Verification of a rapid mooring and foundation design tool

Marine renewable energy devices require mooring and foundation systems that suitable in terms of device operation and are also robust and cost effective. In the initial stages of mooring and foundation development a large number of possible configuration permutations exist. Filtering of unsuitable designs is possible using information specific to the deployment site (i.e. bathymetry, environmental conditions) and device (i.e. mooring and/or foundation system role and cable connection requirements). The identification of a final solution requires detailed analysis, which includes load cases based on extreme environmental statistics following certification guidance processes. Static and/or quasi-static modelling of the mooring and/or foundation system serves as an intermediate design filtering stage enabling dynamic time-domain analysis to be focused on a small number of potential configurations. Mooring and foundation design is therefore reliant on logical decision making throughout this stage-gate process. The open-source DTOcean (Optimal Design Tools for Ocean Energy Arrays) Tool includes a mooring and foundation module, which automates the configuration selection process for fixed and floating wave and tidal energy devices. As far as the authors are aware, this is one of the first tools to be developed for the purpose of identifying potential solutions during the initial stages of marine renewable energy design. While the mooring and foundation module does not replace a full design assessment, it provides in addition to suitable configuration solutions, assessments in terms of reliability, economics and environmental impact. This article provides insight into the solution identification approach used by the module and features the verification of both the mooring system calculations and the foundation design using commercial software. Several case studies are investigated: a floating wave energy converter and several anchoring systems. It is demonstrated that the mooring and foundation module is able to provide device and/or site developers with rapid mooring and foundation design solutions to appropriate design criteria.

42 ENGINEERING↗

Development of High-Performance Cast Crankshafts. Final Technical Report

The objective of this project was to develop technologies that would enable the production of cast crankshafts that can replace high performance forged steel crankshafts. To achieve this, the Ultimate Tensile Strength (UTS) of the new material needs to be 850 MPa with a desired minimum Yield Strength (YS; 0.2% offset) of 615 MPa and at least 10% elongation. Perhaps more challenging, the cast material needs to be able to achieve sufficient local fatigue properties to satisfy the durability requirements in today’s high performance gasoline and diesel engine applications. The project team focused on the development of cast steel alloys for application in crankshafts to take advantage of the higher stiffness over other potential material choices. The material and process developed should be able to produce high-performance crankshafts at no more than 110% of the cost of current production cast units, perhaps the most difficult objective to achieve. To minimize costs, the primary alloy design strategy was to design compositions that can achieve the required properties with minimal alloying and post-casting heat treatments. An Integrated Computational Materials Engineering (ICME) based approach was utilized, rather than relying only on traditional trial-and-error methods, which has been proven to accelerate alloy development time. Prototype melt chemistries designed using ICME were cast as test specimens and characterized iteratively to develop an alloy design within a stage-gate process. Standard characterization and material testing was done to validate the alloy performance against design targets and provide feedback to material design and manufacturing process models. Finally, the project called for Caterpillar and General Motors (GM) to develop optimized crankshaft designs using the final material and manufacturing processing path developed. A multi-disciplinary effort was to integrate finite element analyses by engine designers and geometry-specific casting simulations with existing materials models to optimize crankshaft cost and performance. Prototype crankshafts of the final design were to be produced and validated using laboratory bench testing and on-engine durability testing. ICME process simulation tools were used to investigate a broad range of processing concepts. These concepts included casting orientation, various mold and core materials, and various filling and feeding strategies. Each crankshaft was first simulated without gating and risers, which is termed natural solidification. The natural solidification results were used as a baseline for strategy development of each concept. Casting process simulations and ICME tools were proven to be reasonable predictors of real world results. Potential alloys were developed that could meet the project material property goals with appropriate normalization and temper treatments. For the alloys considered, post-normalization temper treatments proved to be necessary to achieve the desired yield strengths and elongations and appropriate heat treatments were designed using ICME tools. The experimental data of all the alloys were analyzed in combination with ICME tools to establish chemistry-process-structure relations. Several GM small gas engine (SGE) crankshafts were successfully cast in sand molds using two different sprue, runner, gate, riser, chill designs. These crankshafts were cast in two different steel alloys developed during the project, but casting finishing (e.g. riser removal) remains a cost challenge. A long list of future work was left unfinished when this project was unexpectedly terminated.

36 MATERIALS SCIENCE↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Stand-Alone and Hybrid Electric Thermal Energy Storage in the System Advisor Model

This project developed stand-alone electric-thermal energy storage (ETES), stand-alone pumped thermal energy storage (PTES), and hybrid molten-salt power tower (MSPT)-ETES performance and dispatch optimization techno-economic models. The models are available to the public through the System Advisor Model (SAM) software, scripting, and as open-source code. We compared results of the dispatch model to PLEXOS dispatch of a similar generator using the same initial grid pricing signal and found our dispatch model performed well, but closer agreement between the models was limited by the inherent differences between price-taker and unit commitment models. Nevertheless, the price-taker models developed in this project are useful to analyze proposed ETES and PTES technologies because they provide more detailed system and component models, solve several orders of magnitude faster, and are available as free open-source software. The model results represent the most optimistic returns considering grid arbitrage from the input electricity pricing, so the financial results can be applied as a feasibility stage-gate. We also submitted a journal draft paper that describes the ETES dispatch model methodology and demonstrates model functionality. An accepted journal article will serve as peer-reviewed documentation for the models, along with the open-source code, SAM help-menu content, and eventually this final project report.

14 SOLAR ENERGY↗

NHI Component Technical Readiness Evaluation System

A decision process for evaluating the technical readiness or maturity of components (i.e., heat exchangers, chemical reactors, valves, etc.) for use by the U.S. DOE Nuclear Hydrogen Initiative is described. This system is used by the DOE NHI to assess individual components in relation to their readiness for pilot-scale and larger-scale deployment and to drive the research and development work needed to attain technical maturity. A description of the evaluation system is provided, and examples are given to illustrate how it is used to assist in component R&D decisions.

08 HYDROGEN↗

NHI Component Technical Readiness Evaluation System

A decision process for evaluating the technical readiness or maturity of components (i.e., heat exchangers, chemical reactors, valves, etc.) for use by the U.S. DOE Nuclear Hydrogen Initiative is described. This system is used by the DOE NHI to assess individual components in relation to their readiness for pilot-scale and larger-scale deployment and to drive the research and development work needed to attain technical maturity. A description of the evaluation system is provided, and examples are given to illustrate how it is used to assist in component R&D decisions.

08 HYDROGEN↗