An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan
The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.