Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

2026 Site Development Plan

The 2026 edition of the Site Development Plan focuses on 30 years of infrastructure plans as they strengthen the core Science, Technology, and Engineering (ST&E) pillars of Lawrence Livermore National Laboratory (LLNL): High-Energy-Density (HED) Science, Advanced Materials and Manufacturing (AMM), and High Performance Computing (HPC).

Tran, Lucas [Lawrence Livermore National Laborator↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Southwest Wind Power R&D Test Site Development at the National Wind Technology Center (CRADA CRD-12-00472 Final Report)

Southwest Windpower, Inc. (SWWP) has been designing and distributing small wind turbines for more than 22 years and is the recognized global leader in the design, manufacturing and distribution of small wind systems (400-3000 watts). The company has been a pioneer in the development of wind technology and has built and shipped more than 170,000 wind turbines to over 120 countries worldwide. Headquartered in Flagstaff AZ, SWWP has sales representatives in over 88 countries. Applications for SWWP systems include residential homes, commercial properties, micro grids, remote cabins, telecom transmitters, offshore platforms, water pumping and sailboats. In addition, U.S. Department of Defense uses SWWP’s products in Forward Operating Bases (FOB’s), USGS uses them for remote monitoring of glacier movements and the CIA uses them to provide power seismic monitoring. Today, SWWP plans development of new technologies to address distributed energy market needs and become even more aggressive in international markets. This strategy includes extensive Research, Development, Demonstration & Deployment (RDD&D) activities to improve existing production line into more simple, reliable, and cost-effective wind turbine systems. Important part of such activities is the field testing of the new systems, which should provide: (i) validation of the reliable operation of hardware and software; (ii) validation of numerical models of the system and its components; (iii) field comparison of various control and optimization strategies; (iv) customized reliability testing; (v) customized monitoring and analysis testing; and (vi) IEC certification testing (vii) filed demonstration of system performance and reliability. Such field testing facility should encompass multiple towers and appropriate data acquisition systems. SWWP is exploring to move part of the engineering department to Colorado, and execute its RDD&D strategies in this new location. Partnership with NREL will provide great insights into SWWP’s RDD&D processes and more efficient commercialization by utilizing NWTC as the field testing site, and working close with NREL personnel. NWTC is ideally suited to strain the design. NREL is very experienced with customized and IEC testing. During this project, Southwest Windpower aims to improve the value proposition of distributed renewable energy, and make it a competitive choice in the energy markets. As of today, more then 170,000 small wind turbines, manufactured in the U.S., are installed in more then 180 countries. With the improved value proposition, Southwest Windpower wants to create and address new market needs, substantially increase its sales domestically and internationally, which should have positive impact on the creation of American jobs, competitiveness of U.S. economy, export or U.S. products, and the use of renewable energy.

17 WIND ENERGY↗

A Lake Biogeochemistry Model for Global Methane Emissions: Model Development, Site‐Level Validation, and Global Applicability

Abstract Lakes are important sentinels of climate change and may contribute over 30% of natural methane (CH 4 ) emissions; however, no earth system model (ESM) has represented lake CH 4 dynamics. To fill this gap, we refined a process‐based lake biogeochemical model to simulate global lake CH 4 emissions, including representation of lake bathymetry, oxic methane production (OMP), the effect of water level on ebullition, new non‐linear CH 4 oxidation kinetics, and the coupling of sediment carbon pools with in‐lake primary production and terrigenous carbon loadings. We compiled a lake CH 4 data set for model validation. The model shows promising performance in capturing the seasonal and inter‐annual variabilities of CH 4 emissions at 10 representative lakes for different lake types and the variations in mean annual CH 4 emissions among 106 lakes across the globe. The model reproduces the variations of the observed surface CH 4 diffusion and ebullition along the gradients of lake latitude, depth, and surface area. The results suggest that OMP could play an important role in surface CH 4 diffusion, and its relative importance is higher in less productive and/or deeper lakes. The model performance is improved for capturing CH 4 outgassing events in non‐floodplain lakes and the seasonal variability of CH 4 ebullition in floodplain lakes by representing the effect of water level on ebullition. The model can be integrated into ESMs to constrain global lake CH 4 emissions and climate‐CH 4 feedback.

54 ENVIRONMENTAL SCIENCES↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Challenges of designing, operating, and managing brine extraction at a carbon dioxide storage site

Developing and deploying commercial-scale carbon dioxide (CO 2 ) storage at a site requires operational strategies to manage pressure and CO 2 plume distribution. In the natural gas storage and oil and gas industries, fluid extraction has been successfully implemented as a strategy to manage pressure and control fluid distribution (i.e., hydrocarbon recovery and natural gas storage efficiency, respectively). The technical challenges of integrating brine extraction at CO 2 storage sites are expected to be similar, if not identical, to those in the natural gas storage and petroleum industries. Major technical challenges of using brine extraction to manage storage in a storage unit include (1) designing and completing the brine extraction wells, (2) locating the brine extraction well, (3) assessing the efficacy of brine extraction, and (4) handling the extracted brine. The design and completion of the brine extraction well include the well type (i.e., vertical or horizontal) and perforated interval. The location of the well is influenced by the timing of extraction operations (i.e., prior or after CO 2 injection starts) and project objectives (i.e., desired directional movement of the CO 2 plume and avoid or minimize CO 2 extraction). The efficacy of brine extraction requires a baseline projection of the pressure and CO 2 plume distribution. Options for handling extracted brine include subsurface disposal, surface disposal, and industrial use. Here this paper addresses means of overcoming technical challenges that may likely be encountered before or after CO 2 injection starts.

25 ENERGY STORAGE↗

Epidemiological Investigation of a Mortality Event in a Translocated Gopher Tortoise (Gopherus polyphemus) Population in Northwest Florida

Nokuse Plantation, a 22,055 ha private conservation preserve in northwest Florida, is a recipient site for gopher tortoises translocated from development sites in Florida. Since 2006, Nokuse has received over 5,000 tortoises from multiple development sites. During 2013–2015, 52 tortoises were found sick (n = 14) or dead (n = 38) in multiple soft-release enclosures in which tortoises consistently exhibited clinical signs, with additional sick (n = 5) and dead (n = 5) tortoises presenting similarly during 2016–2017. When found alive, tortoises behaved abnormally (e.g., frequently out of burrows during cold weather, pacing along enclosure fencing), appeared emaciated, were lethargic, and had developed redness under plastron scutes. Similar numbers of male (n = 28) and female (n = 32) tortoises were recovered along with two of unidentified sex, including mainly adults (n = 59) and three subadults. Physical examination, blood analysis, and other diagnostics were indicative of starvation and dehydration. Most sick tortoises provided with supportive care recovered. Necropsy findings generally confirmed starvation, with no evidence of infectious pathogens or contaminants. There were no apparent differences in quality of habitat, plant community, or soil or water among affected and unaffected enclosures. Botanical surveys indicated adequate forage quality and quantity, with no poisonous exotic or native plants detected. No land management practices changed prior to this event. Analysis of epidemiological data and demographic factors from before and during this mortality event identified initial density of tortoises in the enclosures as exerting the strongest influence on detection of tortoise morbidity and mortality. We believe that the stress associated with mixing tortoises from different populations and at higher densities during translocation impacted an individual tortoise’s ability to obtain or absorb adequate nutrients from foraging, ultimately leading to a wasting condition consistent with starvation. Based on our findings, we recommend a maximum of 3 gopher tortoises per ha in soft-release enclosures for translocation, but further research is warranted to investigate the complexity of stress and social pressures associated with translocation.

59 BASIC BIOLOGICAL SCIENCES↗

Oak Ridge National Laboratory 2025 Site Sustainability Plan With FY 2024 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Office (SPO) issues instruction documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPO is part of the DOE Office of Asset Management. As required by DOE Order 436.1A, Departmental Sustainability, each site develops and commits to an annual site sustainability plan (SSP) that identifies its respective contribution toward meeting DOE’s sustainability goals. SPO collects and compiles information reported by each site to develop an agency-wide sustainability report and implementation plan, which are used to report DOE sustainability progress to the federal government as required by all major federal agencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-resolution Hindcasts for U.S. Wave Energy Resource Characterization

The marine and hydrokinetic (MHK) industry is at an early stage of development and has the potential to play a significant role in diversifying the U.S. energy portfolio and reducing the U.S. carbon footprint. Wave energy is the largest among all the U.S. MHK energy resources, which include wave energy, ocean current, tidal-instream, ocean thermal energy conversion, and river-instream. Wave resource characterization is an essential step for regional wave energy assessments, Wave Energy Converter (WEC) project development, site selection and WEC design. The present paper provides an overview of a joint modelling effort by the Pacific Northwest National Laboratory and Sandia National Laboratories on high-resolution wave hindcasts to support the U.S. Department of Energy’s Water Power Technologies Office’s program of wave resource characterization, assessment and classifications in all US coastal regions. Topics covered include the modelling approach, model input requirements, model validation strategies, high performance computing resource requirements, model outputs and data management strategies. Examples of model setup and validation for different regions are provided along with application to development of classification systems, and analysis of regional wave climates. Lessons learned and technical challenges of the long-term, high-resolution regional wave hindcast are discussed.

Yang, Zhaoqing↗

Quantifying the Effect of Economic Development Zones on Electrical Load Growth in Kentucky [Slides]

The Kentucky Energy and Environment Cabinet has recently undertaken a comprehensive effort to map and catalog potential economic development sites across the state. The purpose of this technical assistance is to quantify the potential impact of developing designated sites on Kentucky's electricity load growth, providing insights at both state and county level considering the next 10 years. This analysis should explicitly incorporate and address key project uncertainties by developing various load growth scenarios that account for development scale, site specificity, and sector variability. The need for a site-specific analysis comes from the understanding that conventional econometric (top-down) load forecasting models cannot sufficiently isolate or predict the discrete load increases resulting from the development of these unique and targeted economic sites.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Study on Radionuclides Selection for DCGLs Development for Site Release of KRR Units 1 and 2 site in Korea - 20256

The selection of Derived Concentration Guideline Levels (DCGLs) in nuclear facilities decommissioning is important because they serve as criteria for site characterization and final status surveys. DCGLs should be derived for KAERI TRIGA Mark II and III research reactor site clearance and prior to the work, a radionuclides list for DCGLs consideration was created. Radionuclides selection for DCGLs was performed according to the procedure proposed by the US NRC based on the characterization survey related to the decommission site. By evaluating the dose contribution of each radionuclide using D and D computer code, radionuclides with a dose contribution fraction of 0.1% or more for the entire radionuclide were selected. As a result, the selected radionuclides were beta radionuclides H-3, C-14 and Sr-90 and gamma radionuclides Co-60, Cs-137, Eu-152 and Eu-154. The selected radionuclides can be presented for consultation with domestic regulatory agencies in the future and will be used as the technical base of DCGLs for the final status survey. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP): Site Energy Management System Platform Development

A site energy management system is a critical component of future high-power EV charging hubs. It monitors and supervises all inter-hub operations, coordinates grid interactions, and implements energy management strategies and load-sharing controls at various levels and time scales. This report provides a comprehensive high-level overview and guidelines on the essential elements of such energy management systems. These elements primarily focus on the core functions, architecture, and monitoring aspects of site energy management. The core functions define the grid services and operational objectives that a charging hub is expected to provide and achieve. The architectural section investigates the coordination between hub assets, different control schemes, and their potential benefits and drawbacks. Lastly, the report discusses the needs, types, and functionalities of a monitoring and visualization system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Past Approaches for Spent Nuclear Fuel, Transuranic, and High-Level Waste Disposal in the United States—Part 2: Siting Process, Staged Development, and Public Preferences

This report presents pertinent aspects of the ~50-year United States experience in siting a mined geologic disposal repository for spent nuclear fuel (SNF), transuranic (TRU) waste, and high-level radioactive waste (HLW) as related to site selection and the staged process for site investigations as specified in the Nuclear Waste Policy Act of 1982 and generic and site-specific regulations of the US Department of Energy (DOE), US Environmental Protection Agency (EPA), and US Nuclear Regulatory Commission (NRC). The roles of the Environmental Impact Statement and guidance in international consensus standards by the International Atomic Energy Agency are also mentioned. The focus is on siting and developing the Waste Isolation Pilot Plant, an operating repository for TRU waste from atomic energy defense activities, and the proposed Yucca Mountain repository for commercial SNF and HLW. In the social dimension, the role of institutional stakeholders is described. Past national surveys related to waste management options for storage and disposal provide insight on public preferences of other stakeholders. The descriptions are intended to help other countries more fully understand the stages adopted for siting and developing repositories in the United States.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗