At least 19 records

Sizing Energy Storage System for Energy Arbitrage in Extreme Fast Charging Station

This paper proposes a non-linear programming (NLP) model to optimally size the energy storage system (ESS) and obtain an optimal energy management for energy arbitrage of an extreme fast charging station (XFCS) for electric vehicles (EVs), with minimized total cost of XFCS operation and ESS investment. Different from most reported work on sizing the ESS for EV charging stations, this paper proposes a pragmatic approach to model the ESS life degradation and accurately count the ESS cycles. Moreover, this work incorporates the peak demand charges in the operational cost of the charging station which are often overlooked in the literature. The proposed model is formulated and solved using AIMMS. Finally, a thorough sensitivity analysis is performed to offer insights into how different input parameters impact the ESS sizing and savings from the energy arbitrage perspective.

25 ENERGY STORAGE↗

Deadband Voltage Control and Power Buffering for Extreme Fast Charging Station

Voltage fluctuation is one of the most common challenges that electric vehicle charging station (EVCS) may introduce to the power grid. Local reactive power compensation (Q-compensation) capability of bi-directional electric vehicle (EV) chargers can mitigate the steady-state voltage violations caused by the EV charging itself or changes in the neighboring loads. Power buffering, using energy storage system (ESS), can be utilized to address the voltage transients (sags and swells) as a result of EV charging at the EVCS. To address PI controller’s ‘hunting’ issue, this paper proposes a Q-sign triggered deadband voltage control (V-control) method at the point of common coupling (PCC). In addition, to ensure the ramp rate of EV charging is within the allowable limits set forth by the grid code, a ramp rate control is proposed that uses the ESS as a ‘power buffer’. Lastly, different from most reported work in the literature where no explicit limit of the power electronic converters (PECs) is considered, this work considers a reasonable apparent power capacity limit of the PECs when achieving the V-control. This limit also affects the amount of active power that can be obtained from the grid, and subsequently may require ESS to function as ‘load sharing’ device to provide supplemental active power to satisfy EV load. A case study simulated in MATLAB (interfaced with PLECS) is presented to demonstrate the effectiveness of the proposed approaches for EVCS operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulated building energy demand biases resulting from the use of representative weather stations

Numerical building models are typically forced with weather data from a limited number of “representative cities” or weather stations representing different climate regions. The use of representative weather stations reduces computational costs, but often fails to capture spatial heterogeneity in weather that may be important for simulations aimed at understanding how building stocks respond to a changing climate. We quantify the potential reduction in bias from using an increasing number of weather stations over the western U.S. The approach is based on deriving temperature and load time series using incrementally more weather stations, ranging from 8 to roughly 150, to capture weather across different seasons. Using 8 stations, one from each climate zone, across the western U.S. results in an average absolute summertime temperature bias of 7.2°F with respect to a spatially-resolved gridded dataset. The mean absolute bias drops to 2.8°F using all available weather stations. Temperature biases of this magnitude could translate to absolute summertime mean simulated load biases as high as 13.8%, a significant error for capacity expansion planners who may use these types of simulations. Increasing the size of the domain over which biases are calculated reduces their magnitude as positive and negative biases may cancel out. Using 8 representative weather stations can lead to a 20-40% overestimation of peak building loads during both summer and winter. Using weather stations close to population centers reduces both mean and peak load biases. This approach could be used by others designing aggregate building simulations to understand the sensitivity to their choice of weather stations used to drive the models.

Burleyson, Casey D.↗

Grid Impact Analysis of Heavy-Duty Electric Vehicle Charging Stations

This paper presents a grid impact analysis of heavy-duty electric vehicle (EV) charging stations. In this work, heavy-duty EVs have battery capacities high enough to provide a range of 250-500 miles on a single charge, such as long-haul trucks. Heavy-duty EVs will require extremely fast charging rates to reduce charging time and will induce very high charging loads (at the multiple-megawatt scale) if several vehicles charge at the same time. Therefore, analysis is needed to understand the impact of charging station loads on the electric power grid and set the baseline for developing mitigation plans and necessary system upgrades. We develop a systematic procedure to analyze the potential impact of the placement of charging stations on the grid. Charging load is modeled using a DC fast-charging station model. A voltage load sensitivity matrix approach is leveraged to investigate the challenges of placing charging stations on the feeder. Given the charging load profiles and suggested charging station locations, time-series simulations are performed on various connection points on the feeder to understand the impact. The analysis is performed on both the IEEE 34-bus system and a realistic feeder from California. Initial mitigation solutions are developed based on insights from this analysis.

47 OTHER INSTRUMENTATION↗

Adapted tube cleaning practices to reduce particulate contamination at hydrogen fueling stations

The higher rate of component failure and downtime during initial operation in hydrogen stations is not well understood. The National Renewable Energy Laboratory (NREL) has been collecting failed components from retail and research hydrogen fueling stations in California and Colorado and analyzing them using an optical zoom and scanning electron microscope. The results show stainless steel metal particulate contamination. While it is difficult to definitively know the origin of the contaminants, a possible source of the metal particulates is improper tube cleaning practices. To understand the impact of different cleaning procedures, NREL performed an experiment to quantify the particulates introduced from newly cut tubes. The process of tube cutting, threading and beveling, which is performed most often during station fabrication, is shown to introduce metal contaminants and thus is an area that could benefit from improved cleaning practices. This paper shows how these particulates can be reduced, which could prevent station downtime and costly repair. These results are from the initial phase of a project in which NREL intends to further investigate the sources of particulate contamination in hydrogen stations.

30 DIRECT ENERGY CONVERSION↗

The laser shock station in the dynamic compression sector. I

The Laser Shock Station in the Dynamic Compression Sector [Advanced Photon Source (APS), Argonne National Laboratory] links a laser-driven shock compression platform with high energy x-ray pulses from the APS to achieve in-situ, time-resolved x-ray measurements (diffraction and imaging) in materials subjected to well-characterized, high stress, short duration planar shock waves. Additionally, the combination of this station and the other DCS experimental stations provides a unique and versatile experimental facility to study condensed state phenomena by undertaking real-time, multi-scale measurements in materials subjected to a wide range of shock amplitudes (to above ~350 GPa) and time-durations (~10 ns to 1 μs). The Laser Shock Station uses a 100 joule, 5-17 ns, 351 nm frequency tripled Nd:glass laser with programmable pulse shaping and focal profile smoothing for maximum precision. The laser is capable of a shot every 30 minutes. The interaction chamber contains multiple ports for simultaneous diagnostics, a sample holder that allows sequential exposure for 14 samples without breaking vacuum, the capability to vary the angle between the x-ray beam and laser beam by 135°, and the ability to translate to select one of two types of x-ray beams. X-ray data can be taken with a temporal resolution of ~90 psec. Highly reproducible, planar shocks can be propagated in samples to undertake precise and well-characterized experiments. In a series of ten shots, the absolute variation in the time the shock breaks out at the back of the sample is less than 500ps and the variation in peak particle velocity at the sample/window interface is 4.3%. Lastly, this paper describes the entire DCS Laser Shock Station, including sample fabrication and diagnostics, as well as representative experimental results from shock compressed tantalum to demonstrate the excellent quality of x-ray diffraction data in solid tantalum and to establish the stress for tantalum melting.

47 OTHER INSTRUMENTATION↗

Heavy Duty Hydrogen: Reference Station, Fueling Performance Test Device Concepts, and Station Capacity Model (CRADA Final Report)

This project will provide valuable information on (1) reference station design, (2) exploration of design concepts for a fueling performance test device, and (3) modeling of station capacity. The work applies to heavy-duty (HD) hydrogen fueling stations with large dispensing capacity and high flowrates servicing HD hydrogen trucks such as class 8 trucks in long haul applications. Additionally, a 4th area will provide near-real-time verification of fuel quality with on-site hydrogen contaminant detectors (HCDs) for use at both light-duty (LD) and HD stations. The work leverages national lab capabilities including staff and equipment at SNL, NLR, and ANL with collaboration and funding cost share from California agencies (CEC, SCAQMD, and GO-Biz). This project will provide tools and information that lead to more efficient design, acceptance, and commissioning of these larger capacity, higher flowrate stations serving HD applications. The HCD work will benefit both LD and HD stations. Note: The 4th area (HCD) mentioned above continued outside of this CRADA and will not be included in this report. There are no tasks included in this CRADA for HCD and the summary text for it should have been removed prior to this CRADA contract execution but remained in error and is included here for completeness.

08 HYDROGEN↗

H2@Scale CRADA: CA Research Consort. (Ref. Station, Fueling Perf. Test Device, Station Cap Model)

Heavy-duty (HD) hydrogen stations are an essential part of building a clean energy infrastructure by lowering greenhouse gas emissions and criteria pollutants from the trucking industry. Clean fuel at HD stations also supports energy, environmental, and social justice by preventing pollution near the stations and on truck routes while strengthening U.S. manufacturing and providing pathways to private sector uptake. The goal of the CA Research Consortium is to continue the research partnership between national laboratories, DOE, and California public agencies for the advancement of hydrogen fueling infrastructure for HD vehicles. This cooperative work directly impacts California's transition to Zero Emission Trucks and will provide tools and information that lead to more efficient design, acceptance, and commissioning of these larger capacity, higher flow rate stations serving HD hydrogen trucks such as class 8 trucks in long haul applications.

AMR↗

International challenge to predict the impact of radioxenon releases from medical isotope production on a comprehensive nuclear test ban treaty sampling station

Abstract The International Monitoring System (IMS) is part of the verification regime for the Comprehensive Nuclear-Test-Ban-Treaty Organization (CTBTO). At entry-into-force, half of the 80 radionuclide stations will be able to measure concentrations of several radioactive xenon isotopes produced in nuclear explosions, and then the full network may be populated with xenon monitoring afterward (Bowyer et al., 2013). Fission-based production of 99Mo for medical purposes also releases radioxenon isotopes to the atmosphere (Saey, 2009). One of the ways to mitigate the effect of emissions from medical isotope production is the use of stack monitoring data, if it were available, so that the effect of radioactive xenon emissions could be subtracted from the effect from a presumed nuclear explosion, when detected at an IMS station location. To date, no studies have addressed the impacts the time resolution or data accuracy of stack monitoring data have on predicted concentrations at an IMS station location. Recently, participants from seven nations used atmospheric transport modeling to predict the time-history of 133Xe concentration measurements at an IMS station in Germany using stack monitoring data from a medical isotope production facility in Belgium. Participants received only stack monitoring data and used the atmospheric transport model and meteorological data of their choice. Some of the models predicted the highest measured concentrations quite well (a high composite statistical model comparison rank or a small mean square error with the measured values). The results suggest release data on a 15 min time spacing is best. The model comparison rank and ensemble analysis suggests that combining multiple models may provide more accurate predicted concentrations than any single model. Further research is needed to identify optimal methods for selecting ensemble members and those methods may depend on the specific transport problem. None of the submissions based only on the stack monitoring data predicted the small measured concentrations very well. The one submission that best predicted small concentrations also included releases from nuclear power plants. Modeling of sources by other nuclear facilities with smaller releases than medical isotope production facilities may be important in discriminating those releases from releases from a nuclear explosion.

133Xe↗

H2@Scale CRADA: CA Research Consort. (Ref. Station, Fueling Perf. Test Device, Station Cap Model)

In support of DOE's H2@Scale initiative, this project leverages with national lab capabilities at SNL, NREL, and ANL with collaboration and funding cost share from California agencies (CEC, South Coast AQMD, and GO-Biz) to enable the build-out of heavy-duty (HD) hydrogen fueling stations with large dispensing capacity and high flow rates by providing tools and information that lead to more efficient design, acceptance, and commissioning. In this presentation, we describe the progress as related to the subtasks of: HD Reference Station Design, HD Station Test Device Design, and the Station Capacity Model.

AMR↗

Conceptual moderator studies for the Spallation Neutron Source short-pulse second target station

Candidate moderator configurations for a short-pulse second target station (STS) at the Oak Ridge National Laboratory Spallation Neutron Source (SNS) have been identified using a global optimizer framework built around the MCNPX particle transport code. Neutron brightness metrics were selected as the figure-of-merit. We assumed that STS would use one out of six proton pulses produced by an SNS accelerator upgraded to operate at 1.3 GeV proton energy, 2.8 MW power and 60 Hz repetition rate. The simulations indicate that the peak brightness can be increased by a factor of 5 and 2.5 on a per proton pulse basis compared to the SNS first target station for both coupled and decoupled para-hydrogen moderators, respectively. Additional increases by factors of 3 and 2 were demonstrated for coupled and decoupled moderators, respectively, by reducing the area of neutron emission from 100 × 100 mm{sup 2} to 20 × 20 mm{sup 2}. This increase in brightness has the potential to translate to an increase of beam intensity at the instruments’ sample positions even though the total neutron emission of the smaller moderator is less than that of the larger. This is especially true for instruments with small samples (beam dimensions). The increased fluxes in the STS moderators come at accelerated poison and de-coupler burnout and higher radiation-induced material damage rates per unit power, which overall translate into lower moderator lifetimes. A first effort was undertaken to group decoupled moderators into a cluster collectively positioning them at the peak neutron production zone in the target and having a three-port neutron emission scheme that complements that of a cylindrical coupled moderator.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Neutronics Analyses for the Spallation Neutron Source Second Target Station

The Spallation Neutron Source (SNS) and the High Flux Isotope Reactor (HFIR), two of the word-class neutron scattering facilities, are located at the Oak Ridge National Laboratory. The SNS and HFIR are funded by the U.S. Department of Energy, Office of Science, Office of Basic Energy Science, and are operated as user facilities, available to researchers from all over the world. Currently there are thirteen neutron scattering instruments in operation at the HFIR and twenty at the SNS First Target Station.Producing the cutting edge science requires continuous improvements and development of the facilities and instruments. The SNS was designed from the beginning to allow addition of the Second Target Station (STS), and an upgrade of the accelerator power. At this time both advances: the accelerator upgrade and the construction of the STS are in preparation.Current baseline design for the STS calls for a rotating compact tungsten target. The target station is driven with short (<1 μs) proton pulses at 10 Hz repetition rate and 467 kW proton beam power, and is optimized for high intensity and high resolution long wavelength neutron applications. The proton beam footprint as small as acceptable from the mechanical and heat removal aspects is planned to generate a compact-volume neutron production zone in the target, which is essential for tight coupling of the target and the moderators and for achieving high-intensity peak thermal and cold neutron fluxes. The STS will allow operation of approximately 22 beamlines and will expand and complement the current national neutron scattering capabilities.This paper will present an update of the status of the neutronics analyses performed for the STS and will discuss the performance of the moderators, heating rates, activation analyses, and shielding calculations which provide input in the engineering design.

Remec, Igor↗

Balancing Charging Station Utilization and Throughput in Electric Vehicle Charging Stations with Queuing Theory

The rapid increase in electric vehicle (EV) adoption demands enhancements in the efficiency and adaptability of EV supply equipment (EVSE). Traditional EVSE systems often fail to optimize power delivery to meet the variable acceptance rates of EV batteries, resulting in significant energy wastage and reduced operational efficiency. This research addresses these challenges by integrating queuing theory with modular EVSE architectures, offering a dual strategy to optimize the operation of EV charging stations. A simulation model was developed to assess various configurations of charger capacities and outlet numbers. This model aimed to identify the optimal setup that maximizes station utilization while minimizing charging times and maximizing throughput. The model focused on charger capacities ranging from 50 to 250 kW and analyzed the different capacities’ effects on charging times and the number of vehicles served. The results indicate that a charger capacity of 125 kW is optimal, striking a balance between the charging time and the number of EVs served per hour, thus achieving the highest station utilization rate. This capacity allows for servicing a significant number of EVs with moderate increases in charging times. Lower capacities, although capable of serving more vehicles, lead to longer charging times and decreased throughput efficiency. The study underscores the effectiveness of combining queuing theory with flexible, modular charging systems that can dynamically adjust to EV charging demands.

Kumar, Praveen↗

DC Link Voltage Balancing of the Active Front-End for the Extreme Fast Charging Stations

One of the most important challenges of the extreme fast charging (XFC) stations is to balance the DC link voltages of the active front-end (AFE). The multilevel cascaded H-bridge (CHB) converter is a great topology for the AFE applications due to the high power density, low total harmonic distortion (THD), and a low number of active and passive components. In this paper, a technique is proposed for balancing DC-link capacitor voltages of a three-phase CHB converter, when a phase shiftPWM modulation technique is used on all cells of the converter. To reach this goal, the redundant states of the CHB converters are used for generating different AC voltage levels by sorting the voltages of the converters. The proposed voltage balancing technique uses the principles that are employed for the DC link voltage balancing of the low-frequency modulation techniques to balance the DC link voltages of the CHB converter. As shown in this paper, the DC link voltages of the CHB converter can accurately be balanced very fast without using PI controllers, which are used in the conventional DC link voltage balancing techniques. A controller also is proposed which will be used to control the dq currents of the CHB converter. To verify the advantages of the proposed technique, the simulation results of the proposed technique will be carried out in a three-phase 7-cell CHB AFE.

Grid-tied converters, cascaded H-bridge, DC link v↗