Search NASA⌕ Search

SEARCH · Search NASA

Results for “Storage Complex”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study Public Data

Data from award DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study performed by the Energy & Environmental Research Center including the following: - 2D Seismic {Input data, sgy files, maps, logs, and descriptors} - Core Petrophysics {Core analysis of plugs from the two stratigraphic test wells (Flemmer-1 [API 33-057-00039] and BNI-1 [API 33-065-00018])} - North Dakota Oil and Gas File No 37380 Files - North Dakota Oil and Gas File No 37672 Files - Well Testing Data {Summary of well testing methods and results from the stratigraphic test wells (Flemmer-1 and BNI-1)} Additional References: https://www.netl.doe.gov/sites/default/files/2017-12/Wesley-Peck-_Mastering-the-Subsurface_CarbonSAFE-Phase-II_August-2017-final.pdf Peck, W.D., Ayash, S.C., Klapperich, R.J., Gorecki, C.D. (2019) The North Dakota integrated carbon storage complex feasibility study, International Journal of Greenhouse Gas Control, Volume 84, 2019, Pages 47-53, https://doi.org/10.1016/j.ijggc.2019.03.001

Carbon Storage↗

Uinta Basin CarbonSAFE II: Storage Complex Feasibility (Final Report)

The primary objective of this CarbonSAFE Phase II project was to establish the technical and commercial feasibility of a commercial-scale CO 2 geological storage complex for Deseret Power Electric Cooperative Bonanza Power Plant and other CO 2 sources in the northeast Uinta Basin, Utah, with the goal to securely store at least 50 million metric tons of captured CO 2 and accelerate CO 2 capture, utilization, and storage (CCUS) deployment. The project team established high-potential technical and commercial feasibility for a storage site within the east Uinta Basin (Utah), in the Cretaceous sandstones (Frontier, Dakota, and Buckhorn), Entrada Sandstone, Nugget Sandstone, and/or Weber Sandstone southwest of the Bonanza coal-fired power plant. This project collected and analyzed state-of-the-art data to characterize the storage complex consistent with Environmental Protection Agency (EPA) permitting standards. The team conducted extensive analog studies, outcrop mapping, and data sampling, which largely contributed to understanding the subsurface lithology and facies. Existing data were obtained and assessed from Utah Division of Oil, Gas, and Mining (DOGM), Utah Geological Survey (UGS), Colorado Geological Survey (CGS), U.S. Geological Survey (USGS), and EPA. These data were analyzed using state-of-the-art CCUS technologies for Societal Considerations, Site Characterization, Modeling and Simulations, Risk Assessment, Management and Monitoring, potential Underground Injection Control (UIC) Class VI Well Permitting, and Technical/Economic Feasibility. Through these high-resolution data collection and feasibility studies, this project was expected to provide a reference for initiating Underground Injection Control (UIC) and other commercial-scale geological storage permitting processes in the Western United States, ultimately contributing to the nation's decarbonization goals through low-risk, cost-effective commercial-scale carbon capture, utilization, and storage (CCUS) projects.

42 ENGINEERING↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S (Phase III) (Final Progress Report)

“Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (Project ECO 2 S)” is an early mover project within the U.S. Department of Energy (DOE) and National Energy Technology Laboratory’s Carbon Storage Assurance Facility Enterprise, or CarbonSAFE, initiative. Phase III of Project ECO2S advanced the foundational work of Phase II, which confirmed the potential for safely, permanently, and economically storing commercial volumes of carbon dioxide (CO 2 ) in the regionally significant saline reservoir system near Mississippi Power Company’s (MPC) Kemper County Energy Facility. The primary objective of Phase III was to complete detailed site characterization necessary to obtain an Underground Injection Control (UIC) Class VI Permit to Construct from the U.S. Environmental Protection Agency. This involved transitioning from regional geologic assessments to high-resolution site-specific analyses.

03 NATURAL GAS↗

Polk Carbon Storage Complex CarbonSAFE Phase 3 (Final Scientific/Technical Report)

This report summarizes the workplan, technical progress, and high-level findings for the Polk Carbon Storage Complex (PCSC) CarbonSAFE Phase III project. The project was designed to advance a commercial-scale geologic CO 2 storage by drilling and completing two characterization wells to strengthen an already-submitted Underground Injection Control (UIC) Class VI permit application, acquiring new subsurface data, advancing National Environmental Policy Act (NEPA) requirements, progressing CO 2 transportation engineering, and developing commercial and community engagement frameworks.

54 ENVIRONMENTAL SCIENCES↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

Prairie State Generating Company Static and Dynamic Modeling

A reservoir modeling study was conducted to assess the feasibility of storing 162.5 million tonnes (8.125 million tonnes annually) of industrially sourced carbon dioxide (CO 2 ) in the St. Peter – Everton and Knox storage complexes at the Prairie State Generating Company’s (PSGC) site near Marissa, Washington County, Illinois (PSGC site). Two separate models were constructed for the St. Peter – Everton and the Knox storage complexes. The St. Peter and Everton sandstones are the target storage units for the St. Peter – Everton storage complex. The Knox Group formations are the target storage units for the Knox storage complex. The Maquoketa Shale is the primary confining unit for both storage complexes. The static reservoir models used as input to the dynamic reservoir models of the storage complexes were developed from interpretations of logs (e.g., gamma ray, resistivity, porosity, photoelectric, and sonic), structure surfaces using data from 36 wells, thickness maps, well test data, seismic data, and permeability data in PetrelTM.

01 COAL, LIGNITE, AND PEAT↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Computational complexities and storage requirements of some Riccati equation solvers

The linear optimal control problem of an nth-order time-invariant dynamic system with a quadratic performance functional is usually solved by the Hamilton-Jacobi approach. This leads to the solution of the differential matrix Riccati equation with a terminal condition. The bulk of the computation for the optimal control problem is related to the solution of this equation. There are various algorithms in the literature for solving the matrix Riccati equation. However, computational complexities and storage requirements as a function of numbers of state variables, control variables, and sensors are not available for all these algorithms. In this work, the computational complexities and storage requirements for some of these algorithms are given. These expressions show the immensity of the computational requirements of the algorithms in solving the Riccati equation for large-order systems such as the control of highly flexible space structures. The expressions are also needed to compute the speedup and efficiency of any implementation of these algorithms on concurrent machines.

Utku, Senol↗

Prairie State Generating Company Site: Storage Field Development Plan

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, operational plans, and costs associated with the proposed Prairie State Energy Campus - Carbon Capture and Storage (PSEC-CCS) project in Washington County, Illinois, near Marissa. The proposed storage complex, known as the St. Peter-Everton Storage Complex, comprises the St. Peter Sandstone and Everton sandstone reservoirs, with the Maquoketa Shale serving as the primary confining unit and the Knox Group as lower confining unit. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Pennsylvanian section.

01 COAL, LIGNITE, AND PEAT↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

TCCSP Project Implementation Plan

The TCCSP CarbonSAFE Phase II efforts focused on developing the technical, community, and economic foundation for a commercial-scale regional geologic storage complex for CO 2 captured. TCCSP has conducted a thorough evaluation of the regional, local, and site-specific geology, legacy well infrastructure, injection site design, and project planning as part of the CarbonSAFE Phase II TCCSP. Specially, the work performed under the CarbonSAFE Phase II has significantly furthered the advancement towards the commerciality of the TCCSP storage complex by delivering on the following objectives: Objective 1: Acquire site-specific characterization data to validate carbon dioxide (CO 2 ) storage estimates of reservoir units and the competency of confining layers in the region to prevent CO 2 leakage to develop a commercial-scale CO 2 project. Objective 2: Assess technical, economic, regulatory, and stakeholder aspects of the TCCSP.

54 ENVIRONMENTAL SCIENCES↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) - Deliverable Task 7: Risk Assessment

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. The primary target CO 2 Storage Complex is the deep Ketona Dolomite located within a 140 square mile area of the Valley and Ridge Region of Alabama. This deep saline reservoir is beneath a confining system encompassing at least 6,500 ft of shales and other low permeability sediments. Project OASIS drilled a deep stratigraphic test well to confirm the geological properties of the confining system and storage reservoir(s) within the Storage Complex. The geological data was incorporated into numerical models to establish the areal extent of the CO 2 plume and help design the storage site and its monitoring system. The project is managed by the Southern States Energy Board (SSEB), an interstate compact organization consisting of governors and state legislative leaders from sixteen southern states, Puerto Rico, and the U.S. Virgin Islands, as well as an appointee by the President of the United States. The organizational compact provides it with access to state government organizations and legislatures. The Board also maintains an Associate Members program comprised of energy resource companies, utilities, trade groups, academic R&D science and technology experts and energy consultants. Further, the SSEB staff is experienced in managing and coordinating complex energy and environmental programs, from research programs to full-scale design and demonstrations of new and innovative technologies. Project OASIS is a public-private partnership of six entities with multiple principal investigators (PIs). SSEB’s Lead PI and Co-PI are responsible for all aspects of project performance in accordance with the DOE-NETL Cooperative Agreement. SSEB has issued subgrants to Advanced Resources International, Inc., Alabama A&M University, Auburn University, Crescent Resource Innovation, and Oklahoma State University. Advanced Resources International, Inc., issued subgrants to Baker Hughes and Loudon Technical Services for field services

20 FOSSIL-FUELED POWER PLANTS↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

Geology of the One Earth Energy Site

The One Earth Energy site is one of two sites in the Illinois Storage Corridor (ISC) project. The objectives of the ISC project is to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site. At the One Earth Energy site, an extensive data collection program was undertaken, which included the drilling of a test well (One Earth Energy #1 [OEE #1]), four 2D seismic lines, and a small 3D seismic survey. The OEE #1 well was drilled in 2022 and acquired extensive core, log, and testing data to characterize the subsurface geology of the site. Coring was focused on the storage interval, the Mt. Simon Sandstone, and the confining interval, the Eau Claire Formation. The core and log data were used to evaluate the sedimentology and sequence stratigraphy, as well as to develop the conceptual geologic model. This report includes the geological summaries of the Mt. Simon Sandstone and the Eau Claire Formation. The extensive analysis of the log data is included in the petrophysical section, showing ranges of porosity, estimated pore size, and the mineral content of selected zones in the well. The separate petrographic technical report entitled “Petrographic and Advanced Geologic Characterization Report on One Earth Energy #1 (API# 1211325373)”, report number DOE-UIUC-0031892-04, details thin section point-counting analysis that includes mineralogical and pore space analysis, including grain size analysis, annotated thin section photomicrographs, scanning electron microscopy (SEM) with energy dispersive X-ray spectroscopy (EDS), and statistics of grain size analysis on Mt. Simon thin sections from OEE #1. The final OEE #1 well data to be included in this geology report is the routine core analysis of both whole core plugs and rotary sidewall core plugs. In addition to the OEE #1 well, four 2D seismic lines and a small 3D survey were acquired as part of the overall subsurface geological characterization. This geology report references the seismic interpretation report, entitled “One Earth Energy Site Seismic Interpretation Task 5.0”, report number DOE-UIUC-0031892-07. This report details the stratigraphic and structural interpretation of the 2D and 3D seismic data acquired at the One Earth Energy site. The 2D seismic data was acquired in 2019 and 2021, and the 3D survey was acquired in 2022. The objectives of the seismic programs were to contribute to the subsurface characterization of the Mt. Simon-Eau Claire Storage Complex by evaluating the continuity of potential storage reservoirs and containment intervals across the project area, and to determine if any geologic features are present that would increase containment risk to the proposed carbon storage project.

09 BIOMASS FUELS↗

Computed Tomography Scanning and Geophysical Measurements of the Integrated Mid-Continent Stacked Carbon Storage Hub Sleepy Hollow Reagan Unit 86A Well

The Computed Tomography (CT) facilities, the Multi-Sensor Core Logger (MSCL), and the Geologic Storage Core Flow laboratory at the National Energy Technology Laboratory (NETL) in Morgantown, West Virginia and Pittsburgh, Pennsylvania were used to characterize a core through Upper Pennsylvanian strata (limestones, mudstones, and sandstones) from the Sleepy Hollow Reagan Unit (SHRU) 86A well in southwest-central Nebraska. The Integrated Mid-Continent Stack Carbon Storage Hub (IMSCS-HUB) core from the vertical well was obtained as part of the Department of Energy’s (DOE) effort to assess the feasibility of stacked storage complexes in Nebraska and Kansas to support a commercial-scale CO2 storage hub. The Sleepy Hollow Field (SHF) is one of three sites within the IMSCS-HUB corridor. Bulk scans of core were obtained from the IMSCS-HUB SHRU 86A well. This report, and the associated scans, include detailed datasets not typically made available to the public. The data sets presented in this report can be accessed from NETL's Energy Data eXchange (EDX) online system.

58 GEOSCIENCES↗

Sequential Testing Algorithms for Multiple Fault Diagnosis

In this paper, we consider the problem of constructing optimal and near-optimal test sequencing algorithms for multiple fault diagnosis. The computational complexity of solving the optimal multiple-fault isolation problem is super-exponential, that is, it is much more difficult than the single-fault isolation problem, which, by itself, is NP-hard. By employing concepts from information theory and AND/OR graph search, we present several test sequencing algorithms for the multiple fault isolation problem. These algorithms provide a trade-off between the degree of suboptimality and computational complexity. Furthermore, we present novel diagnostic strategies that generate a diagnostic directed graph (digraph), instead of a diagnostic tree, for multiple fault diagnosis. Using this approach, the storage complexity of the overall diagnostic strategy reduces substantially. The algorithms developed herein have been successfully applied to several real-world systems. Computational results indicate that the size of a multiple fault strategy is strictly related to the structure of the system.

Shakeri, Mojdeh↗

Sequential Test Strategies for Multiple Fault Isolation

In this paper, we consider the problem of constructing near optimal test sequencing algorithms for diagnosing multiple faults in redundant (fault-tolerant) systems. The computational complexity of solving the optimal multiple-fault isolation problem is super-exponential, that is, it is much more difficult than the single-fault isolation problem, which, by itself, is NP-hard. By employing concepts from information theory and Lagrangian relaxation, we present several static and dynamic (on-line or interactive) test sequencing algorithms for the multiple fault isolation problem that provide a trade-off between the degree of suboptimality and computational complexity. Furthermore, we present novel diagnostic strategies that generate a static diagnostic directed graph (digraph), instead of a static diagnostic tree, for multiple fault diagnosis. Using this approach, the storage complexity of the overall diagnostic strategy reduces substantially. Computational results based on real-world systems indicate that the size of a static multiple fault strategy is strictly related to the structure of the system, and that the use of an on-line multiple fault strategy can diagnose faults in systems with as many as 10,000 failure sources.

Shakeri, M.↗