Search NASA⌕ Search

SEARCH · Search NASA

Results for “Software CCF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Application of a Modified Beta Factor Method for the Analysis of Software Common Cause Failures

This paper presents an approach for modeling software common cause failures (CCFs) within digital instrumentation and control (I&C) systems. CCFs consist of a concurrent failure between two or more components due to a shared failure cause and coupling mechanism. This work emphasizes the importance of identifying software-centric attributes related to the coupling mechanisms necessary for simultaneous failures of redundant software components. The groups of components that share coupling mechanisms are called common cause component groups (CCCGs). Most CCF models rely on operational data as the basis for establishing CCCG parameters and predicting CCFs. This work is motivated by two primary concerns: (1) a lack of operational and CCF data for estimating software CCF model parameters; and (2) the need to model single components as part of multiple CCCGs simultaneously. A hybrid approach was developed to account for these concerns by leveraging existing techniques: a modified beta factor model allows single components to be placed within multiple CCCGs, while a second technique provides software-specific model parameters for each CCCG. This hybrid approach provides a means to overcome the limitations of conventional methods while offering support for design decisions under the limited data scenario.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INTEGRATED RISK ASSESSMENT OF DIGITAL I&C SAFETY SYSTEMS FOR NUCLEAR POWER PLANTS

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems provides the foremost means to improve performance and reduce costs for existing light-water reactors (LWRs). However, qualification of digital technologies remains a challenge?especially the issue of software common cause failure (CCF), which has been difficult to address. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, software CCFs due to design flaws might become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission (NRC) licensing procedures. In 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy?s (DOE?s) Light Water Reactor Sustainability (LWRS) Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, secure DI&C technologies for digital upgrades/designs. An integrated risk assessment for the DI&C (RADIC) process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. This paper summarizes these RISA efforts in the risk analysis of safety-related DI& systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Risk Assessment Process of Safety-Related Digital I&C Systems in Nuclear Power Plants

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems will greatly benefit existing light water reactors. However, the issue of software common cause failure (CCF) remains an obstacle in terms of qualification for digital technologies. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, design flaws could cause software CCFs to become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multilayer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission licensing procedures. In Fiscal Year 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy’s Light Water Reactor Sustainability Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades and designs. An integrated risk assessment for the DI&C process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. Here this paper summarizes these RISA efforts in the risk analysis of safety-related DI&C systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analyzing Hardware and Software Common Cause Failures in Digital Instrumentation and Control Systems using Dual Error Propagation Method

This paper develops a methodology for quantifying software common cause failures (CCFs) in digital instrumentation and control (I&C) systems of nuclear power plants. To support the transition of analog I&C systems to digital in nuclear power plants, probabilistic risk assessment (PRA) techniques are used. The hardware components of the I&C systems have reliability databases that can be used in the PRA studies. However, the failure data for redundant software components of the systems is sparse. Failure of components constitutes a CCF, wherein two or more components or systems fail due to a single shared cause and coupling mechanism. This paper proposes a quantification approach that can simultaneously model hardware and software components, incorporate the CCFs of software systems in the models, and bridge the gap between the failure quantification of models and the development of CCF parametric databases. We demonstrate the dual error propagation method (DEPM) by developing I&C systems failure models for a representative digital reactor trip system. The DEPM models are built to simulate the control and data flows within the systems and can accommodate failure states. By expanding DEPM to software CCFs, we generated alpha factor parameter estimates for each of the modeled error propagation mechanisms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Hardware and Software Bill of Materials (HBOMs/SBOMs) Extraction Methods

Hardware and software bills of materials (HBOMs and SBOMs) provide important visibility into the components, dependencies, and supply chain relationships within programmable digital devices. This visibility is critical for advanced nuclear reactor applications, where use of common or shared hardware components, software libraries, suppliers, or manufacturing processes may create common cause failure (CCF) vulnerabilities despite apparent diversity. This paper evaluates current approaches for obtaining and analyzing HBOMs and SBOMs in support of CCF, diversity and defense-in-depth (D3) assessments, and begins to explore potential methods for artificial intelligence/machine learning-based analysis. The availability of BOM information from advanced reactor manufacturers and vendors, representative hardware and software categories found in advanced reactor systems continues to limit research [13]. This paper compares commonly used BOM formats, including CycloneDX, SPDX, and SWID. It also surveys publicly available tools for generating BOMs from source code, compiled binaries, and hardware-related information, noting limitations in language coverage, system age, and format interoperability. Finally, this paper evaluates methods for correlating BOM data with vulnerability and exploitability information, including VEX, CVE, and CWE resources. The findings indicate that publicly available nuclear-vendor BOMs are limited, making third-party extraction and research into novel analysis techniques necessary.

Cybersecurity↗

MPST Software: MoonKommand

This software automatically processes Sally Ride Science (SRS) delivered MoonKAM camera control files (ccf) into uplink products for the GRAIL-A and GRAIL-B spacecraft as part of an education and public outreach (EPO) extension to the Grail Mission. Once properly validated and deemed safe for execution onboard the spacecraft, MoonKommand generates the command products via the Automated Sequence Processor (ASP) and generates uplink (.scmf) files for radiation to the Grail-A and/or Grail-B spacecraft. Any errors detected along the way are reported back to SRS via email. With Moon Kommand, SRS can control their EPO instrument as part of a fully automated process. Inputs are received from SRS as either image capture files (.ccficd) for new image requests, or downlink/delete files (.ccfdl) for requesting image downlink from the instrument and on-board memory management. The Moon - Kommand outputs are command and file-load (.scmf) files that will be uplinked by the Deep Space Network (DSN). Without MoonKommand software, uplink product generation for the MoonKAM instrument would be a manual process. The software is specific to the Moon - KAM instrument on the GRAIL mission. At the time of this writing, the GRAIL mission was making final preparations to begin the science phase, which was scheduled to continue until June 2012.

Kwok, John H.↗

A Bayesian and HRA-Aided Method for the Novel Reliability Analysis of Software

Technological advancements and nuclear power plant modernization has inspired considerable research in the areas of safety and reliability, yet there remains a lack of consensus for the reliability assessment of digital instrumentation and control (I&C) systems. Motivated by the lack of consensus for reliability analysis methods, this work employs a novel framework that incorporates Bayesian, human reliability, and common-cause failure (CCF) modeling techniques. The novel framework allows the use of state-of-the-art or classical modeling techniques when accounting for human and CCF effects on system reliability. The Bayesian and HRA-Aided Method for the Reliability Analysis of Software (BAHAMAS) is demonstrated by a case study for the quantification of software hazards found in a previous analysis of a digital reactor trip system. The results demonstrate the ability of BAHAMAS to account for human activities during the software development life cycle and their influence on software reliability. BAHAMAS is a flexible tool for extending the coverage of conventional probabilistic risk assessments to include modernized digital I&C systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wavelet Compression of Satellite-Transmitted Digital Mammograms

Breast cancer is one of the major causes of cancer death in women in the United States. The most effective way to treat breast cancer is to detect it at an early stage by screening patients periodically. Conventional film-screening mammography uses X-ray films which are effective in detecting early abnormalities of the breast. Direct digital mammography has the potential to improve the image quality and to take advantages of convenient storage, efficient transmission, and powerful computer-aided diagnosis, etc. One effective alternative to direct digital imaging is secondary digitization of X-ray films. This technique may not provide as high an image quality as the direct digital approach, but definitely have other advantages inherent to digital images. One of them is the usage of satellite-transmission technique for transferring digital mammograms between a remote image-acquisition site and a central image-reading site. This technique can benefit a large population of women who reside in remote areas where major screening and diagnosing facilities are not available. The NASA-Lewis Research Center (LeRC), in collaboration with the Cleveland Clinic Foundation (CCF), has begun a pilot study to investigate the application of the Advanced Communications Technology Satellite (ACTS) network to telemammography. The bandwidth of the T1 transmission is limited (1.544 Mbps) while the size of a mammographic image is huge. It takes a long time to transmit a single mammogram. For example, a mammogram of 4k by 4k pixels with 16 bits per pixel needs more than 4 minutes to transmit. Four images for a typical screening exam would take more than 16 minutes. This is too long a time period for a convenient screening. Consequently, compression is necessary for making satellite-transmission of mammographic images practically possible. The Wavelet Research Group of the Department of Electrical Engineering at The Ohio State University (OSU) participated in the LeRC-CCF collaboration by providing advanced compression technology using wavelet transform. OSU developed a time-efficient software package with various wavelets to compress a serious of mammographic images. This documents reports the result of the compression activities.

Zheng, Yuan F.↗

An Efficient Approach for the Reliability Analysis of Phased-Mission Systems with Dependent Failures

We consider the reliability analysis of phased-mission systems with common-cause failures in this paper. Phased-mission systems (PMS) are systems supporting missions characterized by multiple, consecutive, and nonoverlapping phases of operation. System components may be subject to different stresses as well as different reliability requirements throughout the course of the mission. As a result, component behavior and relationships may need to be modeled differently from phase to phase when performing a system-level reliability analysis. This consideration poses unique challenges to existing analysis methods. The challenges increase when common-cause failures (CCF) are incorporated in the model. CCF are multiple dependent component failures within a system that are a direct result of a shared root cause, such as sabotage, flood, earthquake, power outage, or human errors. It has been shown by many reliability studies that CCF tend to increase a system's joint failure probabilities and thus contribute significantly to the overall unreliability of systems subject to CCF.We propose a separable phase-modular approach to the reliability analysis of phased-mission systems with dependent common-cause failures as one way to meet the above challenges in an efficient and elegant manner. Our methodology is twofold: first, we separate the effects of CCF from the PMS analysis using the total probability theorem and the common-cause event space developed based on the elementary common-causes; next, we apply an efficient phase-modular approach to analyze the reliability of the PMS. The phase-modular approach employs both combinatorial binary decision diagram and Markov-chain solution methods as appropriate. We provide an example of a reliability analysis of a PMS with both static and dynamic phases as well as CCF as an illustration of our proposed approach. The example is based on information extracted from a Mars orbiter project. The reliability model for this orbiter considers the various phases of Launch, Cruise, Mars Orbit Insertion, and Orbit. Some of the CCF for the orbiter in this mission include environmental effects, such as micrometeoroids, human operator errors, and software errors.

reliability analysis↗

Considerations regarding the Use of Computer Vision Machine Learning in Safety-Related or Risk-Significant Applications in Nuclear Power Plants

With the advancements made to date in the field of artificial intelligence (AI), significant potential exists to utilize AI capabilities for nuclear power plant (NPP) applications. AI can replicate human decision making and it is usually faster and more accurate than humans. For implementations that impact critical NPP applications (e.g., safety-related or non-safety systems that potentially affect overall plant risk), a deeper safety analysis of the AI methods is necessary. AI applied to NPP operations could resemble the use of digital I&C (DI&C) because such applications involve digital computer hardware and custom-designed software that input plant data, execute complex software algorithms, and output the results to a system or licensed human operator to potentially provoke an action. For AI methods to be compliant with current safety requirements for DI&C, AI compatibility must be evaluated, and AI-related gaps may exist that prevent the prompt deployment of AI in NPPs. This effort aims to evaluate how example AI technologies align with the DI&C safety framework, and discusses how they could be analyzed, modeled, tested, and validated in a manner similar to typical DI&C technologies. Because AI is a broad field that encompasses areas such as machine learning (ML), natural language processing, and computer vision, this research focused on a subset of methods categorized as the computer vision ML (CVML) methods. This report explores two CVML use cases, gauge reading and fire watch, considered relevant to the DI&C standards, as they could play a safety-critical role. For the gauge reading use case, a CVML-enabled technology that can read gauges at oblique angles is utilized. For the fire watch use case, a CVML-enabled technology is utilized that migrates fire watch from a manual (human) approach to automated fire detection. These use cases are mainly intended to give context to the CVML system discussion. This effort assumes the worst-case scenario, with the CVML system being used to replace a safety-related or risk-significant system, thus requiring evaluation. Evaluating CVML against most of the relevant safety requirements for DI&C yielded several CVML-specific considerations due to the uniqueness of its characteristics in comparison with typical DI&C systems. For example, CVML models often employ commonly used (open-source) datasets, and it is not always possible to determine the level of overlap among open-source datasets. Therefore, the independence of the developed CVML models when demonstrating diversity is questionable, therefore creating vulnerability to common cause failure (CCF). The design verification process is also impacted since the data overlap could result in overestimation of the software validation and verification (V&V) performance results. Section 2 of this report evaluates a list of the identified CVML-specific characteristics and discusses the resulting considerations and potential solutions in the context of each referenced requirement. A summation is provided in Section 3. This report is not to be used as a guideline. It was developed to identify and consider issues in the implementation of ML technologies used to augment activities that may have a bearing on plant operation. The report draws parallels to the use of DI&C technologies, for which many standards are available to guide their use in nuclear plant operation. It considers the technologies and some of the potential implications of their use in safety-related applications but is not intended to address regulatory or licensing related issues.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Advancement and Application

This report documents activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2024 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, Digital Instrumentation and Control (DI&C) Risk Assessment project. The goal of the RISA Pathway is to optimize safety margins and minimize uncertainties to achieve economic efficiencies while maintaining high levels of safety. This is accomplished by providing scientific basis to better represent safety margins and factors that contribute to cost and safety, and by developing new technologies that reduce operating costs. The research efforts for FY 2024 encompass methodology refinement and exploration. The efforts include: (1) The implementation of a natural language processing tool to expedite key aspects of the reliability analysis methods developed by INL; (2) advances to support intersystem CCF analysis by providing guidance for and identification of coupling mechanisms that may contribute to CCF; (3) the investigation of how generative artificial intelligence tools can aid in hazard analysis and diversity and defense in depth (i.e., D3) assessments; (4) Industry collaboration, allowing the demonstration of and INL's risk assessment tools to support risk assessment of DI&C systems at early and late stages of development; (4) a roadmap for the development of a software for each of INL's risk assessment tools; (5) The development of a theory and methodology manual for a risk quantification methodology; (6) the development of a reliability analysis for machine learning (ML)-integrated control systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗