An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

Moore, J. E.

Are accidents scheduled

Two major sets of safety problems associated with project scheduling are examined. The first set involves problems resulting from the improper scheduling of the safety tasks. The second involves problems which result from inadequate attention to scheduling of those project tasks which lead to tests and operations and includes condensed schedules, modified schedules, schedule workarounds, eliminated portions of the schedules and strung out schedules.

Childs, C.

Scheduler software for tracking and data relay satellite system loading analysis: User manual and programmer guide

A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.

Craft, R.

User requirements for a patient scheduling system

A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.

Zimmerman, W.

Aspects of job scheduling

A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

Phillips, K.

An assessment of PERT as a technique for schedule planning and control

The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

Sibbers, C. W.

User Interface Issues in Supporting Human-Computer Integrated Scheduling

A major problem in designing user interfaces for scheduling systems is one of allowing the human to become an integral part of the system. The human role in scheduling extends beyond the simple tasks of providing the input and accepting the output. Because of the inherent intractability of most real-world scheduling problems, intelligence must be incorporated into the scheduling process in order to reach an acceptable solution in a reasonable amount of time. Artificial Intelligence research has concentrated on identifying algorithms and heuristics for this purpose. However, interfaces which allow the scheduler to take advantage of human intelligence and allow the user insight into and influence over the planning process are also needed.

Lynne P Cooper

An Intelligent Value-Driven Scheduling System for Space Station Freedom With Special Emphasis on the Electric Power System

This paper discusses the Electric Power Control System (EPCS) created by Decision-Science Applications, Inc. (DSA) for Lewis Research Center (LeRC). This system in its current form makes decisions on what to schedule and when to schedule it, including making choices among various options or ways of performing a task. The system is goal directed and seeks to shape resource usage in an optimal manner using a value-driven approach. The paper discusses the considerations governing what makes a "good" schedule; how to design a value function to find the best schedule; and how to design the algorithm which finds the schedule that maximizes this value function. Results are shown which demonstrate the usefulness of the techniques employed. The value-driven approach also allows for the system to be easily extended to an emergency response system, making decisions as to where to best cut power when warranted.

Joseph C Krupp

Deep RL for Fast Long-Horizon Operations Scheduling on NASA's Carruthers Geocorona Observatory Mission

Spacecraft operations scheduling is a highly constrained, long-horizon combinatorial optimization problem that traditionally relies on heuristics, constraint programming, or manual planning. We present a scalable deep reinforcement learning framework developed and deployed for NASA’s Carruthers Geocorona Observatory mission. Our framework introduces a macro-action abstraction known as activity blocks coupled with dynamic action-masking to navigate the intractably large search space and strictly enforce complex power, thermal, and instrument constraints. The resulting architecture generates globally feasible schedules with overwhelming probability, establishes operational trust, and executes a full training cycle in under six hours, circumventing the need for policy robustness by enabling rapid, on-demand retraining. Further, resulting schedules outperform baseline heuristics in scheduled science quality. The deep reinforcement learning framework was deployed as the default operational scheduler for the Carruthers Geocorona Observatory mission from the outset of the mission, demonstrating that deep reinforcement learning can be trusted for real spacecraft operations under complex, evolving constraints.

Geocorona

System/360 Computer Assisted Network Scheduling (CANS) System

Computer assisted scheduling techniques that produce conflict-free and efficient schedules have been developed and implemented to meet needs of the Manned Space Flight Network. CANS system provides effective management of resources in complex scheduling environment. System is automated resource scheduling, controlling, planning, information storage and retrieval tool.

Brewer, A. C.

A computer method for schedule processing and quick-time updating.

A schedule analysis program is presented which can be used to process any schedule with continuous flow and with no loops. Although generally thought of as a management tool, it has applicability to such extremes as music composition and computer program efficiency analysis. Other possibilities for its use include the determination of electrical power usage during some operation such as spacecraft checkout, and the determination of impact envelopes for the purpose of scheduling payloads in launch processing. At the core of the described computer method is an algorithm which computes the position of each activity bar on the output waterfall chart. The algorithm is basically a maximal-path computation which gives to each node in the schedule network the maximal path from the initial node to the given node.

Mccoy, W. H.

Modification and updating of the Manned Activity Scheduling System (MASS) for shuttle and shuttle payloads analysis. Volume 2: Space shuttle sortie payload analysis

Space shuttle operations include a significant number of launches with a sortie laboratory serving as a facility for manned experimentation in space. Planning a program of space experiments for a facility of this type requires that both the composition of the laboratory payload and the schedule of experiment operations for each payload be carefully selected. Experiment operations are investigated using the manned activity scheduling system (MASS). Schedules provided by these models assist in selecting experiment groups that efficiently use the laboratory resources and yield the desired experiment accomplishment at the program level. An alternate use of the MASS models provides for establishing the time-dependent supporting resources required for a specified candidate payload. A procedure for defining and analyzing shuttle sortie payloads was developed. This procedure was then applied to the definition of mixed-discipline experiment payloads for an advanced technology laboratory (ATL) supported by two-and three-man crews. The ATL payloads, including schedules of experiment operations, were defined to realize a high percentage of experiment accomplishment. The study considers the sensitivity of experiment accomplishment rate to variations of system parameters such as crew cross training, crew operations, shuttle and laboratory resources, ground target systems, and operational orbits.

Huyett, R. C.

Behavioral regulation of gravity - Schedule effects under escape-avoidance procedures

Squirrel monkeys were restrained in a centrifuge capsule and trained to escape and avoid increases in artificial gravity. During escape-avoidance, lever responses reduced centrifugally simulated gravity or postponed scheduled increases. The effect of variation in the interval of postponement (equal to the duration of decrease produced by escape responses) was studied under a multiple schedule of four components. Three components were gravity escape-avoidance with postponement times of 20, 40, and 60 sec. The fourth component was extinction. Each component was associated with a different auditory stimulus. Rate of responding decreased with increasing postponement time and higher mean g-levels occurred at shorter intervals of postponement. Effects of the schedule parameter on response rate and mean g-level were similar to effects of the schedule on free-operant avoidance and on titration behavior maintained by shock.

Clark, F. C.

Payload crew training scheduler (PACTS) user's manual

The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

Shipman, D. L.

DSN scheduling system

The Deep Space Network (DSN) Scheduling Group provides the operationally oriented administrative support necessary for the effective scheduling of the DSN. The scheduling system plus the levels of schedules are explained.

Dorham, R.