Search NASA⌕ Search

SEARCH · Search NASA

Results for “Station keeping”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Powering the Blue Economy: A Survey of Station-Keeping Methods for Mooringless Platforms

The term “ocean platform” is used to reference everything from stationary, typically moored, buoys to mobile water vehicles, whether they operate on the ocean’s surface or underwater. For certain applications for which relatively stationary station-keeping conditions are desired, the use of mooring systems is not always a viable alternative either for economic, environmental, regulatory, or otherwise practical reasons, or a combination thereof, (e.g., short deployments, sensitive ecosystems, very deep project sites). Maintaining a platform at a single waypoint or reference location without being moored would require additional control systems and a power source to counteract the drift forces that would naturally displace it. Mobile platforms, which are usually untethered except for remotely operated vehicles, typically require energy input to power their station-keeping capabilities so that they hold or control their location in the ocean. Currently, most of these platforms use combustion engines or batteries for this purpose, which, depending on the specific systems, may be costly, pollute the environment, or create limitations on the length of the deployment. However, powering this kind of platforms with surrounding renewable resources (waves, currents, winds, or sun) has been identified as a promising solution to expand their application. The intent of this report is to investigate station-keeping methods for various ocean platforms that are not moored or otherwise anchored to the ocean floor, or another platform or vessel, paying particular interest to technologies that use marine renewable resources to power their operation, because that is of particular interest to the U.S. Department of Energy’s Powering the Blue Economy (PBE) initiative. As a first step, 72 articles and technical reports related to mooringless station-keeping methods were collected for review. The preliminary literature review provided a broad overview of common themes across the literature from which a descriptive methodology for analyzing various platforms was developed. That is, station-keeping methods were categorized based on their predominant energy source and consumption (renewable, nonrenewable, or hybrid if the platform uses renewable and nonrenewable resources equally), and their localization strategy (drift reduction, “path-planning or “waypoint-holding”). In addition, platform types were segregated into the following groups: buoys, surface drifters, and unoccupied surface vehicles (USVs); offshore renewable energy systems; and unoccupied underwater vehicles (UUVs). The main types of station-keeping methods encountered in this report achieve their intended localization strategy by means of drift mitigation, steering, and/or propulsion. Drift mitigation is commonly accomplished via drogues and sea anchors. Stand-along steering subsystems use control surfaces (e.g., ship rudder, wing sail, etc.) that react to ocean currents, waves, or winds to provide varying-degrees of course adjustments. Combined steering and propulsion subsystems include differential thrusters, directional thrusters separate from a primary thruster that cause the platform to pitch up/down or yaw clockwise/counterclockwise, or vectored thrusters that direct the propulsion in a range of directions relative to the platform’s local coordinate system. Propulsion is often achieved by running a motor and applying active control strategies but can also involve buoyancy shifts and using sails to generate lifting forces that propel a platform in a desired direction. Future research is primarily expected to take place in the form of a technoeconomic analysis that would aim to determine the technological viability, cost, and added value of mooringless station-keeping use cases identified through this research, including docking for UUV recharging or for georeferencing drifter buoys, deep-sea floating wind farms, U.S. Navy sonar arrays, and a Pacific Ocean wave buoy network.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data for Post-Access Report: Tidal Energy Resource Characterization and Model Validation via the Assessment of Cost-effective Spatially Distributed Current Measurements from microFloat Swarms

This project evaluated how high-resolution, spatially distributed field data can be used to refine and validate site-scale hydrodynamic simulations of tidal channels. Use of such spatially-distributed field observations or site-scale hydrodynamic simulations will be needed for producing accurate predictions of tidal energy production over larger arrays of tidal turbines. The data contained in this archive includes field observations of water velocity from a series of short surveys in Agate Pass taken on August 20th, 2020 using station-keeping ADCP (acoustic doppler current profiler) measurements, drifting downward-looking ADCPs, and microFloats, gathered by researchers at APL-UW under a previous project. It also includes high-resolution hydrodynamic model runs for the site during that time generated under TEAMER support. An explanatory file (.pdf format) describes the survey and field data structure. Processed data is stored in .mat format. Survey summary: start time, number of floats, water level. microFloat data: - Cleaned data for each float in survey, - Time series of position (lat., lon.), depth (relative to surface), and horizontal velocity (u, v) Drifting ADCP data: - Cleaned data for each drifting ADCP in survey - Time series of position (lat., lon.), sample depth (relative to surface), and observed water velocity (u,v,w) Stationary ADCP data: - Cleaned data for each station-keeping data set in survey - Time series of position (lat., lon.), sample depth (relative to surface), and observed water velocity (u,v,w) FVCOM (Finite Volume Coastal Ocean Model) model outputs: Water level and velocity, as well as derived variables (e.g., power density) from the final refined model simulations for the Agate Pass subdomain. Contained in NetCDF and ASCII files for the duration of August 18th and 20th 2020 field surveys. Additional scripts for processing the data and generating the figures in the report are included.

16 TIDAL AND WAVE POWER↗

Control Design for a Marine Hydrokinetic Cycloturbine Vehicle

Abstract Marine Hydrokinetic (MHK) cycloturbines generate sustainable power by exploiting tidal currents. By powering the turbines and using pitching foils for control, a vehicle comprised of MHK cycloturbines also has the ability to station keep and maneuver. The vehicle consists of four counter-rotating cycloturbines, with hydrofoils oriented perpendicular to the flow in a paddlewheel configuration. Lift and drag generated from these foils sum together to produce thrust. An experimentally tuned simulation model that solves the six-degrees-of-freedom rigid body equations of motion for the MHK vehicle subject to hydrodynamic, hydrostatic, and propulsive forces is used to aid the design of vehicle controllers. Global feedback controllers are initially designed by applying classical control methods to an approximate linear model of the system dynamics. A higher performing nonlinear controller is designed using the nonlinear dynamic inversion (NDI) method. NDI accounts for the nonlinearities of the MHK system and therefore is suitable for a wide range of operating conditions. The response of the classical and NDI controllers to speed, depth, roll, pitch, and yaw commands are evaluated and compared in simulation. The classical controller outperforms the NDI controller for small amplitude maneuvers, although the degradation with NDI is minor. However, in the nonlinear operating regime the NDI controller outperforms the classical controller and the classical controller exhibits instability.

Automation & Control Systems↗

Exploring Novel Configuration Designs Alternatives for Lazy Wave Submarine Power Cables

Floating offshore wind turbines require a complex integrated design to balance the platform response and station-keeping requirements in a highly dynamic environment. Dynamic subsea power cables are one of the critical components that have to be considered in detail to ensure both extreme, as well as repeated operational conditions do not exceed the cable design limits. This paper presents the design feasibility limits of a 66kV dynamic cable for a lazy wave configuration. The work explores an innovative staggered cable configuration that has the potential to provide additional compliance in shallow water conditions. Both configurations are evaluated using the motions of a representative floating wind platform under development for deployment in relatively shallow water depth of 150m. The assessment was conducted using the hydrodynamic software Orcaflex, incorporating a range of design inputs and design variations. Key parameters analysed include cable curvature and effective tension and bending stress. The alternative cable configuration provides a more gradual crossing of the water column, which would allow to support increased platform excursions in shallow water depths. The design uses a combined buoyancy and bend protection element, offering designers additional options for challenging operational conditions. The paper will be of interest to designers and developers of floating wind projects, providing a comparative assessment between the conventional lazy wave configuration and an innovative alternative that enables larger cable and mooring excursion envelopes in challenging conditions.

16 TIDAL AND WAVE POWER↗

Fatigue performance of the Deeply Embedded Ring Anchor

Existing anchor solutions are limited in their applicability to the floating offshore wind industry, which demands prolonged load endurance in extreme weather conditions and varied seabed soils. This limitation restricts project feasibility and increases costs. In order to address these challenges, the Deeply Embedded Ring Anchor (DERA) is proposed to achieve substantial reductions in anchor costs through efficiency enhancements. Ensuring the long-term safety and reliability of the DERA, especially considering a minimum operational period of 25 years, necessitates a comprehensive understanding of fatigue damage. Induced by repetitive loading below material yield strength, fatigue poses a significant threat to structures exposed to waves and currents. Anchors, vital for station keeping, are susceptible to fatigue damage, particularly in the padeye area. This paper conducts a fatigue analysis, focusing on factors such as the wall thickness of the ring anchor, inner stiffeners, and stiffener thickness, to evaluate the performance of DERA in this context. The results showed that the stiffener significantly affects the elongation of the total life of the anchor. In conclusion, this paper focuses on advancing innovations like DERA, enabling the efficient utilization of offshore wind resources, and addressing safety concerns through meticulous fatigue analysis.

17 WIND ENERGY↗

Autonomous Aerial Power Plant Inspection in GPS-denied Environments

Inspection of coal-fired power plants is frequently dangerous, includes difficult places to reach, and can turn expensive due to the downtimes and cost of inspection crew. Robotic systems have shown capabilities to address some of these issues, but most of the current robotic inspection technology in power plants is designed for specific components. Conversely, recent advances in machine vision have empowered aerial platforms for long-range, remotely-controlled, GPS-based inspections of industrial plants. This capability has led to wide spread utilization of aerial robots (commonly termed Drones, UVS or UAS) platforms for inspection in less challenging environments where both collision avoidance, and GPS reception are not significant issues. The challenge in adapting airborne technology for power plant inspection lies in internal structures and the complex network of piping, and distribution systems, which impose significant risks for collision and can hinder the reception and transmission of GPS signals. The current state of the art in aerial inspection technology within the energy sector is controlled via radio control, and utilizes GPS-based navigation, for inspection of large-scale plants such as offshore platforms and wind turbine parks. Nevertheless, close-range and autonomous inspection in the GPS-denied environments of power plants has not yet been achieved, as it requires precise guidance and navigation with real-time situational awareness and obstacle avoidance capabilities. This endeavor introduced the use of rotary wing flying robots, due to their station keeping and vertical take-off capabilities for power plant components inspection. To enable close quarter inspection two methods were used. One method uses the 3D CAD (Three-dimensional Computer-Aided Design) model of the asset to inspect to generate the UAV’s inspection path. To acquire, analyze and process the 3D model, first, the STL file is produced to obtain surface points and vectors normal to the surface. Later, by introducing other variables such as wall offset and a controlled trajectory between each outline and each subsequent layer, the flight path is generated. The proposed framework will generate a path that will pass as close as desired from the surface and navigate in intricate environments. A second method, use advanced manufacturing techniques such as CNC (Computer Numerical Control) and additive manufacturing. Once the inspection flight path is obtained, vision-based navigation systems are employed to have the UAV autonomously tracking the provided trajectory. Finally, Artificial Intelligence-enabled developments are in charge of detecting cracks and corrosion in structural components of power plants. The proposed methods are validated in simulations, laboratory and industrial setups, where it is shown that the developed systems acting together enable close-quarter autonomous aerial inspection and mapping in power plant assets. The system can be further improved by adding more sensors to navigate in different GPS-denied environments, with non-homogeneous lighting conditions, dust and in general situations where vision-based systems may fail.

01 COAL, LIGNITE, AND PEAT↗

TEAMER – Enhanced Flow Measurement for Aquantis Tidal Turbine Test

The AQ10 is a floating, two-bladed, passive yawing tidal turbine developed by Aquantis that has a 10-meterrotor diameter, 160 kW rating, and employs reliable off-the-shelf powertrain and power conversion hardware. Aquantis is planning on-water turbine power performance and loads (blade loading and thrust)testing, where the turbine will be pushed through still water up to 4 knots and placed in a ‘station keeping’ tow in a tidal race up to its rated speed. On-water testing will be conducted using vessels and floating platforms on the sea surface to improve ease of testing and reduce disturbance to the environment. In this TEAMER project, Pacific Northwest National Laboratory (PNNL) will conduct water velocity and turbulence measurements in front of the turbine during on-water testing using acoustic Doppler instrumentation. By measuring both the tidal current flowing past the turbine and the resulting electrical power output, test results will provide a power curve (power vs flow speed) for the turbine up to rated power. Measurements of turbulence and velocity shear in front of the rotor will also provide information to assess the structural response of the rotor blades. With this analysis, Aquantis can use the performance and loads data to validate Tidal Bladed and OpenFAST simulations of the measured operating conditions. Measuring the power performance of a prototype turbine is a valuable step to improving device development and conducting a complete power performance assessment to IEC/TS 62600-200 standards in the future.

16 TIDAL AND WAVE POWER↗

Summary Analysis of Different Offshore Wind Capacity Density Drivers in Proposed U.S. Projects and Impacts on Progress Towards State and Federal Deployment Targets

Understanding the density of offshore wind development - or the "capacity density" - is important for state and federal offshore wind planning efforts and to track progress towards policy goals. NREL has traditionally assumed a capacity density of 3 megawatts per square kilometer (MW/km2) when estimating the U.S. project pipeline (Musial et al. 2022), but capacity densities for existing European offshore wind farms ranged from 2-19 MW/km2 (Borrmann et al. 2018). We track the expected capacity densities of the proposed U.S. projects in the East Coast and make an analysis by state and by developer to identify what are the capacity density norms in the industry and whether the state in which the development efforts are taking place has some impact on capacity density. We also analyze the effects of the area occupied by station keeping systems on capacity density for lease areas dedicated to floating projects and provide a list of main capacity density drivers. This summary analysis sets a baseline to study how different capacity density drivers could impact the progress towards state and federal deployment targets. Given the currently delineated Renewable Energy Areas in the Outer Continental Shelf (OCS) and the basis from the summary analysis, we estimate the expected offshore wind deployment over time federally and by state and compare it to the state and federal deployment targets. The proposed analysis helps identify gaps and needs to meet state and federal targets, which provides sufficient information to propose strategic supply chain and policy planning with the objective of meeting deployment goals.

capacity density↗

Modeling Electric Vehicle Charging Station Siting Suitability with a Focus on Equity

As adoption of electric vehicles increases, the infrastructure to charge them must keep pace. Determining where to add new charging infrastructure is a complex process subject to many factors, including electrical service availability, vehicle dwell time, the type(s) of drivers and vehicles the stations will serve, traffic levels and timing, and land ownership. In addition, advancing social equity is a current priority of federal efforts to invest in electric vehicle charging infrastructure. Conducting Multi-criteria Decision Analysis (MCDA) within Argonne’s Energy Zones Mapping Tool (EZMT) is a useful method for analyzing many of the factors that influence how suitable a location is for potentially adding new charging infrastructure, and we show how equity metrics can be included in the analysis. However, data limitations impose challenges to using MCDA to evaluate and prioritize locations. We use three examples to demonstrate how to use publicly available data and MDCA to analyze different siting objectives. Each example starts with defining a specific objective and ends with how to use the results to identify specific potential locations that could be investigated further. This analysis demonstrates how interested stakeholders can use the EZMT to run the example MCDA models defined in this study, modify them to suit their needs, or create new MCDA models.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Synergies between repositioning and charging strategies for shared autonomous electric vehicle fleets

The emergence of on-demand shared autonomous electric vehicle (SAEV) service requires careful charging station planning and a joint charging and repositioning strategy to mitigate empty travel. This study couples charging and repositioning events as a means of improving service quality (rider wait times), reducing empty travel due to repositioning or charging, and improving fleet utilization (average daily trips per vehicle and charging queues). This synergy is explored for the Austin, Texas region using POLARIS, an agent-based model. On average, wait times were 39% lower, and average daily trips served per SAEV increased up to 6.4 (or 28%) compared to SAEV repositioning with heuristic charging. Coupling repositioning with charging decreased the fleet's percent empty travel on average by 1.6%, relative to the scenario treating them as independent events (which varies by charging station design). Sparser charging stations reduce investment costs, and operators can leverage this framework to keep traveler wait times low.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model-Based Framework to Optimize Charger Station Deployment for Battery Electric Vehicles

The development of battery electric vehicles (BEVs) is accelerating due to their environmental advantages over gasoline and diesel-powered vehicles, including a decrease in air pollution and an increase in energy efficiency. The deployment of charging infrastructure will need to increase to keep pace with demand, especially for large commercial vehicles for which few public chargers currently exist. In this paper, a new flexible framework is proposed for optimizing the placement of charging stations for BEVs, within which different physical models and optimization techniques may be used. Furthermore, a set of metrics is suggested to help enforce complex constraints and facilitate direct comparison between different optimization techniques. Unlike many existing charger placement techniques, the proposed method directly considers the historical driving patterns on a vehicle-by-vehicle basis, using transparent models to assess impacts of candidate charger placements, thus improving the explainability of the results. In the developed framework, modeled BEVs are first generated along the road network to mimic historical traffic data and are simulated traveling along a given route according to a simplified vehicle model. During the simulation, the charger placement problem is initially relaxed to allow vehicles to charge at any node along the road network, and vehicle states are tracked to assess areas of high charging demand. Charging stations are then placed based on the results of the relaxed simulation, and suggested placements are evaluated via road network simulation with fixed charger locations. This proposed framework is applied to a sample problem of placing charging stations along five major highway corridors for Class 8 over-the-road electric trucks. A novel mixed integer programming (MIP) formulation is proposed to optimize charger placements based upon the expected charging demand. Constraints were imposed on the final placement results to limit expected wait times at each station and ensure a minimum threshold of trucking routes are viable for BEVs. The results demonstrate the flexibility and potential effectiveness of the developed model-based framework for scalable charger station deployment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Unsupervised Detection of SOC Spoofing in OCPP 2.0.1 EV Charging Communication Protocol Using One-Class SVM

The electric vehicles (EVs) market keeps growing globally; thus, it is critical to secure the EV charging communication protocols in order to guarantee reliable and fair charging operations among the customers. The Open Charge Point Protocol (OCPP) 2.0.1 supports the communication between the Electric Vehicle Supply Equipment (EVSE) and Charging Station Management Systems (CSMSs); therefore, it becomes vulnerable to several types of attacks, which aim to jeopardize smart charging, billing, and energy management. Specifically, OCPP 2.0.1 allows the self-reporting of the State of Charge (SOC) values, which makes it vulnerable to spoofing-based cyberattacks, which target manipulating the scheduling priorities, distorting the load forecasts, and extending the charging sessions in an unfair manner. In this paper, we try to address this type of attack by providing a comprehensive analysis of the SOC spoofing attacks and introducing a novel unsupervised detection framework based on the One-Class Support Vector Machine (OCSVM) algorithm. Specifically, two types of attack scenarios are analyzed (i.e., priority manipulation and session extension) by deriving engineered features that capture the nonlinear relationships under normal charging behavior. Detailed simulation-based results are derived by utilizing the DESL-EPFL Level 3 EV charging dataset. Our results demonstrate high F1-score and recall in identifying spoofed SOC values and that the proposed OCSVM model demonstrates superior performance compared to alternative clustering and deep-learning based detectors.

EV charging↗

Mission Operations Center for Lawrence Livermore National Laboratory Space Science & Security Program

Space mission operations has grown in line with the development of new space and ground technology. Originally, the philosophy for a space mission was to keep the spacecraft as simple as possible and have as much of the mission complexity on the ground where engineers can fix, control and access things. This was mostly due to immature space technologies and associated risk, as well as cost to develop complex and capable ground stations was relatively cheaper than complex space missions. This led to large room withs multiple computers and an army of engineers and operators sitting at computers and monitoring specific spacecraft information during operations. With development of new space technologies, a lot of functions that were kept and constantly monitored on the ground have been automated and completely integrated into the spacecraft, reducing the number of operators and engineers needed to operate a mission. With the paradigm shift in increasing spacecraft technologies, improved computer technologies, and scaling down space mission size; the mission operations centers have also adapted to changes. More organizations are becoming space-faring institutions and have developed mission operations centers for their unique missions.

42 ENGINEERING↗

Communications Reliability for Vehicle Grid Integration

Electric Vehicles (EVs) adoption rate has been steadily increasing in the US leading to a growing number of charging stations including faster DC (Direct Current) chargers and slower Level 1 and Level 2 AC (Alternating Current) chargers. This increase in demand for electricity is further exacerbated by recent developments in Artificial Intelligence (AI) technology, advanced manufacturing, and digitization. These factors will require electric utilities to upgrade their infrastructure to keep up with the increasing electrical demand (especially during peak hours). An easy way to counteract the need for these upgrades is to shift a major chunk of active charge sessions (durations where there is energy transfer from charger to EV's propulsion battery) to off-peak hours thereby flattening the load curve and making the infrastructure more resilient. This concept is known as Smart Charge Management (SCM). EV owners also benefit from SCM since it lowers their charging costs and consequently their transportation costs by prioritizing charging during off-peak hours. SCM takes advantage of EV's capability to act as a controllable load or DER (Distributed Energy Resource). This report summarizes the reliability analysis performed on the communication required for two of these SCM use-cases. This analysis only focuses on SCM strategies for unidirectional charging (energy transfer from EVSE to EV or V1G) and not bidirectional charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Interference Management for UAV-Assisted Wireless Networks

Here, we investigate a transmission mechanism aiming to improve the data rate between a base station (BS) and a user equipment (UE) through deploying multiple relaying UAVs. We consider the effect of interference incurred by another established communication network, which makes our problem challenging and different from the state of the art. We aim to design the 3D trajectories and power allocation for the UAVs to maximize the data flow of the network while keeping the interference on the existing communication network below a threshold. We utilize the mobility feature of the UAVs to evade the (un)-intended interference caused by (un)-intentional interferers. To this end, we propose an alternating-maximization approach to jointly obtain the 3D trajectories and the UAVs transmission powers. We handle the 3D trajectory design by resorting to spectral graph the power allocation through convex optimization techniques. We also approach the problem from the intentional interferer’s perspective where smart jammers chase the UAVs to effectively degrade the data flow of the network. We also extend our work to the case for multiple UEs. Finally, we demonstrate the efficacy of our proposed method through extensive simulations.

42 ENGINEERING↗

Phosphorus budgets of intensively managed row crops at a long–term agroecosystem research site in the upper US Midwest

Phosphorus (P) budgets for cropping systems provide insights for keeping soil P at optimal levels for crops while avoiding excess inputs. We quantified 12 years of P inputs (fertilizer and atmospheric deposition) and outputs (harvest and leaching losses) for replicated maize (Zea mays L.)—soybean (Glycine max L.)—wheat (Triticum aestivum) crop rotations under conventional, no-till, reduced input, and biologically based (organic without compost or manure) management systems at the Kellogg Biological Station LTAR site in southwest Michigan. Conventional, no-till, and reduced input systems were fertilized between 13 and 50 kg P ha –1 depending on year. Soil test phosphorus (STP) was measured at 0- to 25-cm depth every autumn. Leached P was measured as dissolved P in the soil solution sampled beneath the rooting depth and combined with modeled percolation. Fertilization and harvest were the predominant P fluxes in the fertilized systems, whereas only harvest dominated P flux in the unfertilized organic system. Leaching losses were minor terms in the budgets, but leachate concentrations were nevertheless close to the range of concern for downstream eutrophication. Over the 12-year study period, the organic system exhibited a negative P balance (–82.0 kg P ha –1 ), coinciding with suboptimal STP levels, suggesting a need for P supplementation. In contrast, the fertilized systems showed positive P balances (mean: 70.1 kg P ha –1 ) with STP levels well above agronomic optima. Results underscore the importance of tailored P management strategies to sustain crop productivity while mitigating environmental impacts.

60 APPLIED LIFE SCIENCES↗

Analysing a multi‐stage cyber threat and its impact on the power system

Abstract Electric power systems are composed of physical and cyber sub‐systems. The sub‐systems depend on each other. If the cyber sub‐system is compromised by a cyber threat, what is the impact on the physical system? This paper presents a case study that shows the steps of a multi‐stage cyber threat involving a database injection attack, and what happens to the power system if this threat is not detected in its early stages. The threat first affects one utility but it can spread to the balancing authority, which is responsible for keeping the voltage and frequency stable in the power grid. During the cyber threat, the authors also show defence tools, such as a cyber‐physical data fusion tool that displays and analyses power and cyber telemetry.

Al Homoud, Leen [Texas A&amp,M University College ↗

ARM Lead Mentor Selection Process

The Atmospheric Radiation Measurement (ARM) Program was created in 1989 with funding from the U.S. Department of Energy (DOE) to develop several highly instrumented ground stations to study cloud-formation processes and their influence on radiative transfer. This scientific infrastructure provides for fixed sites, mobile facilities, an aerial facility, and a data archive available for use by scientists worldwide through the ARM Climate Research Facility—a scientific user facility. The ARM Climate Research Facility currently operates more than 300 instrument systems that provide ground-based observations of the atmospheric column. To keep ARM at the forefront of climate observations, the ARM infrastructure depends heavily on instrument scientists and engineers, known as Mentors. Mentors must have an excellent understanding of instrumentation theory and operation for their instrument areas and have comprehensive knowledge of critical scale-dependent atmospheric processes. They must also possess the technical and analytical skills to develop new data retrievals that provide innovative approaches for creating research-quality data sets. The ARM Facility seeks the best overall qualified candidate, or team when appropriate, that can fulfill Mentor requirements in a timely manner. The roles and responsibilities of the ARM Instrument Operations Manager are provided in Appendix A. The key role and responsibilities and detailed responsibilities of ARM Lead Mentors are provided in Appendix B and Appendix C, respectively.

47 OTHER INSTRUMENTATION↗