Search NASA⌕ Search

SEARCH · Search NASA

Results for “Sewage Lagoon”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Water hyacinths for upgrading sewage lagoons to meet advanced wastewater treatment standards, part 2

Field tests using water hyacinths as biological filtration agents were conducted in the Mississippi gulf coast region. The plants were installed in one single cell and one multiple cell sewage lagoon systems. Water hyacinths demonstrated the ability to maintain BOD5 and total suspended solid (TSS) levels within the Environmental Protection Agency's prescribed limits of 30 mg/lBOD5 and 30 mg/l TSS. A multiple cell sewage lagoon system consisting of two aerated and one water hyacinth covered cell connected in series demonstrated the ability to maintain BOD5 and TSS levels below 30 mg/l year-round. A water hyacinth covered lagoon with a surface area of 0.28 hectare containing a total volume of 6.8 million liters demonstrated the capacity to treat 437,000 to 1,893,000 liters of sewage influent from 2.65 hectares of aerated lagoons daily and produce an effluent that met or exceeded standards year-round.

Wolverton, B. C.↗

Water Hyacinths for Upgrading Sewage Lagoons to Meet Advanced Wastewater Treatment Standards, Part 1

Water hyacinths, Eichhornia crassipes Mart. Solms, have demonstrated the ability to function as an efficient and inexpensive final filtration system in a secondary domestic sewage lagoon during a three month test period. These plants reduced the suspended solids, biochemical oxygen demanding substances, and other chemical parameters to levels below the standards set by the state pollution control agency. The water hyacinth-covered secondary lagoon utilized in this experiment had a surface area of 0.28 hectare (0.70 acre) with a total capacity of 6.8 million liters (1.5 million gallons), receiving an inflow of 522,100 liters (115,000 gallons) per day from a 1.1 hectare (3.8 acre) aerated primary sewage lagoon. These conditions allowed a retention time of 14 to 21 days depending on the water hyacinth evapotranspiration rates. The desired purity of final sewage effluent can be controlled by the water hyacinth surface area, harvest rate, and the retention time.

Wolverton, B. C.↗

Lagoon Seepage Testing Plan for the Specific Manufacturing Capability (SMC) Complex Sewage Lagoons at Idaho National Laboratory, Butte County, Idaho

Battelle Energy Alliance, LLC (BEA) operates the Specific Manufacturing Capability (SMC) Complex located in Butte County, Idaho at Idaho National Laboratory (INL). The SMC Complex has an existing wastewater system to collect and treat sanitary wastewater and boiler condensate water from the facility. The existing treatment facility consists of three cells: Cell #1 has a surface area of 1.6 acres, Cell #2 has a surface area of 3.2 acres, and Cell #3 has a surface area of 1.6 acres. If the three existing cells are to ever reach capacity, there is a stub out to the northeast for future expansion of the lagoons. The Lagoons were installed in 1994, and were last tested in 2009. All three cells were within the acceptable limit, which at the time was one-quarter inch per day or less. The Idaho Department of Environmental Quality (IDEQ) is requiring that the seepage tests at SMC be repeated every 10 years.

99 GENERAL AND MISCELLANEOUS↗

Lagoon Seepage Testing Report for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory, Butte County, Idaho

J-U-B ENGINEERS, Inc. (J-U-B) performed seepage tests on the CFA Wastewater Lagoons 1, 2, and 3 between August 26th and September 22nd, 2014. The lagoons were tested to satisfy the Idaho Department of Environmental Quality (DEQ) Rules (IDAPA 58.01.16) that require all lagoons be tested at a frequency of every 10 years and the Compliance Activity CA-141-03 in the DEQ Wastewater Reuse Permit for the CFA Sewage Treatment Plant (LA-000141-03). The lagoons were tested to determine if the average seepage rates are less than 0.25 in/day, the maximum seepage rate allowed for lagoons built prior to April 15, 2007. The average seepage rates were estimated for each lagoon and are given in Table-ES1. The average seepage rates for Lagoons 1 and 2 are less than the allowable seepage rate of 0.25 in/day. Lagoon 1 and 2 passed the seepage test and will not have to be tested again until the year 20241. However, the average seepage rate for Lagoon 3 appears to exceed the allowable seepage rate of 0.25 in/day which means the potential source for the excessive leakage should be investigated further.

99 GENERAL AND MISCELLANEOUS↗

Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014

The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

99 GENERAL AND MISCELLANEOUS↗

Central Facilities Area Sewage Lagoon Evaluation

The Central Facilities Area (CFA), located in Butte County, Idaho, at the Idaho National Laboratory has an existing wastewater system to collect and treat sanitary wastewater and non-contact cooling water from the facility. The existing treatment facility consists of three cells: Cell #1 has a surface area of 1.7 acres, Cell #2 has a surface area of 10.3 acres, and Cell #3 has a surface area of 0.5 acres. If flows exceed the evaporative capacity of the cells, wastewater is discharged to a 73.5-acre land application site that uses a center-pivot irrigation sprinkler system. As flows at CFA have decreased in recent years, the amount of wastewater discharged to the land application site has decreased from 13.64 million gallons in 2004 to no discharge in 2012 and 2013. In addition to the decreasing need for land application, approximately 7.7 MG of supplemental water was added to the system in 2013 to maintain a water level and prevent the clay soil liners in the cells from drying out and “cracking.” The Idaho National Laboratory is concerned that the sewage lagoons and land application site may be oversized for current and future flows. A further concern is the sustainability of the large volumes of supplemental water that are added to the system according to current operational practices. Therefore, this study was initiated to evaluate the system capacity, operational practices, and potential improvement alternatives, as warranted.

99 GENERAL AND MISCELLANEOUS↗

Advanced Test Reactor Complex Sewage Lagoon Evalua

The Advanced Test Reactor (ATR) Complex located in Butte County, Idaho at the Idaho National Laboratory (INL) has an existing evaporative wastewater system to collect and treat sanitary wastewater from the facility. The existing system includes two cells, Cell #1 has a surface area of 2.9 acres and Cell #2 has a surface area of 13.8 acres. Cell #1 incorporates a soil liner system and Cell #2 includes both a PVC geomembrane and a soil liner. In 2010, both cells were tested in accordance with Idaho Department of Environmental Quality requirements and measured seepage was within acceptable limits.

99 GENERAL AND MISCELLANEOUS↗

Addendum to the Closure Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, Revision 1

This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

Central Facilities Area Sewage Lagoon Evaluation

The Central Facilities Area (CFA) located in Butte County, Idaho at Idaho National Laboratory (INL) has an existing wastewater system to collect and treat sanitary wastewater and non contact cooling water from the facility. The existing treatment facility consists of three cells: Cell 1 has a surface area of 1.7 acres, Cell 2 has a surface area of 10.3 acres, and Cell 3 has a surface area of 0.5 acres. If flows exceed the evaporative capacity of the cells, wastewater is discharged to a 73.5 acre land application site that utilizes a center pivot irrigation sprinkler system. The purpose of this current study is to update the analysis and conclusions of the December 2013 study. In this current study, the new seepage rate and influent flow rate data have been used to update the calculations, model, and analysis.

42 ENGINEERING↗

Wastewater Treatment: The Natural Way

Wolverton Environmental Services, Inc. is widely acclaimed for innovative work in natural water purification which involves use of aquatic plants to remove pollutants from wastewater at a relatively low-cost. Haughton, Louisiana, visited Wolverton's artificial marsh test site and decided to use this method of wastewater treatment. They built an 11 acre sewage lagoon with a 70 by 900 foot artificial marsh called a vascular aquatic plant microbial filter cell. In the cell, microorganisms and rooted aquatic plants combine to absorb and digest wastewater pollutants, thereby converting sewage to relatively clean water. Raw waste water, after a period in the sewage lagoon, flows over a rock bed populated by microbes that digest nutrients and minerals from the sewage thus partially cleaning it. Additional treatment is provided by the aquatic plants growing in the rock bed, which absorb more of the pollutants and help deodorize the sewage.

Source record↗

Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compiled data on the vascular aquatic plant program, 1975 - 1977

The performance of a single cell, facultative sewage lagoon was significantly improved with the introduction of vascular aquatic plants. Water hyacinth (Eichhornia crassipes) was the dominant plant from April to November; duckweed (Lemna spp.) and (Spirodela spp.) flourished from December to March. This 2 ha lagoon received approximately 475 cu m/day of untreated sewage and has a variable COD sub 5 loading rate of 22-30 kg/ha/day. During the first 14 months of operation with aquatic plants, the average influent BOD sub 5 was reduced by 95% from 110 mg/l to an average of 5 mg/l in the effluent. The average influent suspended solids were reduced by 90% from 97 mg/l to 10 mg/l in the effluent. Significant reductions in nitrogen and phosphorus were effected. The monthly kjeldahl nitrogen for influent and effluent averaged 12.0 and 3.4 mg/l, respectively, a reduction of 72%. The total phosphorus was reduced on an average of 56% from 3.7 mg/l influent to 1.6 mg/l effluent.

Wolverton, B. C.↗

Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report to Address Comments on the Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada, Revision 0, March 2008

The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closure documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

Because of significantly reduced wastewater discharges to the Central Facilities Area Sewage Treatment Plant, wastewater has not been land applied since 2011. The future need to land apply wastewater was evaluated. Based on the current wastewater flows into the Central Facilities Area Sewage Treatment Plant, expected future missions at Central Facilities Area, and the discovery in 2014 that Lagoon 3 was leaking at an unacceptable rate, it was determined that the Central Facilities Area Sewage Treatment Plant is significantly oversized and that Lagoons 1 and 2 could be converted to total evaporation lagoons. Therefore, the decision was made to remove the existing sludge in Lagoon 3 and transfer it to Lagoon 2 for additional treatment, decommission Lagoon 3 and the land application area, and terminate the wastewater reuse permit. A closure plan was submitted and approved by the Idaho Department of Environmental Quality in 2016. This report describes the closure activities that were performed. Closure activities included: • Characterizing the soil/liner in Lagoon 3 to determine whether further characterization and/or remediation will be required under the Comprehensive Environmental Response, Compensation, and Liability Act. • Based on the results from the soil/liner sampling, determining whether additional sampling will be required for the land application area. • Removing the sludge in Lagoon 3 and placing it in Lagoon 2. • Puncturing the Lagoon 3 soil/liner to prevent ponding of storm water and becoming a source for vectors. • Installing a permanent cap on the inlet piping to Lagoon 3. Samples were collected on November 10, 2016, and were submitted for analysis to an off-site laboratory. Data validation and evaluation were performed by Portage, INC. Sample results confirmed that there is no hazard to human health and the environment and that Lagoon 3 and the land application area could be closed. In August 2017, sludge was removed from Lagoon 3 and placed in Lagoon 2, the soil/liner was punctured in 4 places, and caps were installed on the primary and bypass inlet lines.

99 GENERAL AND MISCELLANEOUS↗

Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INL Assessment of PNNL Water Conservation Study for the ATR Complex

To support the implementation of the U.S. Department of Energy (DOE) Strategic Sustainability Performance Plan (SSPP), the DOE Sustainability Performance Office (SPO) sponsored three comprehensive water assessments performed by Pacific Northwest National Laboratory (PNNL) in their 2012 report. As DOE’s third largest water user, Idaho National Laboratory (INL) was one of the selected assessment sites.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Aquatic Plants and Wastewater Treatment (an Overview)

The technology for using water hyacinth to upgrade domestic sewage effluent from lagoons and other wastewater treatment facilities to secondary and advanced secondary standards has been sufficiently developed to be used where the climate is warm year round. The technology of using emergent plants such as bulrush combined with duckweed is also sufficiently developed to make this a viable wastewater treatment alternative. This system is suited for both temperate and semi-tropical areas found throughout most of the U.S. The newest technology in artificial marsh wastewater treatment involves the use of emergent plant roots in conjunction with high surface area rock filters. Smaller land areas are required for these systems because of the increased concentration of microorganisms associated with the rock and plant root surfaces. Approximately 75 percent less land area is required for the plant-rock system than is required for a strict artificial wetland to achieve the same level of treatment.

Wolverton, B. C.↗