Search NASA⌕ Search

SEARCH · Search NASA

Results for “Start Date”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed to maximize program benefits and address limiting factors.

13 HYDRO ENERGY↗

Radiation capture and conversion efficiencies of Miscanthus sacchariflorus , M. sinensis and their naturally occurring hybrid M . × giganteus

Abstract Miscanthus is a rhizomatous C4 grass of great interest as a biofuel crop because it has the potential to produce high yields over a wide geographical area with low agricultural inputs on marginal land less suitable for food production. At the moment, a clonal interspecific hybrid Miscanthus × giganteus is the most widely cultivated and studied in Europe and the United States, but breeding programmes are developing newer more productive varieties. Here, we quantified the physiological processes relating to whole season yield in a replicated plot trial in Wales, UK . Light capture and conversion efficiency were parameterized for four carefully selected genotypes ( M. sinensis , M. sacchariflorus and Miscanthus × giganteus ). Differences in the canopy architecture in mature stands as measured by the extinction coefficient ( k ) were small (0.55–0.65). Sensitivity analysis on a mathematical model of Miscanthus was performed to quantify the accumulative intercepted photosynthetically active radiation ( iPAR ) in the growing season using (i) k, (ii) variation in the thermal responses of leaf expansion rate, (iii) base temperature for degree days and (iv) date start of canopy expansion. A 10% increase in k or leaf area per degree day both had a minimal effect on iPAR (3%). Decreasing base temperature from 10 to 9 °C gave an 8% increase in iPAR . If the starting date for canopy expansion was the same as shoot emergence date, then the iPAR increases by 12.5%. In M . × giganteus, the whole season above ground and total (including below ground) radiation‐use efficiency ( RUE ) ranged from 45% to 37% higher than the noninterspecific hybrid genotypes. The greater yields in the interspecific hybrid M. × giganteus are explained by the higher RUE and not by differences in iPAR or partitioning effects. Studying the mechanisms underlying this complex trait could have wide benefits for both fuel and food production.

Davey, Christopher Lyndon↗

Objective Lightning Probability Forecasting for Kennedy Space Center and Cape Canaveral Air Force Station, Phase III

The AMU created new logistic regression equations in an effort to increase the skill of the Objective Lightning Forecast Tool developed in Phase II (Lambert 2007). One equation was created for each of five sub-seasons based on the daily lightning climatology instead of by month as was done in Phase II. The assumption was that these equations would capture the physical attributes that contribute to thunderstorm formation more so than monthly equations. However, the SS values in Section 5.3.2 showed that the Phase III equations had worse skill than the Phase II equations and, therefore, will not be transitioned into operations. The current Objective Lightning Forecast Tool developed in Phase II will continue to be used operationally in MIDDS. Three warm seasons were added to the Phase II dataset to increase the POR from 17 to 20 years (1989-2008), and data for October were included since the daily climatology showed lightning occurrence extending into that month. None of the three methods tested to determine the start of the subseason in each individual year were able to discern the start dates with consistent accuracy. Therefore, the start dates were determined by the daily climatology shown in Figure 10 and were the same in every year. The procedures used to create the predictors and develop the equations were identical to those in Phase II. The equations were made up of one to three predictors. TI and the flow regime probabilities were the top predictors followed by 1-day persistence, then VT and Ll. Each equation outperformed four other forecast methods by 7-57% using the verification dataset, but the new equations were outperformed by the Phase II equations in every sub-season. The reason for the degradation may be due to the fact that the same sub-season start dates were used in every year. It is likely there was overlap of sub-season days at the beginning and end of each defined sub-season in each individual year, which could very well affect equation performance.

Crawford, Winifred C.↗

System-Level Logistics for Dual Purpose Canister Disposal

The analysis presented in this report investigated how the direct disposal of dual purpose canisters (DPCs) may be affected by the use of standard transportation aging and disposal canisters (STADs), early or late start of the repository, and the repository emplacement thermal power limits. The impacts were evaluated with regard to the availability of the DPCs for emplacement, achievable repository acceptance rates, additional storage required at an interim storage facility (ISF) and additional emplacement time compared to the corresponding repackaging scenarios, and fuel age at emplacement. The result of this analysis demonstrated that the biggest difference in the availability of UNF for emplacement between the DPC-only loading scenario and the DPCs and STADs loading scenario is for a repository start date of 2036 with a 6 kW thermal power limit. The differences are also seen in the availability of UNF for emplacement between the DPC-only loading scenario and the DPCs and STADs loading scenario for the alternative with a 6 kW thermal limit and a 2048 start date, and for the alternatives with a 10 kW thermal limit and 2036 and 2048 start dates. The alternatives with disposal of UNF in both DPCs and STADs did not require additional storage, regardless of the repository acceptance rate, as compared to the reference repackaging case. In comparison to the reference repackaging case, alternatives with the 18 kW emplacement thermal limit required little to no additional emplacement time, regardless of the repository start time, the fuel loading scenario, or the repository acceptance rate. Alternatives with the 10 kW emplacement thermal limit and the DPCs and STADs fuel loading scenario required some additional emplacement time. The most significant decrease in additional emplacement time occurred in the alternative with the 6 kW thermal limit and the 2036 repository starting date. The average fuel age at emplacement ranges from 46 to 88 years. The maximum fuel age at emplacement ranges from 81 to 146 years. The difference in the average and maximum age of fuel at emplacement between the DPC-only and the DPCs and STADs fuel loading scenarios becomes less significant as the repository thermal limit increases and as the repository start date increases. In general, the role of STADs is to store young (30 year or younger) high burnup (45 GWD/MTU or higher) fuel. Recommendations for future study include detailed evaluation of the feasible alternatives with regard to the costs and factors not considered in this analysis, such as worker dose, dose to members of the public, and economic benefits to host entities. It is also recommended to conduct an additional analysis to evaluate the assumption regarding the transportability and disposability of DPCs for the next iteration of the direct disposal of DPCs study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Industry Input to the Development of Concepts for the Consolidated Storage of Used Nuclear Fuel - 13411

EnergySolutions and its team partners, NAC International, Exelon Nuclear Partners, Talisman International, TerranearPMC, Booz Allen Hamilton and Sargent and Lundy, have carried out a study to develop concepts for a Consolidated Storage Facility (CSF) for the USA's stocks of commercial Used Nuclear Fuel (UNF), and the packaging and transport provisions required to move the UNF to the CSF. The UNF is currently stored at all 65 operating nuclear reactor sites in the US, and at 10 shutdown sites. The study was funded by the US Department of Energy and followed the recommendations of the Blue Ribbon Commission on America's Nuclear Future (BRC), one of which was that the US should make prompt efforts to develop one or more consolidated storage facilities for commercial UNF. The study showed that viable schemes can be devised to move all UNF and store it at a CSF, but that a range of schemes is required to accommodate the present widely varying UNF storage arrangements. Although most UNF that is currently stored at operating reactor sites is in water-filled pools, a significant amount is now dry stored in concrete casks. At the shutdown sites, the UNF is dry stored at all but two of the ten sites. Various types of UNF dry storage configurations are used at the operating sites and shutdown sites that include vertical storage casks that are also licensed for transportation, vertical casks that are licensed for storage only, and horizontally orientated storage modules. The shutdown sites have limited to nonexistent UNF handling infrastructure and several no longer have railroad connections, complicating UNF handling and transport off the site. However four methods were identified that will satisfactorily retrieve the UNF canisters within the storage casks and transport them to the CSF. The study showed that all of the issues associated with the transportation and storage of UNF from all sites in the US can be accommodated by adopting a staged approach to the construction of the CSF. Stage 1 requires only a cask storage pad and railroad interface to be constructed, and the CSF can then receive the UNF that is in transportable storage casks. Stage 2 adds a canister handling facility, a storage cask fabrication facility and an expanded storage pad, and enables the receipt of all canistered UNF from both operating and shutdown sites. Stage 3 provides a repackaging facility with a water-filled pool that provides flexibility for a range of repackaging scenarios. This includes receiving and repackaging 'bare' UNF into suitable canisters that can be placed into interim storage at the CSF, and enables UNF that is being received, or already in storage onsite, to be repackaged into canisters that are suitable for disposal at a geologic repository. The study used the 'Total System Model' (TSM) to analyze a range of CSF capacities and operating scenarios with differing parameters covering UNF pickup orders, one or more CSF sites, CSF start dates, CSF receipt rates and geologic repository start dates. The TSM was originally developed to model movement of UNF to the Yucca Mountain repository and was modified for this study to enable the CSF to become the 'gateway' to a future geologic repository. The TSM analysis enabled costs to be estimated for each scenario and showed how these are influenced by each of the parameters. This information will provide essential underpinning for a future Conceptual Design preparation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report for Project DE-FG02-05ER15718 Fluoropolymers, Electrolytes, Composites and Electrodes

This report is for a project that was initiated under the title “New Proton-Conducting Fluoropolymer Electrolytes for PEM Fuel Cells”, as part of the DOE program titled “Basic Research for the Hydrogen Fuel Cell Initiative”, Program Notice DE-FG01-04ER04-20. The project received 750,000 dollars in initial funding for a three-year term with a start date of August 15, 2005. Creager was PI and co-PIs were DesMarteau and Smith, all from Clemson. The project was renewed for a second three-year term with a start date of June 15 2008, again for 750,000 dollars, with the new title, “Fluoropolymers, Electrolytes, Composites and Electrodes”. Shortly after the renewal was put in place, co-PI Smith left Clemson to accept a position at the University of Texas at Dallas. After a period of no-cost extension the project was renewed on January 1 2013 for another three-year term, this time for a smaller amount ($525,000) and with Thrasher, a new senior hire at Clemson, as co-PI in place of Smith. DesMarteau had retired from Clemson by this time but was retained as a project advisor. After a final one-year no-cost extension for calendar year 2016, the project ended on December 31, 2016, giving it an active period of eleven and one-half years, from August 15 2005 to December 31 2016. The overall objective of this research project has been to create and understand the behavior of new fluoropolymer-based electrolytes and electrodes suitable for use in electrochemical energy storage and conversion devices. The objective was pursued via research on new fluorinated monomers, new polymers and polyelectrolytes (also known as ionomers), and new electrocatalyst supports that in some cases include chemically grafted electrolytes to promote rapid ion transport to electrocatalytically active sites (usually platinum nanoparticles) on the support. The research involved synthesis and characterization of new materials, and creation and use of new measurement techniques that address key properties of the materials, e.g. mixed electronic / ionic conduction in the absence of liquid electrolyte, that are relevant to their use in energy conversion and storage.

30 DIRECT ENERGY CONVERSION↗

Investigations of dual-purpose canister direct disposal feasibility - 15106

Direct disposal of commercial spent nuclear fuel (SNF) in dual-purpose canisters (DPCs) could avoid the cost and complexity of re-packaging spent fuel into smaller purpose-built containers, avoid disposing of the DPC hulls as low-level waste, and potentially decrease worker dose. Technical objectives for disposal are: 1) safety of workers and the public, 2) engineering feasibility; 3) thermal management; and 4) criticality control after permanent closure of a repository. The postclosure safety case for DPC direct disposal would resemble that for any repository-waste isolation would be enhanced by choosing host geology in which radionuclide transport is diffusion dominated, and for which transport properties and pathways are insensitive to the expected temperature history. Containment functions would be assigned to the disposal overpack, and published data show that suitable materials exist for most possible disposal environments. Earlier studies showed that DPC-based waste packages would be only slightly larger and heavier than those proposed for a repository in volcanic tuff. Engineered solutions are available for transporting and emplacing them underground, although some could be the largest of their kind. The cost of DPC direct disposal in various geologic settings has been compared to options involving a change to loading standardized multi-purpose canisters, or continuing to load DPCs and re-packaging all of them for disposal. In general DPC direct disposal would cost tens of billions of dollars less, in packaging and disposal costs. Calculations for emplacement in hard rock and sedimentary rock show that host rock peak temperature targets of 100 to 200 deg.C could be met by managing fuel age and burnup, with repository closure at up to 150 years from reactor discharge. For disposal in salt, DPC-based waste packages could be emplaced at only 50 to 100 years from discharge, depending on burnup. Sedimentary media such as shales pose special challenges especially if they have low thermal conductivity. If backfill is used around DPC-based packages its peak temperature could be 150 to 200 deg.C. Without flooding of waste packages with ground water, criticality can never occur. However, some small number of disposal overpacks could fail within the postclosure performance period due to corrosion or disruptive events. Once flooded, the aluminum-based neutron absorber materials used in most DPCs would readily degrade. Analysis has shown that even without neutron absorbers, virtually all DPCs could be subcritical if flooded with chloride brines such as would occur in a salt repository. The licensing basis for existing DPCs involves criticality analysis that may be conservative compared to fuel that is actually loaded, and the difference provides uncredited reactivity margin. Uncredited margin can offset increases in reactivity associated with flooding and basket degradation. For flooding with fresh water, with loss of neutron absorbers, many DPCs have been shown to be subcritical using uncredited margin. Significantly fewer are subcritical if the fuel basket also degrades. Thus, the materials of DPC basket construction (e.g., aluminum or carbon steel) could be deleterious if they fully corrode, along with the neutron absorbers, during the performance period. Logistical simulations are used to better understand the relationship between the needed DPC decay storage time for disposal, and the timing of future events such as the repository opening date, or a transition to loading multi-purpose (disposable) canisters at nuclear power plants. Results show that the maximum benefit from implementing a new canister design, with respect to shortening the cooling time for all SNF including that in DPCs, is associated with the earliest repository start date. As time passes more of the total SNF inventory will be in DPCs such that the value of a transition to multi-purpose canisters will decline, and the remaining options are DPC direct disposal and re-packaging in purpose-designed disposal canisters. Fuel age at emplacement is of interest to evaluate potential impacts from future changes in the fuel management system that could place fuel age limits on dry storage or transportation. The minimum fuel age at emplacement (best-case) is obtained by re-packaging all DPCs into smaller canisters for disposal, thus drastically decreasing the needed decay storage time for any geologic disposal setting. If the industry transitions to smaller, multi-purpose canisters, and without re-packaging, the fuel age at emplacement would be comparable to the best case if: 1) the emplacement power limit is high enough, or 2) both the transition and the repository start date occur early (e.g., 2036 was analyzed). Technical feasibility evaluation continues to show that direct disposal could be safe and cost effective, for some DPCs and in some geologic settings. Direct disposal of a substantial fraction of existing DPCs, limited mainly by thermal management, uncredited criticality margin, materials of DPC basket construction, and the salinity of ground water in the disposal environment, could be part of the overall waste management system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uncertainty Analysis of Historical Hurricane Data

An analysis of variance (ANOVA) study was conducted for historical hurricane data dating back to 1851 that was obtained from the U. S. Department of Commerce National Oceanic and Atmospheric Administration (NOAA). The data set was chosen because it is a large, publicly available collection of information, exhibiting great variability which has made the forecasting of future states, from current and previous states, difficult. The availability of substantial, high-fidelity validation data, however, made for an excellent uncertainty assessment study. Several factors (independent variables) were identified from the data set, which could potentially influence the track and intensity of the storms. The values of these factors, along with the values of responses of interest (dependent variables) were extracted from the data base, and provided to a commercial software package for processing via the ANOVA technique. The primary goal of the study was to document the ANOVA modeling uncertainty and predictive errors in making predictions about hurricane location and intensity 24 to 120 hours beyond known conditions, as reported by the data set. A secondary goal was to expose the ANOVA technique to a broader community within NASA. The independent factors considered to have an influence on the hurricane track included the current and starting longitudes and latitudes (measured in degrees), and current and starting maximum sustained wind speeds (measured in knots), and the storm starting date, its current duration from its first appearance, and the current year fraction of each reading, all measured in years. The year fraction and starting date were included in order to attempt to account for long duration cyclic behaviors, such as seasonal weather patterns, and years in which the sea or atmosphere were unusually warm or cold. The effect of short duration weather patterns and ocean conditions could not be examined with the current data set. The responses analyzed were the storm latitude, longitude and intensity, as recorded in the data set, 24 or 120 hours beyond the current state. Several ANOVA modeling schemes were examined. Two forms of validation were used: 1) comparison with official hurricane prediction performance metrics and 2) cases studies conducted on hurricanes from the 2005 season, which were not included within the model construction and ANOVA assessment. In general, the ANOVA technique did not perform as well as the established official prediction performance metrics published by NOAA; still, the technique did remarkably well in this demonstration with a difficult data set and could probably be made to perform better with more knowledge of hurricane development and dynamics applied to the problem. The technique provides a repeatable prediction process that eliminates the need for judgment in the forecast.

Green, Lawrence L.↗

Kicking the can down the road: understanding the effects of delaying the deployment of stratospheric aerosol injection

Abstract Climate change is a prevalent threat, and it is unlikely that current mitigation efforts will be enough to avoid unwanted impacts. One potential option to reduce climate change impacts is the use of stratospheric aerosol injection (SAI). Even if SAI is ultimately deployed, it might be initiated only after some temperature target is exceeded. The consequences of such a delay are assessed herein. This study compares two cases, with the same target global mean temperature of ∼1.5° C above preindustrial, but start dates of 2035 or a ‘delayed’ start in 2045. We make use of simulations in the Community Earth System Model version 2 with the Whole Atmosphere Coupled Chemistry Model version 6 (CESM2-WACCM6), using SAI under the SSP2-4.5 emissions pathway. We find that delaying the start of deployment (relative to the target temperature) necessitates lower net radiative forcing (−30%) and thus larger sulfur dioxide injection rates (+20%), even after surface temperatures converge, to compensate for the extra energy absorbed by the Earth system. Southern hemisphere ozone is higher from 2035 to 2050 in the delayed start scenario, but converges to the same value later in the century. However, many of the surface climate differences between the 2035 and 2045 start simulations appear to be small during the 10–25 years following the delayed SAI start, although longer simulations would be needed to assess any longer-term impacts in this model. In addition, irreversibilities and tipping points that might be triggered during the period of increased warming may not be adequately represented in the model but could change this conclusion in the real world.

Brody, Ezra (ORCID:000900030008681X)↗

Utah State University's contribution to Enhancing Understanding of High Energy Density Plasmas from Wire Array and Solid Liner Implosions Using Fluid Modeling with Kinetic Closures (Final Report)

This final report pertains to work performed at Utah State University (USU) on the subject of kinetic closures for fluid simulations of high-energy-density (HED) plasmas. This report was written following the end date of the three year grant that started August 1, 2016, and ended July 31, 2019. The key aspect of the work at USU was to develop and implement kinetic closures for fluid simulations of more strongly coupled plasmas. Funds for this project provided some summer salary for the PI at USU, Dr. Eric Held, but mainly provided a robust stipend for his graduate student, David Hansen, who has worked on the project since the start date. Mr. Hansen is nearing completion of his PhD thesis which he will defend either in December of 2019 or the spring of 2020. With this award Dr. Eric Held and his PhD student David Hansen developed a computer code called {\bf X-section} that can be used to generate collisional scattering cross sections which summarize particle interactions in high-energy-density plasmas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Aerocapture Solutions for Uranus Flagship-class Orbiter and Probe

Recent planetary mission assessments, such as the 2022 Planetary Science Decadal Survey released by the National Academies of Science, have focused on the need for a flagship-class mission to the Ice Giant planets, particularly Uranus. The Uranus Orbit and Probe mission proposal was used by the National Academies of Science as the baseline while making its recommendation as the top flagship-class mission for NASA in the 2020-2030\'s. This mission which was based on a launch date of 2031 or 2032, used a fully-propulsive orbit insertion maneuver at Uranus (requiring 60-70% of total mass for propellant), and reached the planet after 13 years of interplanetary cruise before the 2049 equinox, a goal of the science community. A pre-2033 launch date is required to conduct a necessary Jupiter fly-by as the giant planet will be not be in the proper alignment for a later launch date. However, as the budget constraints of the NASA budget have pushed back the start date of a Uranus mission, a launch date of a flagship mission before 2033 seems unreasonable. Aerocapture, an orbit insertion maneuver that uses the atmosphere to decelerate, can reduce the propellant load needed for a captured orbit. Additionally, the aerocapture maneuver can decelerate safely while approaching the planet at higher arrival velocities, thus allowing a mission to use a highly energetic trajectory and reduce the cruise time by several years. An aerocapture-enabled solution has launch opportunities in the mid 2030's, including as late as 2038 to reach Uranus by 2049. This paper will discuss the feasibility of an aerocapture option for a Flagship-class mission to Uranus.

Soumyo Dutta↗

Aerocapture Solutions for Uranus Flagship-class Orbiter and Probe

Recent planetary mission assessments, such as the 2022 Planetary Science Decadal Survey released by the National Academies of Science, have focused on the need for a flagship-class mission to the Ice Giant planets, particularly Uranus. The Uranus Orbit and Probe mission proposal was used by the National Academies of Science as the baseline while making its recommendation as the top flagship-class mission for NASA in the 2020-2030\'s. This mission which was based on a launch date of 2031 or 2032, used a fully-propulsive orbit insertion maneuver at Uranus (requiring 60-70% of total mass for propellant), and reached the planet after 13 years of interplanetary cruise before the 2049 equinox, a goal of the science community. A pre-2033 launch date is required to conduct a necessary Jupiter fly-by as the giant planet will be not be in the proper alignment for a later launch date. However, as the budget constraints of the NASA budget have pushed back the start date of a Uranus mission, a launch date of a flagship mission before 2033 seems unreasonable. Aerocapture, an orbit insertion maneuver that uses the atmosphere to decelerate, can reduce the propellant load needed for a captured orbit. Additionally, the aerocapture maneuver can decelerate safely while approaching the planet at higher arrival velocities, thus allowing a mission to use a highly energetic trajectory and reduce the cruise time by several years. An aerocapture-enabled solution has launch opportunities in the mid 2030's, including as late as 2038 to reach Uranus by 2049. This paper will discuss the feasibility of an aerocapture option for a Flagship-class mission to Uranus.

Soumyo Dutta↗

MISR Browse data (MISBR_V5)

A MISR Browse Tool is available to allow easy access to ellipsoid-derived, true-color images for each camera reduced to 2.2 km resolution. The MISR red, green and blue bands are used to create the true-color image in JPEG format. The image is intentionally clipped and gamma-stretched to make cloud, ocean and land features visible. The user may find the Browse Tool helpful before ordering data. The tool's purpose is to search and view images in the on-line user interface. However, the browse product can be ordered separately. The Browse Tool page has Orbit-to-Date and Lat/Lon-to-Path/Block conversion tools to help identify particular MISR geographic locations and data files. [Temporal_Coverage: Start_Date=2000-02-24; Stop_Date=] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180] [Data_Resolution: Latitude_Resolution=2.2 km; Longitude_Resolution=2.2 km; Horizontal_Resolution_Range=1 km - < 10 km or approximately .01 degree - < .09 degree; Temporal_Resolution=about 15 orbits/day; Temporal_Resolution_Range=Daily - < Weekly].

EOSDIS↗

MISR Browse data (MISBR_V3)

A MISR Browse Tool is available to allow easy access to ellipsoid-derived, true-color images for each camera reduced to 2.2 km resolution. The MISR red, green and blue bands are used to create the true-color image in JPEG format. The image is intentionally clipped and gamma-stretched to make cloud, ocean and land features visible. The user may find the Browse Tool helpful before ordering data. The tool's purpose is to search and view images in the on-line user interface. However, the browse product can be ordered separately. The Browse Tool page has Orbit-to-Date and Lat/Lon-to-Path/Block conversion tools to help identify particular MISR geographic locations and data files. [Location=GLOBAL] [Temporal_Coverage: Start_Date=2000-02-24; Stop_Date=] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180] [Data_Resolution: Latitude_Resolution=2.2 km; Longitude_Resolution=2.2 km; Horizontal_Resolution_Range=1 km - < 10 km or approximately .01 degree - < .09 degree; Temporal_Resolution=about 15 orbits/day; Temporal_Resolution_Range=Daily - < Weekly].

EOSDIS↗

MISR Browse data (MISBR_V4)

A MISR Browse Tool is available to allow easy access to ellipsoid-derived, true-color images for each camera reduced to 2.2 km resolution. The MISR red, green and blue bands are used to create the true-color image in JPEG format. The image is intentionally clipped and gamma-stretched to make cloud, ocean and land features visible. The user may find the Browse Tool helpful before ordering data. The tool's purpose is to search and view images in the on-line user interface. However, the browse product can be ordered separately. The Browse Tool page has Orbit-to-Date and Lat/Lon-to-Path/Block conversion tools to help identify particular MISR geographic locations and data files. [Location=GLOBAL] [Temporal_Coverage: Start_Date=2000-02-24; Stop_Date=] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180] [Data_Resolution: Latitude_Resolution=2.2 km; Longitude_Resolution=2.2 km; Horizontal_Resolution_Range=1 km - < 10 km or approximately .01 degree - < .09 degree; Temporal_Resolution=about 15 orbits/day; Temporal_Resolution_Range=Daily - < Weekly].

IMAGE↗

Kootenai River Nutrient Dosing System and N-P Consumption: Year 2008.

In early 2006 we designed and built low energy consumption, pump-operated system, for dosing of the liquid nutrient in the summer 2006 season. This operated successfully, and the system was used again during the 2007 and 2008 seasons for dosing. During the early winter period, 2008, laboratory tests were made of the liquid nutrient pump system, and it was noted that small amounts of air were being entrained on the suction side of the pump, during conditions when the inlet pressure was low. It was believed that this was the cause of diurnal fluctuations in the flow supplied, characteristic of the 2007 year flow data. Replacement of '0' rings on the inlet side of the pumps was the solution to this problem, and when tested in the field during the summer season, the flow supplied was found to be stable. A decision was made by the IKERT committee at the meeting of 20th to 21st May 2008 (held in Coeur d'Alene, Idaho) to use an injection flow rate of liquid fertilizer (polyammonium phosphate 10-34-0) to achieve a target phosphorus concentration of 3.0 {micro}g/L, after complete mixing in the river. This target concentration was the same as that used in 2006 and 2007. The proposed starting date was as early as possible in June 2008. Plans were made to measure the dosing flow in three ways. Two of the three methods of flow measurement (1 and 2 below) are inter-dependent. These were: (1) Direct measurement of flow rate by diverting dosing flow into a 1000 mL volume standard flask. The flow rate was computed by dividing the flask volume by the time required to fill the flask. This was done a few times only during the summer period. (2) Adjusting the flow rate reading of the Gamma dosing pump using the 'calibration' function to achieve agreement with the flow rate computed by method 1 above. (3) Direct measurement by electrical signal from conductive fluid passing through a magnetic field (Seametrics meter, as used in previous years). Values were recorded every 4 minutes by a data-logger. This instrument has been shown to be reliable, and in agreement with method 1 to within the expected uncertainty (within 2%). Liquid nutrients were delivered to the site in late May, and system testing was done the same day. High concentrations of suspended sediment in the water column, as indicated by shallow Secchi depth readings, were present in the river in the last part of May, into June. A plan was made to delay the start up of nutrient addition to a date later than 1st June, because the aquatic productivity was almost certainly to be compromised by insufficient light availability. Daily monitoring of Secchi depths was done, showing declining turbidity in early June. A decision was made to start the system on 15th June, by which time conditions were good.

13 HYDRO ENERGY↗

SECARB Collect Data via Logging, Testing, and Sampling and Distribute to Project Team

Data collection was conducted from Phase III Project start date with completion of the NEPA review in Spring for 2009, through an intense characterization period during well drilling in the summer of 2009, to the start of injection December 1, 2009. During the early stages of injection, data collection was very intense. With staff onsite on 24 hour shifts until January, 2010. Detailed data collection was completed episodically during 2010, with an high injection rate in a tracer study completed during the spring of 2010, and then a repeat seismic survey with borehole gravity, VSP, cross-well and sonic logging conducted during the fall of 2010. By the report date at the end of 2011, data had been compiled and distributed to the team for analysis.

54 ENVIRONMENTAL SCIENCES↗

Ex-Situ Surface Characterization Studies and Boundary Plasma Diagnostic Development for DIII-D (Final Report)

This report details the accomplishments for award DE-SC0016318, which sponsored collaborative research activities between the University of Tennessee-Knoxville and the DIII-D experiment at General Atomics, led by the PI (Donovan), which officially began on August 1, 2016 and ended July 31, 2020. Though the official start date for the award was August 1, 2016, the PI had already initiated collaborative activities with DIII-D during 2015 supported by internal UTK start-up funds utilized by the PI. This prior work enabled UTK to have a substantial role in the June 2016 Metal Rings Campaign (MRC). The DOE funds then provided the opportunity to expand the UTK team with funding for students and a postdoc to perform ex-situ analysis on the wide array of samples exposed during the MRC and develop more sophisticated analysis tools and interpretive modeling techniques.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗