Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Apollo experience report: Ground-support equipment

The experience gained in management of the ground-support-equipment and site-readiness activity for the Apollo Program is summarized. The design of equipment and facilities are examined as well as some operational aspects. The organization for ensuring site readiness and the maintenance of ground-support equipment are discussed. Recommendations for use in future programs are given in the areas of design considerations, cleanliness requirements, periodic evaluation of changing requirements, maintenance and overhaul, special test equipment, site-activation schedule coordination, and schematics for ground-support equipment.

Cooper, J. S.↗

MRCI Task 4: Evaluating Regional Infrastructure Technical Summary Report

The infrastructure required to enable carbon capture and sequestration (CCS) goes beyond the equipment and materials needed to capture, transport, and store carbon dioxide (CO2) but includes people and policy that make CCS feasible. The Infrastructure Assessment task of the Midwest Regional Carbon Initiative (MRCI) seeks to determine the infrastructure requirements for the MRCI study area through four activities: • Infrastructure Readiness: Strategizing the buildout of capture, transport, and storage infrastructure in the Midwest, Northeast, and Mid-Atlantic Offshore. • Site Readiness: Determining the CCS readiness of each state in the MRCI region in the categories of subsurface readiness; infrastructure readiness; regulations, permitting, and incentives; and social dynamics. • Jobs, Economics, and Social Characteristics: Quantifying the economic potential, job opportunities, and training opportunities for CCS as well as the social characteristics of the region with a focus on energy and environmental justice (EJ) issues. • Policy and Regulations: Providing an updated accounting of the CCS-relevant policy and regulations in the MRCI region.

CCUS,Carbon storage,Midwest,Midwest Regional Carbo↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

Launch Ready! High-Resolution Site Characterization and the Expedited Remediation of a Multi-Acre Chlorinated Volatile Organic Compound Plume at NASA’s Launch Complex 39B

Geosyntec teamed with the National Aeronautics and Space Administration (NASA) to restore groundwater resources and protect sensitive aquatic habitats at Launch Complex 39B (LC39B), a National Historic Site located within the John F. Kennedy Space Center (KSC) on the east coast of Florida (Figure 1). The goal of this project was to remediate chlorinated volatile organic compound (CVOC) impacts in groundwater that had the potential to discharge to the sensitive habitat surrounding LC39B and to complete the remediation before NASA’s Artemis Program’s Space Launch System missions began. The Geosyntec NASA team met this goal by developing a robust Conceptual Site Model (CSM) using High Resolution Site Characterization (HRSC), using the CSM to design a multifaceted and highly specialized air sparge (AS) system to remediate the groundwater, and installing, operating, and optimizing the AS system to achieve the Corrective Action Objective (CAOs). The CAOs were achieved after only 2 years of AS system operation, which has significantly reduced the CVOC concentrations and mass present in the groundwater and mitigated the potential discharge of impacted groundwater to the surrounding sensitive aquatic habitat, all before the Artemis Program’s launches at LC39B.

Rebecca C. Deprato↗

I-80 Mid-America Clean Fuels Corridor: Deployment Plan Report

The I-80 Mid-America Clean Fuels Corridor, which spans I-80 from Fort Lee, New Jersey, to Council Bluffs, Iowa, was designated an Alternative Fuels Corridor (AFC) in Round 1 of the Alternative Fuels Corridor program administered by the U.S. Department of Transportation’s (DOT’s) Federal Highway Administration (FHWA). Originally called the “I-80 Mid-America Alternative Fuels Corridor,” it is now named the “I-80 Mid-America Clean Fuels Corridor.” As of Round 6 AFC designation, parts of the corridor have sufficient direct current fast charging (DCFC) stations to be designated Electric Vehicle (EV)-Ready and sufficient compressed natural gas (CNG) fueling stations to be designated CNG-Ready. However, much of the corridor’s approximately 1,240 miles (mi) are not yet EV- or CNG-Ready. This includes about 1,130 mi that are designated EV-Pending and 700 mi that are designated CNG-Pending. This report presents a plan to develop EV charging and CNG fueling infrastructure sufficient to convert the entire length of the corridor to EV-Ready and CNG-Ready. Specific sites are not identified for future infrastructure. Rather, priority exits are identified, and information, analysis, and additional steps are recommended to support further refinement of these locations, as well as additional outreach and deployment efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Appropriateness and Readiness of Cold Crucible Vitrification of Calcine Solids at the Idaho Site and H-Canyon Effluent at the Savannah River Site

This report summarizes the results from an assessment of the technology readiness and deployment of cold crucible induction melter (CCIM) technology to vitrify high level waste (HLW) calcine solids at the Idaho Site and H-Canyon liquid effluent at the Savannah River Site (SRS). The assessment was requested by the Department of Energy’s Office of Environmental Management (DOE-EM), but is not a DOE 413-3-4a assessment for technology deployment. A joint Savannah River National Laboratory (SRNL) and Fluor Idaho Cleanup Project (ICP) team with subject matter experts evaluated the existent literature and experience both within the DOE as well as relevant external experience. The technology assessment focused on the site-specific technology readiness and appropriateness based on a number of system factors including feasibility and appropriateness of the technology for the specific site application, the potential extent of the regulatory and design challenges, and evaluation of the ability to deploy within the treatment needs of each site. This initial assessment provides information to support DOE-EM in making a go/no-go decision to carry out additional work on the technology maturation for critical decisions and planning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of SNF, most of which are located at the INL site. “Road-ready dry storage” is a management concept where SNF is packaged into dry, sealed canisters, which are then placed in on-site storage in anticipation of later removal. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE SNF for road-ready dry storage. In support of establishing a large-scale road-ready dry storage program at the INL site, the demonstration will package a select amount of DOE-managed SNF into DOE Standard Canisters. The closure process for the DOE Standard Canisters will include fuel and basket loading, welding, inspection, leak testing, and if needed, repair. As a follow-up to previous discussion on the design of the DOE Closure Leak Test Assembly, this report describes recent fabrication and testing efforts performed at INL. DOE Standard Canisters are sealed by two sequential gas tungsten arc welds. Both are performed by remotely operated and semi-autonomous welding systems. The first weld is a circumferential pipe weld that completes assembly of the canister body and lid assembly. The second and final closure weld connects the vent plug to the vent port with an identical butt joint to the circumferential pipe weld. After the second weld is performed on the vent port, these welds are helium leak tested using an inside-out technique. In addition to the commercially available vacuum and leak detector systems, the DOE Standard Canister Closure Leak Test Assembly was designed for both remote and manual operation. This report describes fabrication and performance testing associated with the inside-out technique. INL staff designed and tested systems to accomplish these tasks. Hardware fabrication occurred at INL facilities. Forthcoming work includes design optimization, integration to existing systems, and implementation to packaging demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IITA Cooperative Agreement Projects for Classroom Usability

Based on this review, the following conclusions are drawn regarding the 'school readiness' of the sites. All six of the sites had great appeal to the reviewers and therefore we can conclude that each has tremendous potential for use in the classroom. None, however, were given a completely 'school-ready' assessment. With recommended revisions, each site will be a valuable asset to the classroom teacher. For each as well, teachers particularly had problems with access or finding them, but once there, felt they all had some relevance. Many of the weaknesses noted related to lack of guidance for teachers with links to their curriculum or provision of activities. Other weaknesses related to the lack of educational purpose, however, this may be addressed in the development of strong teacher resources and guides linked to the sites. For those sites with a weak or without a teacher's guide, adding this component would be worth the expenditure of time and money needed.

Grabowski, Barbara↗

Opportunities for an Integrated Web-Based Workbench for Data Access and Analysis - 20244

Management of environmental issues can require integration of multiple types of data and information, conducting data analysis and interpretation, and providing data visualization for effective communications. These data elements are important for site management to support regulator interactions and provide defensibility for remedial decisions. Databases and information repositories are core elements of managing data; however, efficient data access and analysis also enable effective site management. The U.S. Department of Energy (DOE) Hanford Site is an example of a complex site with a voluminous quantity of environmental data and a need for efficient site management. Different tiers of data and information tools have been developed and deployed to address site needs. These tools are configured for ready access via the web site interfaces and meet the rigorous quality requirements for environmental site management. Evolving efforts are focused on an integrated platform to meet site environmental management needs. In this platform, users can access site information at multiple levels of detail based on their need and permissions, so that data and associated analyses are presented within the context of the site mission and the user's management or technical needs. This concept is not only applicable at individual sites like Hanford but also applicable at other sites within the DOE complex. An integrated web-based architecture that links data visualization, data analytics, and management tools can provide holistic access to large data sets, minimize complexity, and maximize interactivity and technical communication. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

Engineering of Self‐Aggregation‐Resistant MnO 2 Heterostructure with A Built‐in Field for Enhanced High‐Mass‐Loading Energy Storage

Abstract Although MnO 2 has been intensively investigated for energy storage, further applications are limited by van der Waals force‐triggered self‐aggregation that always leads to poorly exposed active sites and compromised reaction dynamics, especially under high‐mass‐loading conditions. Herein, by synergistically coupling interfacial modulation with the Kirkendall effect, this work achieves in situ topological structure reorganization of MnOOH toward the high‐aspect‐ratio MnO 2 heterostructure (Heter‐MnO 2 ) with fully exposed active sites, which is ready to assemble into self‐supporting high‐mass‐loading film (30 mg cm −2 ) with restrained self‐aggregation. Theoretical calculation and dynamics analysis results demonstrate the generation of the built‐in field within the heterostructure, thus enhancing the electronic‐transfer and ionic‐adsorption/transport rates. As such, the 30 mg cm −2 Heter‐MnO 2 electrode achieves a superior areal capacitance of 4762 mF cm −2 at 1 mA cm −2 and a sound rate performance (79% at 100 mA cm −2 ) comparable to those of low‐mass‐loading/thin‐film electrodes. As a proof of concept, the fabricated planar interdigital quasi‐solid‐state symmetric micro‐supercapacitor (MSC) based on the Heter‐MnO 2 electrode can deliver a remarkable areal capacitance of 181 mF cm −2 and a considerable volumetric energy density of 10.3 mWh cm −3 . This methodology highlights the promise of surface/interface chemistry modulation for the configuration of easy‐to‐integrate hierarchical nanostructures to better meet practical energy applications.

Chemistry↗

XSP Methane Sensors Test and Evaluation Project “M-Step”

Methane sensor technology is employed in industry sectors from oil and gas to agriculture, landfills, and monitoring of natural emissions. The US oil and gas sector is extensive in scale, critical to fulfilling US energy needs, and deals with commodities presenting enormous challenges for personnel safety and the environment. Thus, it is imperative that they have accurate and responsive sensors to detect hazardous gases such as methane. US space launch systems will increasingly also use liquefied methane and liquefied natural gas (LNG), which is mostly methane, in quantities large and small, as main and auxiliary propulsion and power. Some of these systems will be reusable, which adds the unique challenge of processing a vehicle that has residual commodities and has returned to its launch site to be readied for its next launch. The methane sensors test and evaluation project (M-STEP) began within the context of a reusable launch system, the Defense Advanced Research Projects Agency (DARPA) Experimental Spaceplane (XSP) program, which would have employed a high-pressure gaseous methane and gaseous oxygen reaction control system. Although the XSP partnership between Boeing and DARPA was terminated by Boeing in early 2020, DARPA and KSC have continued to collaborate in the area of gas sensors with the hydrogen sensor test and evaluation project (H-STEP) and with M-STEP. The NASA Launch Services program (LSP) invested in M-STEP in FY 2021 “to evaluate and understand the state-of-the-art in methane gas sensors”. M-STEP and the LSP effort was complementary, pushing in the same direction to understand US launch system stakeholder needs and approaches, requirements internal (NASA) and external, and commercially available or forthcoming methane sensing technologies, practices, and approaches. In addition, M-STEP (as with H-STEP) enhances KSC capabilities and understanding of these technologies, informing agency investments and further research in these areas.

Tracy L. Gibson↗

A phased workflow to define permit‐ready locations for large volume CO 2 injection and storage

Abstract To‐date, only two UIC Class VI permits have been issued by the US Environmental Protection Agency. We illustrate a four‐phase workflow to first identify regional storage resources and then down‐select sites to yield permit‐ready locations that can accept and store large volumes of CO 2 . Specific permit requirements should guide objectives and define deliverables of respective workflow phases. In the first phase we used available regional data and screened structure and injection zones to locate resources that match CO 2 volumes planned to be captured. Available data were also used to assess presence and depth of usable groundwater, the key resource being protected via permitting. We then used advanced, closed‐form, analytical solutions (EASiTool) to estimate CO 2 injectivity into each hydrologically connected injection compartment. In the second phase we acquired and conditioned additional wireline logs and leased available seismic datasets. We interpreted the depositional systems from wireline well‐log character and mapped sandbody geometry to interpolate injection and confining‐zone distribution. Using available data, we mapped faults and locations of freshwater and overpressure (or other capacity‐limiting geologic parameters) in more detail. In the third phase, we used the augmented geologic data to develop a static model for the selected area, extracted the areas of highest interest, and generated and ran dynamic (flow) models. In a fourth phase, we reduced major uncertainties identified in earlier phases. Our case study indicates that to complete preparation of a permit application requires (1) improved lithologic characterization information (thicknesses and horizontal and vertical connectivity) and (2) better definition of poorly defined local faults. © 2023 The Authors. Greenhouse Gases: Science and Technology published by Society of Chemical Industry and John Wiley & Sons Ltd.

58 GEOSCIENCES↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗