Search NASA⌕ Search

SEARCH · Search NASA

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Water in the Oceanic Lithosphere: Salt Lake Crater Xenoliths, Oahu, Hawaii

Water can be present in nominally anhydrous minerals of peridotites in the form of hydrogen bonded to structural oxygen. Such water in the oceanic upper mantle could have a significant effect on its physical and chemical properties. However, the water content of the MORB source has been inferred indirectly from the compositions of basalts. Direct determinations on abyssal peridotites are scarce because they have been heavily hydrothermally altered. Here we present the first water analyses of minerals from spinel peridotite xenoliths of Salt Lake Crater, Oahu, Hawaii, which are exceptionally fresh. These peridotites are thought to represent fragments of the Pacific oceanic lithosphere that was refertilized by alkalic Hawaiian melts. A few have unradiogenic Os and radiogenic Hf isotopes and may be fragments of an ancient (~2 Ga) depleted and recycled lithosphere. Water contents in olivine (Ol), orthopyroxene (Opx), and clinopyroxene (Cpx) were determined by FTIR spectrometry. Preliminary H_{2}O contents show ranges of 8-10 ppm for Ol, 151-277 ppm for Opx, and 337-603 ppm for Cpx. Reconstructed bulk rock H_{2}O contents range from 88-131 ppm overlapping estimates for the MORB source. Water contents between Ol minerals of the same xenolith are heterogeneous and individual OH infrared bands vary within a mineral with lower 3230 cm^{-1} and higher 3650-3400 cm^{-1} band heights from core to edge. This observation suggests disturbance of the hydrogen in Ol likely occurring during xenolith entrainment to the surface. Pyroxene water contents are higher than most water contents in pyroxenes from continental peridotite xenoliths and higher than those of abyssal peridotites. Cpx water contents decrease with increasing degree of depletion (e.g. increasing Fo in Ol and Cr# in spinel) consistent with an incompatible behavior of water. However Cpx water contents also show a positive correlation with LREE/HREE ratios and LREE concentrations consistent with refertilization. Opx water contents increase with increasing degree of depletion and decrease with LREE/HREE ratios which is inconsistent with the incompatible behavior of H. Calculated water contents of melts in equilibrium with Cpx or Opx range from 1.4 to 3.8 wt % which is higher than that of all Hawaiian lavas. Calculated melts in equilibrium with Cpx and Opx have variable but mostly high H_{2}O/Ce ratios (194 to 1146) consistent with those of rejuvenated stage lavas from Niihau and the South Arch volcanic field, but unlike the drier shield building stage tholeiites. Whether the high water contents recorded in Salt Lake Crater xenoliths were acquired before and/or during interaction of the oceanic lithosphere with the Hawaiian plume will be discussed.

Peslier, Anne H.↗

The Ares Projects: Building America's Future in Space

NASA's Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. In 2009, the Ares Projects plan to conduct the first test flight of Ares I, Ares I-X; the first firing of a five-segment development solid rocket motor for the Ares I first stage; building the first integrated Ares I upper stage; continue component testing for the J-2X upper stage engine; and perform more-detailed design studies for the Ares V cargo launch vehicle. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human spaceflight to the Moon and beyond.

Cook, Stephen A.↗

Cosmo Cassette: A Microfluidic Microgravity Microbial System For Synthetic Biology Unit Tests and Satellite Missions

Although methods in the design-build-test life cycle of the synthetic biology field have grown rapidly, the expansion has been non-uniform. The design and build stages in development have seen innovations in the form of biological CAD and more efficient means for building DNA, RNA, and other biological constructs. The testing phase of the cycle remains in need of innovation. Presented will be both a theoretical abstraction of biological measurement and a practical demonstration of a microfluidics-based platform for characterizing synthetic biological phenomena. Such a platform demonstrates a design of additive manufacturing (3D printing) for construction of a microbial fuel cell (MFC) to be used in experiments carried out in space. First, the biocompatibility of the polypropylene chassis will be demonstrated. The novel MFCs will be cheaper, and faster to make and iterate through designs. The novel design will contain a manifold switchingdistribution system and an integrated in-chip set of reagent reservoirs fabricated via 3D printing. The automated nature of the 3D printing yields itself to higher resolution switching valves and leads to smaller sized payloads, lower cost, reduced power and a standardized platform for synthetic biology unit tests on Earth and in space. It will be demonstrated that the application of unit testing in synthetic biology will lead to the automatic construction and validation of desired constructs. Unit testing methodologies offer benefits of preemptive problem identification, change of facility, simplicity of integration, ease of documentation, and separation of interface from implementation, and automated design.

Bioelectrochemical System↗

An interpretation of volcanic and structural features of crater Aitken

Detailed observations from the study of Apollo 17 panoramic photography of the Aitken crater are reported which suggest that there has been significant late-stage compressional deformation of the crater and its adjacent highlands. A speculative interpretation of eruptive activity and drain-back events within Aitken is presented, which leads to the conclusion that hummocky topography within certain cones represents collapsed lava rather than extrusive domes. That is, eruptive activity within Aitken probably commenced with an explosive cone-building stage, followed by lava eruptions from cones and fissures, and ended with drain-back restricted to the relatively deep lava ponded in the vents.

Bryan, W. B.↗

An on-line equivalent system identification scheme for adaptive control

A prime obstacle to the widespread use of adaptive control is the degradation of performance and possible instability resulting from the presence of unmodeled dynamics. The approach taken is to explicitly include the unstructured model uncertainty in the output error identification algorithm. The order of the compensator is successively increased by including identified modes. During this model building stage, heuristic rules are used to test for convergence prior to designing compensators. Additionally, the recursive identification algorithm as extended to multi-input, multi-output systems. Enhancements were also made to reduce the computational burden of an algorithm for obtaining minimal state space realizations from the inexact, multivariate transfer functions which result from the identification process. A number of potential adaptive control applications for this approach are illustrated using computer simulations. Results indicated that when speed of adaptation and plant stability are not critical, the proposed schemes converge to enhance system performance.

Sliwa, S. M.↗

A Study of the Role of Clouds in the Relationship Between Land Use/Land Cover and the Climate and Air Quality of the Atlanta Area

The goal of Project ATLANTA is to derive a better scientific understanding of how land cover changes associated with urbanization affect local and regional climate and air quality. Clouds play a significant role in this relationship. Using GOES images, we found that in a 63-day period (5 July-5 September 1996) there were zero days which were clear for the entire daylight period. Days which are cloud-free in the morning become partly cloudy with small cumulus clouds in the afternoon in response to solar heating. This result casts doubt on the applicability of California-style air quality models which run in perpetual clear skies. Days which are clear in the morning have higher ozone than those which are cloudy in the morning. Using the RAMS model, we found that urbanization increases the skin surface temperature by about 1.0-1.5 C on average under cloudy conditions, with an extreme of +3.5 C. Clouds cool the surface due to their shading effect by 1.5-2.0 C on average, with an extreme of 5.0 C. RAMS simulates well the building stage of the cumulus cloud field, but does poorly in the decaying phase. Next year's work: doing a detailed cloud climatology and developing improved RAMS cloud simulations.

Kidder, Stanley Q.↗

Ares I First Stage Progress

Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle derived reusable solid rocket motor. Significant progress has been made to date by the Ares First Stage Team. This brief status provides an update on the design and development of the Ares First Stage propulsion system.

Brasfield, Fred↗

Risk-Based Explosion Assessment Internal Explosion of Exploration Upper Stage in Vehicle Assembly Building

This paper presents risk-based explosion analyses used to determine if an explosion of NASA's Space Launch System (SLS) Exploration Upper Stage (EUS) during fueling in Vehicle Assembly Building (VAB) High Bay 4 can hazard the Space Launch System (SLS) being processed in Bay 3. This paper focuses on blast fragmentation as it was the controlling hazard. An estimate of the amount of Net Explosion Weight (NEW) was used to develop a fragment list (mass, shape, takeoff velocity/angle) given an explosion occurs at ground level in Bay 4. Intervening superstructure that exists between Bay 4 and Bay 3 (that could potentially block EUS fragments) was modeled based on detailed visual images (VISSIM) and AUTOCAD/structural drawings. The fragment list was input to a 3D trajectory application that performs multiple random explosion simulations; each simulation varying fragment ballistic coefficient and takeoff angle/velocity. Individual fragments are tracked until stopped by the intervening superstructure or reach Bay 3, potentially impacting the SLS. The probability of impacting the SLS is then determined from the random simulations; the results are used to help decision-makers determine the efficacy of co-processing within the VAB and decide what mitigations may be appropriate.

Explosion Assessment↗

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗

Preliminary design, analysis, and costing of a dynamic scale model of the NASA space station

The difficulty of testing the next generation of large flexible space structures on the ground places an emphasis on other means for validating predicted on-orbit dynamic behavior. Scale model technology represents one way of verifying analytical predictions with ground test data. This study investigates the preliminary design, scaling and cost trades for a Space Station dynamic scale model. The scaling of nonlinear joint behavior is studied from theoretical and practical points of view. Suspension system interaction trades are conducted for the ISS Dual Keel Configuration and Build-Up Stages suspended in the proposed NASA/LaRC Large Spacecraft Laboratory. Key issues addressed are scaling laws, replication vs. simulation of components, manufacturing, suspension interactions, joint behavior, damping, articulation capability, and cost. These issues are the subject of parametric trades versus the scale model factor. The results of these detailed analyses are used to recommend scale factors for four different scale model options, each with varying degrees of replication. Potential problems in constructing and testing the scale model are identified, and recommendations for further study are outlined.

Gronet, M. J.↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Spacecraft Adhesive Residue On-Composite Analysis

Tapes are used on space vehicles for numerous reasons. They are used for taping close ports, labeling, and even temporarily attaching something to the spacecraft. This project stemmed from the need to determine which tapes are most effective for our customer's space vehicle during its ground processing stage. During ground processing, there are multiple stages of building where workers need to use tape to temporarily stabilize or close something for a matter of seconds, days, weeks, or even a few months. After peeling these tapes off the flight hardware, the residue left behind by the tape poses potential risks that can lead to incidents, which may not be easily noticeable to the engineers. It is important to identify these issues since nothing can be done once it is in space. The purpose of this project is to assist in research to create an accessible reference for which tapes are preferred on common flight hardware surfaces. Five different substrates and eight tapes were selected for evaluation. The selected substrates were chosen because they comprise the most surface area on the vehicle. The tapes selected were either heritage or new contenders. The adhesive studies were performed for multiple dwell times to study the tendency of different tapes to leave residue behind on various substrates and quantifying that residue. Many other tests were performed to supplement the main objective of the project. These tests included adhesive solubility, peel adhesion, and SEM analyses.

McFadden, Saleah J.↗

Achieving High Efficiency in Reduced Order Modeling for Large Scale Polycrystal Plasticity Simulations

Reduced order models for the nonlinear response of heterogeneous microstructures typically require a construction (or training) stage to build the reduced order basis. In this manuscript, an efficient model construction strategy for the eigenstrain homogenization method (EHM) is presented. The proposed strategy relies on a parallel, element-by-element, conjugate gradient solver. Near linear scaling has been achieved with respect to the number of degrees of freedom used to resolve the microstructure. Linear scaling with respect to the number of pre-analyses required to construct the reduced order model (ROM) follows from the EHM formulation. Furthermore, a parallel implementation for fast evaluation of the constructed ROM has been developed using shared memory parallelization. It has been shown that for large microstructures with ≈ 10,000 grains, the total computational cost of evaluating the nonlinear response of a polycrystal could be reduced by approximately an order of magnitude using 32 cores with respect to serial ROM simulation. The present methodology has been verified using an additively manufactured polycrystalline microstructure of a nickel-based superalloy, Inconel 625. The capability of the developed framework to construct a ROM for such large microstructures, as well as the ability of the ROM to predict average and local quantities of interest has been demonstrated.

microscale↗

Pathways to International Coordination in Space Weather

The United Nations Committee for the Peaceful Uses of Outer Space(UN-COPUOS) in its 2022 Space Weather Expert Group report, called upon the World Meteorological Organization (WMO), the InternationalSpace Environment Service (ISES) and the Committee on Space Research (COSPAR) to take a leadership role in improving the global coordination of space weather activities in consultation and collaboration with other relevant actors and international organizations. The three organizations have established a framework for trusting partnership while minimizing duplication of efforts and have agreed on three distinct domains in which the particular expertise and strengths of each of the three were identified: Research and Development (COSPAR), Facilitating Integration (WMO), andServices (ISES). The next stage in building a pathway to improved coordination is to lay the same foundation with other relevant organizations and actors engaged in space weather. We will present outcomes of the first International Space Weather Coordination Forum intending to shape the future of international collaboration on space weather with the ultimate aim of increasing the community’s ability to mitigate space environment threats. We will discuss approaches to alignments of bottom-up initiatives and community-driven roadmaps with national/regional strategic planning activities and funding programs. We will also review opportunities for taking advantage ofInternational Space Weather Action Teams (ISWAT) for planning pilot projects to demonstrate the value of collaboration and coordination.

Maria M Kuznetsova↗

A walk through the planned CS building

Using the architectural plan views of our future computer science building as test objects, we have completed the first stage of a Building walkthrough system. The inputs to our system are AutoCAD files. An AutoCAD converter translates the geometrical information in these files into a format suitable for 3D rendering. Major model errors, such as incorrect polygon intersections and random face orientations, are detected and fixed automatically. Interactive viewing and editing tools are provided to view the results, to modify and clean the model and to change surface attributes. Our display system provides a simple-to-use user interface for interactive exploration of buildings. Using only the mouse buttons, the user can move inside and outside the building and change floors. Several viewing and rendering options are provided, such as restricting the viewing frustum, avoiding wall collisions, and selecting different rendering algorithms. A plan view of the current floor, with the position of the eye point and viewing direction on it, is displayed at all times. The scene illumination can be manipulated, by interactively controlling intensity values for 5 light sources.

Khorramabadi, Delnaz↗

Multi-Stage ADRs for Current and Future Astronomy Missions: Performance and Requirements for Cryogen-Free Operation

The cooling requirements for current (e.g. Astro-H) and future (e.g. IXO and ASP) astronomy missions pose significant challenges for the sub-Kelvin Cooler. In particular, the use of large detector arrays increases the cooling power needed, and the variety of cryocoolers that can be used for pre-cooling greatly expands the range of temperatures at which the sub-Kelvin cooler can be designed to reject heat. In most cases, there is also a need for a stable higher temperature stage for cooling amplifiers or telescope components. NASA/GSFC is currently building a 3-stage ADR for the Astro-H mission, and is developing a 5-stage ADR suitable for IXO and ASP, as well as many other missions in the early planning stages. The architecture of these ADRs allows them to be adapted rather easily for different cooling requirements and to accommodate different cryocooler capabilities (operating temperature and cooling power). This paper will discuss the performance of these ADRs, which operate in both continuous, and single-shot cooling modes, and the minimum cryocooler capabilities needed to meet the requirements of future missions.

Shirron, Peter↗

Reusable Agena study. Volume 1: Executive summary

The shuttle Agena upper stage interim tug concept is based on a building block approach. These building block concepts are extensions of existing ascent Agena configurations. Several current improvements, have been used in developing the shuttle/Agena upper stage concepts. High-density acid is used as the Agena upper stage oxidizer. The baffled injector is used in the main engine. The DF-224 is a fourth generation computer currently in development and will be flight proven in the near future. The Agena upper stage building block concept uses the current Agena as a baseline, adds an 8.5-inch (21.6 cm) extension to the fuel tank for optimum mixture ratio, uses monomethyl hydrazine as fuel, exchanges a 150:1 nozzle extension for the existing 45:1, exchanges an Autonetics DF-224 for the existing Honeywell computer, and adds a star sensor for guidance update. These modifications to the current Agena provide a 5-foot (1.52m) diameter shuttle/Agena upper stage that will fly all Vandenberg Air Force Base missions in the reusable mode without resorting to a kick motor. The delta V velocity of the Agena is increased by use of a strap-on propellant tank option. This option provides a shuttle/Agena upper stage with the capability to place almost 3900 pounds (1769 kg) into geosynchronous orbit (24 hour period) without the aid of kick motors.

Source record↗

Chondritic Models of 4 Vesta: Comparison of Predicted Internal Structure and Surface Composition/Mineralogy with Data from the Dawn Mission

Understanding the physical and chemical processes which led to the formation of the terrestrial planets remains one of the principal challenges of the Earth and planetary science communities. However, direct traces of the earliest stages of planet building have generally been wiped out on larger bodies such as the Earth or Mars, obscuring our view of how that process occurred. On the other hand, the planet building process would appear to have been arrested prematurely in the region between Mars and Jupiter, now populated by several hundred thousand compositionally diverse objects that escaped accretion into larger planets. Of these, the asteroid 4 Vesta is of particular interest as it is large (520 km diameter), and known to have a basaltic surface dominated by pyroxenes [1, 2]. Furthermore, visible-IR spectra of Vesta obtained by ground and space-based telescopes are remarkably similar to laboratory spectra measured on meteorites of the Howardite-Eucrite-Diogenite clan (HED), leading to the paradigm that the HEDs came from Vesta [2]. Geochemical and petrological studies of the HEDs confirm the differentiated nature of the near-surface region of their parent body, and imply that crust extraction occurred well within the first 10Ma of solar system history [3]. Vesta is therefore a prime target for studies that aim to constrain the earliest stages of planet building, and for that reason it is currently the subject of the Dawn mission [4].

Toplis, M. J.↗