation of innovative EV charging policies. Utilizing EV charge schedules and arrival states, the tool performs thorough charging site simulations, with outputs consisting of agent and site-level power profiles and statistical metrics. Employing a tree graph structure, EVI-EnSitePy supports nested site structures and power distribution modeling. The tool's ability to generate charging schedules deterministically or via stochastic analysis further enhances its versatility. Through its features and capabilities, EVI-EnSitePy offers a powerful platform for informed decision-making in the realm of high-power charging site design and operation.

Jackson, Derek [National Renewable Energy Laborato↗

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer↗

Fleet-wide Electrification Impacts Assessment for the Valley Transportation Authority

This report explores the long-term electrification opportunities for the Valley Transit Authority’s (VTA) transit bus fleet. The potential for transit bus electrification at VTA as well as the economic impacts of partial and complete electrification are explored. We use the Revenue Operation and Device Optimization model to determine the optimal charging, operation and lowest capital and operating cost solution to achieve different levels of electrification to meet their existing routes. This study finds that, relying on only depot charging, around 70% of the daily trips by VTA’s transit bus fleet can be replaced with battery electric buses (BEBs) today. The benefits and drawbacks of five methods for improving the electrification potential beyond that achievable with only depot charging are discussed including (1) increase charger power, (2) purchase of larger vehicle batteries, (3) en-route charging, (4) purchasing additional buses and swapping them to enable the existing routes/blocks1 to be met, and (5) route/block redesign. A strategy is developed to enable full fleet electrification by increasing charger power or allowing intraday charging as a proxy for the options mentioned above. This method allows us to develop an understanding of the impacts and trade-offs of full fleet electrification. Two charging strategies are examined. Immediate charging, when the bus is charged as soon as it arrives at a depot or en-route charging station, and smart charging, which uses a controller to determine the best times to charge to achieve the lowest charging cost, while maintaining the same trip schedules. Smart charging is effective at reducing the peak power consumption, which can be reduced by between 31% and 65% compared to immediate charging. This translates directly to lower electricity demand charges and lower costs for possible distribution system upgrades. The total lifetime net present value (NPV) costs for different scenarios are presented in Figure ES-1. Scenarios are separated into three sections. The first stacked bar on the left is the base case (business-as-usual) where all buses are diesel hybrids, the next four bars include partial and full fleet electrification utilizing only immediate charging, and the last four bars include partial and full fleet electrification utilizing smart charging. The results show that smart charging scenarios are within ±4% of the lifetime NPV cost of the diesel-hybrid only (business-as-usual) scenario. The scenarios with full fleet electrification (i.e., including intraday charging) are 4% lower cost and those with partial fleet electrification (i.e., without intraday charging) are 2%–3% higher. However, it is important to note that the intraday charging scenarios do not include any additional costs for the equipment necessary to achieve intraday charging (e.g., additional chargers, larger batteries, new route design). Additionally, it is worth noting that the Low Carbon Fuel Standard (LCFS) credit received for implementing electric buses is essential to achieving these results.

33 ADVANCED PROPULSION SYSTEMS↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗