Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

2026 Site Development Plan

The 2026 edition of the Site Development Plan focuses on 30 years of infrastructure plans as they strengthen the core Science, Technology, and Engineering (ST&E) pillars of Lawrence Livermore National Laboratory (LLNL): High-Energy-Density (HED) Science, Advanced Materials and Manufacturing (AMM), and High Performance Computing (HPC).

Tran, Lucas [Lawrence Livermore National Laborator↗

Truncated Dual-Cap Nucleation Site Development

During heterogeneous nucleation within a metastable mushy-zone, several geometries for nucleation site development must be considered. Traditional spherical dual cap and crevice models are compared to a truncated dual cap to determine the activation energy and critical cluster growth kinetics in ternary Fe-Cr-Ni steel alloys. Results of activation energy results indicate that nucleation is more probable at grain boundaries within the solid than at the solid-liquid interface.

Matson, Douglas M.↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Web Site Development Support

This summer I assisted the RPT Program Office in developing a design plan to update their existing website to current NASA web standards. The finished website is intended for the general public, specifically potential customers interested in learning about NASA's chemical rocket test facility capabilities and test assignment process. The goal of the website is to give the public insight about the purpose and function of the RPT Program. Working on this project gave me the opportunity to learn skills necessary for effective project management. The RPT Program Office manages numerous facilities so they are required to travel often to other sites for meetings throughout the year. Maneuvering around the travel schedule of the office and the workload priority of the IT Department proved to be quite the challenge. I overcame the travel schedule of the office by frequently communicating and checking in with my mentor via email and telephone.

Abdul, Hameed↗

Southwest Wind Power R&D Test Site Development at the National Wind Technology Center (CRADA CRD-12-00472 Final Report)

Southwest Windpower, Inc. (SWWP) has been designing and distributing small wind turbines for more than 22 years and is the recognized global leader in the design, manufacturing and distribution of small wind systems (400-3000 watts). The company has been a pioneer in the development of wind technology and has built and shipped more than 170,000 wind turbines to over 120 countries worldwide. Headquartered in Flagstaff AZ, SWWP has sales representatives in over 88 countries. Applications for SWWP systems include residential homes, commercial properties, micro grids, remote cabins, telecom transmitters, offshore platforms, water pumping and sailboats. In addition, U.S. Department of Defense uses SWWP’s products in Forward Operating Bases (FOB’s), USGS uses them for remote monitoring of glacier movements and the CIA uses them to provide power seismic monitoring. Today, SWWP plans development of new technologies to address distributed energy market needs and become even more aggressive in international markets. This strategy includes extensive Research, Development, Demonstration & Deployment (RDD&D) activities to improve existing production line into more simple, reliable, and cost-effective wind turbine systems. Important part of such activities is the field testing of the new systems, which should provide: (i) validation of the reliable operation of hardware and software; (ii) validation of numerical models of the system and its components; (iii) field comparison of various control and optimization strategies; (iv) customized reliability testing; (v) customized monitoring and analysis testing; and (vi) IEC certification testing (vii) filed demonstration of system performance and reliability. Such field testing facility should encompass multiple towers and appropriate data acquisition systems. SWWP is exploring to move part of the engineering department to Colorado, and execute its RDD&D strategies in this new location. Partnership with NREL will provide great insights into SWWP’s RDD&D processes and more efficient commercialization by utilizing NWTC as the field testing site, and working close with NREL personnel. NWTC is ideally suited to strain the design. NREL is very experienced with customized and IEC testing. During this project, Southwest Windpower aims to improve the value proposition of distributed renewable energy, and make it a competitive choice in the energy markets. As of today, more then 170,000 small wind turbines, manufactured in the U.S., are installed in more then 180 countries. With the improved value proposition, Southwest Windpower wants to create and address new market needs, substantially increase its sales domestically and internationally, which should have positive impact on the creation of American jobs, competitiveness of U.S. economy, export or U.S. products, and the use of renewable energy.

17 WIND ENERGY↗

A Lake Biogeochemistry Model for Global Methane Emissions: Model Development, Site‐Level Validation, and Global Applicability

Abstract Lakes are important sentinels of climate change and may contribute over 30% of natural methane (CH 4 ) emissions; however, no earth system model (ESM) has represented lake CH 4 dynamics. To fill this gap, we refined a process‐based lake biogeochemical model to simulate global lake CH 4 emissions, including representation of lake bathymetry, oxic methane production (OMP), the effect of water level on ebullition, new non‐linear CH 4 oxidation kinetics, and the coupling of sediment carbon pools with in‐lake primary production and terrigenous carbon loadings. We compiled a lake CH 4 data set for model validation. The model shows promising performance in capturing the seasonal and inter‐annual variabilities of CH 4 emissions at 10 representative lakes for different lake types and the variations in mean annual CH 4 emissions among 106 lakes across the globe. The model reproduces the variations of the observed surface CH 4 diffusion and ebullition along the gradients of lake latitude, depth, and surface area. The results suggest that OMP could play an important role in surface CH 4 diffusion, and its relative importance is higher in less productive and/or deeper lakes. The model performance is improved for capturing CH 4 outgassing events in non‐floodplain lakes and the seasonal variability of CH 4 ebullition in floodplain lakes by representing the effect of water level on ebullition. The model can be integrated into ESMs to constrain global lake CH 4 emissions and climate‐CH 4 feedback.

54 ENVIRONMENTAL SCIENCES↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Challenges of designing, operating, and managing brine extraction at a carbon dioxide storage site

Developing and deploying commercial-scale carbon dioxide (CO 2 ) storage at a site requires operational strategies to manage pressure and CO 2 plume distribution. In the natural gas storage and oil and gas industries, fluid extraction has been successfully implemented as a strategy to manage pressure and control fluid distribution (i.e., hydrocarbon recovery and natural gas storage efficiency, respectively). The technical challenges of integrating brine extraction at CO 2 storage sites are expected to be similar, if not identical, to those in the natural gas storage and petroleum industries. Major technical challenges of using brine extraction to manage storage in a storage unit include (1) designing and completing the brine extraction wells, (2) locating the brine extraction well, (3) assessing the efficacy of brine extraction, and (4) handling the extracted brine. The design and completion of the brine extraction well include the well type (i.e., vertical or horizontal) and perforated interval. The location of the well is influenced by the timing of extraction operations (i.e., prior or after CO 2 injection starts) and project objectives (i.e., desired directional movement of the CO 2 plume and avoid or minimize CO 2 extraction). The efficacy of brine extraction requires a baseline projection of the pressure and CO 2 plume distribution. Options for handling extracted brine include subsurface disposal, surface disposal, and industrial use. Here this paper addresses means of overcoming technical challenges that may likely be encountered before or after CO 2 injection starts.

25 ENERGY STORAGE↗

Epidemiological Investigation of a Mortality Event in a Translocated Gopher Tortoise (Gopherus polyphemus) Population in Northwest Florida

Nokuse Plantation, a 22,055 ha private conservation preserve in northwest Florida, is a recipient site for gopher tortoises translocated from development sites in Florida. Since 2006, Nokuse has received over 5,000 tortoises from multiple development sites. During 2013–2015, 52 tortoises were found sick (n = 14) or dead (n = 38) in multiple soft-release enclosures in which tortoises consistently exhibited clinical signs, with additional sick (n = 5) and dead (n = 5) tortoises presenting similarly during 2016–2017. When found alive, tortoises behaved abnormally (e.g., frequently out of burrows during cold weather, pacing along enclosure fencing), appeared emaciated, were lethargic, and had developed redness under plastron scutes. Similar numbers of male (n = 28) and female (n = 32) tortoises were recovered along with two of unidentified sex, including mainly adults (n = 59) and three subadults. Physical examination, blood analysis, and other diagnostics were indicative of starvation and dehydration. Most sick tortoises provided with supportive care recovered. Necropsy findings generally confirmed starvation, with no evidence of infectious pathogens or contaminants. There were no apparent differences in quality of habitat, plant community, or soil or water among affected and unaffected enclosures. Botanical surveys indicated adequate forage quality and quantity, with no poisonous exotic or native plants detected. No land management practices changed prior to this event. Analysis of epidemiological data and demographic factors from before and during this mortality event identified initial density of tortoises in the enclosures as exerting the strongest influence on detection of tortoise morbidity and mortality. We believe that the stress associated with mixing tortoises from different populations and at higher densities during translocation impacted an individual tortoise’s ability to obtain or absorb adequate nutrients from foraging, ultimately leading to a wasting condition consistent with starvation. Based on our findings, we recommend a maximum of 3 gopher tortoises per ha in soft-release enclosures for translocation, but further research is warranted to investigate the complexity of stress and social pressures associated with translocation.

59 BASIC BIOLOGICAL SCIENCES↗

Ohio River main stem study - The role of geographic information systems and remote sensing in flood damage assessments

The Pittsburgh District, Corps of Engineers, has conducted feasibility analyses of various procedures for performing flood damage assessments along the main stem of the Ohio River. Procedures using traditional, although highly automated, techniques and those based on geographic information systems have been evaluated at a test site, the City of New Martinsville, Wetzel County, WV. The flood damage assessments of the test site developed from an automated, conventional structure-by-structure appraisal served as the ground truth data set. A geographic information system was developed for the test site which includes data on hydraulic reach, ground and reference flood elevations, and land use/cover. Damage assessments were made using land use mapping developed from an exhaustive field inspection of each tax parcel. This ground truth condition was considered to provide the best comparison of flood damages to the conventional approach. Also, four land use/cover data sets were developed from Thematic Mapper Simulator (TMS) and Landsat-4 Thematic Mapper (TM) data. One of these was also used to develop a damage assessment of the test site. This paper presents the comparative absolute and relative accuracies of land use/cover mapping and flood damage assessments, and the recommended role of geographic information systems aided by remote sensing for conducting flood damage assessments and updates along the main stem of the Ohio River.

Edwardo, H. A.↗

Oak Ridge National Laboratory 2025 Site Sustainability Plan With FY 2024 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Office (SPO) issues instruction documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPO is part of the DOE Office of Asset Management. As required by DOE Order 436.1A, Departmental Sustainability, each site develops and commits to an annual site sustainability plan (SSP) that identifies its respective contribution toward meeting DOE’s sustainability goals. SPO collects and compiles information reported by each site to develop an agency-wide sustainability report and implementation plan, which are used to report DOE sustainability progress to the federal government as required by all major federal agencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-resolution Hindcasts for U.S. Wave Energy Resource Characterization

The marine and hydrokinetic (MHK) industry is at an early stage of development and has the potential to play a significant role in diversifying the U.S. energy portfolio and reducing the U.S. carbon footprint. Wave energy is the largest among all the U.S. MHK energy resources, which include wave energy, ocean current, tidal-instream, ocean thermal energy conversion, and river-instream. Wave resource characterization is an essential step for regional wave energy assessments, Wave Energy Converter (WEC) project development, site selection and WEC design. The present paper provides an overview of a joint modelling effort by the Pacific Northwest National Laboratory and Sandia National Laboratories on high-resolution wave hindcasts to support the U.S. Department of Energy’s Water Power Technologies Office’s program of wave resource characterization, assessment and classifications in all US coastal regions. Topics covered include the modelling approach, model input requirements, model validation strategies, high performance computing resource requirements, model outputs and data management strategies. Examples of model setup and validation for different regions are provided along with application to development of classification systems, and analysis of regional wave climates. Lessons learned and technical challenges of the long-term, high-resolution regional wave hindcast are discussed.

Yang, Zhaoqing↗

Network Extender for MIL-STD-1553 Bus

An extender system for MIL-STD-1553 buses transparently couples bus components at multiple developer sites. The bus network extender is a relatively inexpensive system that minimizes the time and cost of integration of avionic systems by providing a convenient mechanism for early testing without the need to transport the usual test equipment and personnel to an integration facility. This bus network extender can thus alleviate overloading of the test facility while enabling the detection of interface problems that can occur during the integration of avionic systems. With this bus extender in place, developers can correct and adjust their own hardware and software before products leave a development site. Currently resident at Johnson Space Center, the bus network extender is used to test the functionality of equipment that, although remotely located, is connected through a MILSTD- 1553 bus. Inasmuch as the standard bus protocol for avionic equipment is that of MIL-STD-1553, companies that supply MIL-STD-1553-compliant equipment to government or industry and that need long-distance communication support might benefit from this network bus extender

Marcus, Julius↗

Quantifying the Effect of Economic Development Zones on Electrical Load Growth in Kentucky [Slides]

The Kentucky Energy and Environment Cabinet has recently undertaken a comprehensive effort to map and catalog potential economic development sites across the state. The purpose of this technical assistance is to quantify the potential impact of developing designated sites on Kentucky's electricity load growth, providing insights at both state and county level considering the next 10 years. This analysis should explicitly incorporate and address key project uncertainties by developing various load growth scenarios that account for development scale, site specificity, and sector variability. The need for a site-specific analysis comes from the understanding that conventional econometric (top-down) load forecasting models cannot sufficiently isolate or predict the discrete load increases resulting from the development of these unique and targeted economic sites.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗