Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

System Administrator for LCS Development Sets

The Spaceport Command and Control System Project is creating a Checkout and Control System that will eventually launch the next generation of vehicles from Kennedy Space Center. KSC has a large set of Development and Operational equipment already deployed in several facilities, including the Launch Control Center, which requires support. The position of System Administrator will complete tasks across multiple platforms (Linux/Windows), many of them virtual. The Hardware Branch of the Control and Data Systems Division at the Kennedy Space Center uses system administrators for a variety of tasks. The position of system administrator comes with many responsibilities which include maintaining computer systems, repair or set up hardware, install software, create backups and recover drive images are a sample of jobs which one must complete. Other duties may include working with clients in person or over the phone and resolving their computer system needs. Training is a major part of learning how an organization functions and operates. Taking that into consideration, NASA is no exception. Training on how to better protect the NASA computer infrastructure will be a topic to learn, followed by NASA work polices. Attending meetings and discussing progress will be expected. A system administrator will have an account with root access. Root access gives a user full access to a computer system and or network. System admins can remove critical system files and recover files using a tape backup. Problem solving will be an important skill to develop in order to complete the many tasks.

Virtualizing in Linux↗

Nasa-wide Standard Administrative Systems

Factors to be considered in developing agency-wide standard administrative systems for NASA include uniformity of hardware and software; centralization vs. decentralization; risk exposure; and models for software development.

Schneck, P.↗

Precise time dissemination and applications development on the Bonneville Power Administration system

The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

K. E. Martin↗

Scalability, Interoperability, and Security at the Data Discovery Level: A System Administrator's Perspective

The Global Change Master Directory (GCMD) has been one of the best known Earth science and global change data discovery online resources throughout its extended operational history. The growing popularity of the system since its introduction on the World Wide Web in 1994 has created an environment where resolving issues of scalability, security, and interoperability have been critical to providing the best available service to the users and partners of the GCMD. Innovative approaches developed at the GCMD in these areas will be presented with a focus on how they relate to current and future GO-ESSP community needs.

Source record↗

System Administration Support/SWORDS G2

The Soldier-Warfighter Operationally Responsive Deployer for Space (SWORDS) rocket is a dedicated small satellite launcher that will minimize danger and complexity in order to allow soldiers in the field to put payloads of up to 25kg into orbit from the field. The SWORDSG2 project is the development of a model, simulation, and ultimately a working application that will control and monitor the cryogenic fluid delivery to the SWORDS rocket for testing purposes. To accomplish this, the project is using the programming language environment Gensym G2. The environment is an all-inclusive application that allows development, testing, modeling, and finally operation of the unique application through graphical and programmatic methods. In addition, observation of the current cryogenic fluid delivery system in the Kennedy Space Center Cry Lab has allowed me to gain valuable experience of fluid systems and propelant delivery that is valuable to our team when developing amd modeling our own system.The ultimate goal of having a test-ready application to show to the heads of the project, and demonstrating G2's capabilities, by late 2014 will require hard work and intense study and understanding of not only the programming aspect but also the physical phenomena we want to model, observe, and control.

cryogenic fluids↗

Ten-fold augmentation of endothelial uptake of vascular endothelial growth factor with ultrasound after systemic administration

OBJECTIVES: In this study, the feasibility of delivering and enhancing the uptake of vascular endothelial growth factor (VEGF) into the intact endothelium by using ultrasound (US) facilitation was determined. BACKGROUND: A limitation of tissue-targeted drug delivery is the need for direct arterial cannulation. We postulate a mechanism by which agents injected intravenously may be targeted to a tissue using US and ultrasonic contrast agents. METHODS: We used a rat model to test the ability of US and an ultrasonic contrast agent perflurocarbon exposed sonicated dextrose albumin (PESDA) to increase uptake of VEGF in the myocardium. Continuous wave Doppler US (0.6 W/cm2 at 1 MHz for 15 min) was applied to the chest wall overlying the myocardium during intravenous injection with either VEGF (100 microg/kg) alone or a combination of VEGF and PESDA (0.1%). Control rats had VEGF infused without US or PESDA. The VEGF uptake was measured quantitatively in the heart, lung, liver and kidneys by enzyme-linked immunosorbent assay (ng/g of tissue) and morphologically by fluorescence microscopy. RESULTS: There was an eight-fold increase in VEGF uptake in the heart by US alone (16.86 +/- 1.56 vs. 2.11 +/- 0.953 ng/g of tissue, p < 0.0001) and a 13-fold increase with US + PESDA (26.78 +/- 2.88 vs. 2.11 +/- 0.953 ng/g of tissue, p < 0.0001) compared with control rats. Fluorescence microscopy revealed deposition of VEGF in the endothelium of small intramyocardial arterioles. CONCLUSIONS: These results show a marked increase in endothelial VEGF uptake with US and US + PESDA. Thus, US may be used to augment endothelial VEGF uptake 10-fold to 13-fold.

Non-NASA Center↗

Building Columbia from the System Administrator View

This document is about NASA advanced supercomputing by building Columbia through the configuration of its software, hardware, and network. The content also includes future plans which include tight scheduling, maintaining production while building Columbia and continued production work while reworking the facilities to acommodate Columbia.

Chan, Davin↗

Planning the future of JPL's management and administrative support systems around an integrated database

JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.

Ebersole, M. M.↗

JSD: Parallel Job Accounting on the IBM SP2

The IBM SP2 is one of the most promising parallel computers for scientific supercomputing - it is fast and usually reliable. One of its biggest problems is a lack of robust and comprehensive system software. Among other things, this software allows a collection of Unix processes to be treated as a single parallel application. It does not, however, provide accounting for parallel jobs other than what is provided by AIX for the individual process components. Without parallel job accounting, it is not possible to monitor system use, measure the effectiveness of system administration strategies, or identify system bottlenecks. To address this problem, we have written jsd, a daemon that collects accounting data for parallel jobs. jsd records information in a format that is easily machine- and human-readable, allowing us to extract the most important accounting information with very little effort. jsd also notifies system administrators in certain cases of system failure.

Saphir, William↗

Managing People's Data

Just imagine a mass storage system that consists of a machine with 2 CPUs, 1 Gigabyte (GB) of memory, 400 GB of disk space, 16800 cartridge tapes in the automated tape silos, 88,000 tapes located in the vault, and the software to manage the system. This system is designed to be a data repository; it will always have disk space to store all the incoming data. Currently 9.14 GB of new data per day enters the system with this rate doubling each year. To assure there is always disk space available for new data, the system. has to move data reside from the expensive disk to a much less expensive medium such as the 3480 cartridge tapes. Once the data is archived to tape, it should be able to move back to disk when someone wants to access it and the data movement should be transparent to the user. Now imagine all the tasks that a system administrator must perform to keep this system running 24 hour a day, 7 days a week. Since the filesystem maintains the illusion of unlimited disk space, data that comes to the system must get moved to tapes in an efficient manner. This paper will describe the mass storage system running at the Numerical Aerodynamic Simulation (NAS) at NASA Ames Research Center in both software and hardware aspects, then it will describe all of the tasks the system administrator has to perform on this system.

Le, Diana↗

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗

Layered virus protection for the operations and administrative messaging system

NASA's Deep Space Network (DSN) is critical in supporting the wide variety of operating and plannedunmanned flight projects. For day-to-day operations it relies on email communication between the three Deep Space Communication Complexes (Canberra, Goldstone, Madrid) and NASA's Jet Propulsion Laboratory. The Operations & Administrative Messaging system, based on the Microsoft Windows NTand Exchange platform, provides the infrastructure that is required for reliable, mission-critical messaging. The reliability of this system, however, is threatened by the proliferation of email viruses that continue to spread at alarming rates. A layered approach to email security has been implemented across the DSN to protect against this threat.

IT security antivirus↗

Detecting Abnormal Machine Characteristics in Cloud Infrastructures

In the cloud computing environment resources are accessed as services rather than as a product. Monitoring this system for performance is crucial because of typical pay-peruse packages bought by the users for their jobs. With the huge number of machines currently in the cloud system, it is often extremely difficult for system administrators to keep track of all machines using distributed monitoring programs such as Ganglia1 which lacks system health assessment and summarization capabilities. To overcome this problem, we propose a technique for automated anomaly detection using machine performance data in the cloud. Our algorithm is entirely distributed and runs locally on each computing machine on the cloud in order to rank the machines in order of their anomalous behavior for given jobs. There is no need to centralize any of the performance data for the analysis and at the end of the analysis, our algorithm generates error reports, thereby allowing the system administrators to take corrective actions. Experiments performed on real data sets collected for different jobs validate the fact that our algorithm has a low overhead for tracking anomalous machines in a cloud infrastructure.

Bhaduri, Kanishka↗

Expert System for UNIX System Reliability and Availability Enhancement

Highly reliable and available systems are critical to the airline industry. However, most off-the-shelf computer operating systems and hardware do not have built-in fault tolerant mechanisms, the UNIX workstation is one example. In this research effort, we have developed a rule-based Expert System (ES) to monitor, command, and control a UNIX workstation system with hot-standby redundancy. The ES on each workstation acts as an on-line system administrator to diagnose, report, correct, and prevent certain types of hardware and software failures. If a primary station is approaching failure, the ES coordinates the switch-over to a hot-standby secondary workstation. The goal is to discover and solve certain fatal problems early enough to prevent complete system failure from occurring and therefore to enhance system reliability and availability. Test results show that the ES can diagnose all targeted faulty scenarios and take desired actions in a consistent manner regardless of the sequence of the faults. The ES can perform designated system administration tasks about ten times faster than an experienced human operator. Compared with a single workstation system, our hot-standby redundancy system downtime is predicted to be reduced by more than 50 percent by using the ES to command and control the system.

Xu, Catherine Q.↗

Uncoupling of the baroreflex by N(N)-cholinergic blockade in dissecting the components of cardiovascular regulation

Systemic administration of adrenergic agonists and nitric oxide donors is used extensively to determine cardiovascular receptor sensitivity. Conclusions regarding receptor sensitivity in the presence of the baroreflex may be misleading. In 8 normal volunteers, we determined the heart rate and blood pressure changes after incremental bolus doses of isoproterenol, phenylephrine, and sodium nitroprusside before and during neuronal nicotinic cholinergic (N(N)-cholinergic) blockade with trimethaphan. Results are given as median (25th/75th percentile). With trimethaphan, the baroreflex slope (as determined by bolus doses of nitroprusside and phenylephrine) decreased from 24 (22/26) to 0.00 (0.00/0.09) ms/mm Hg (P<0.01). The dose of isoproterenol that decreased systolic blood pressure (SBP) 12.5 mm Hg changed from 0.61 (0.51/5.3) to 0.17 (0.12/0.21) microg (P<0.01); the dose required to increase heart rate 12.5 bpm changed from 0.22 (0.17/0.41) to 0.74 (0.33/2.3) microg (P<0.01). The dose of nitroprusside required to decrease SBP 12.5 mm Hg changed from 2.3 (1.3/3.4) to 0.18 (0.14/0.24) microg/kg (P<0.01). The dose of phenylephrine required to increase SBP 12.5 mm Hg changed from 135 (110/200) to 16 (10/30) microg (P<0.01). We conclude that the efferent arc of the baroreflex can be completely interrupted with N(N)-cholinergic blockade. Estimation of adrenoreceptor sensitivity and sensitivity to nitric oxide donors by systemic administration of agonists is severely confounded by baroreflexes. Uncoupling of the baroreflex by N(N)-cholinergic blockade may be a useful method to obtain an integrated measure of adrenergic receptor sensitivity and sensitivity to nitric oxide donors in humans. This approach would permit the comparison of normal and abnormal physiological states without the "noise" of baroreflex buffering.

NASA Discipline Regulatory Physiology↗

National Aeronautics and Space Administration Exploration Systems Interim Strategy

Contents include the following: 1. The Exploration Systems Mission Directorate within NASA. Enabling the Vision for Space Exploration. The Role of the Directorate. 2. Strategic Context and Approach. Corporate Focus. Focused, Prioritized Requirements. Spiral Transformation. Management Rigor. 3. Achieving Directorate Objectives. Strategy to Task Process. Capability Development. Research and Technology Development. 4. Beyond the Horizon. Appendices.

Source record↗