DOE OSTI2024
The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.
20 FOSSIL-FUELED POWER PLANTS↗