Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

Fiscal Year 2009 Phased Construction Completion Report for EU Z2-36 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

The purpose of this Phased Construction Completion Report (PCCR) is to present fiscal year (FY) 2009 results of Dynamic Verification Strategy (DVS) characterization activities for exposure unit (EU) Z2-36 in Zone 2 at the East Tennessee technology Park (ETTP). The ETTP is located in the northwest corner of the US Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee and encompasses approximately 5000 acres that have been subdivided into three zones--Zone 1 ({approx} 1400 acres), Zone 2 ({approx} 800 acres), and the Boundary Area ({approx} 2800 acres). Zone 2 comprises the highly industrial portion of ETTP and consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the DVS and data quality objectives (DQOs) presented in the Main Plant Group DQO Scoping Package (July 2006) and the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007a) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document EU Z2-36 DVS characterization results; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs, and (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. The Zone 2 ROD divided the area into 7 geographic areas and 44 EUs. To facilitate DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DqO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as EUs became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed in FY 2009 for EU Z2-36.

54 ENVIRONMENTAL SCIENCES↗

Covenant Deferral Request for the Proposed Transfer of Land Parcel ED-8 at the East Tennessee Technology Park, Oak Ridge, Tennessee - Final - May 2009

The United States Department of Energy (DOE) is proposing to transfer a land parcel (hereinafter referred to as 'the Property') designated as Land Parcel ED-8 at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, by deed, and is submitting this Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and applicable U. S. Environmental Protection Agency (EPA) guidance. The Oak Ridge Reservation (ORR), which includes ETTP, was placed on the National Priorities List (NPL) in November 1989. Environmental investigation and cleanup activities are continuing at ETTP in accordance with CERCLA, the National Contingency Plan (NCP), and the Federal Facility Agreement (FFA). The FFA was entered into by the DOE-Oak Ridge Office (ORO), EPA Region 4, and the Tennessee Department of Environment and Conservation (TDEC) in 1991. The FFA establishes the schedule and milestones for environmental remediation of the ORR. The proposed property transfer is a key component of the Oak Ridge Performance Management Plan (ORPMP) for accelerated cleanup of the ORR. DOE, using its authority under Section 161(g) of the Atomic Energy Act of 1954 (AEA), proposes to transfer the Property to Heritage Center, LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), hereafter referred to as 'Heritage Center.' CROET is a 501(c)(3) not-for-profit corporation established to foster the diversification of the regional economy by re-utilizing DOE property for private-sector investment and job creation. The Property is located in the southern portion of ETTP and consists of approximately 84 acres proposed as the potential site for new facilities to be used for office space, industrial activities, or other commercial uses. The parcel contains both grassy fields located outside the ETTP 'main plant' area and infrastructure located inside the 'main plant' area. No buildings are included in the proposed ED-8 transfer. The buildings in ED-8 have already been transferred (Buildings K-1007, K-1580, K-1330, and K-1000). These buildings are not included in the transfer footprint of Land Parcel ED-8. A number of temporary structures, such as trailers and tents (non-real property), are located within the footprint. These temporary structures are not included in the transfer. DOE would continue to be responsible for any contamination resulting from DOE activities that is present on the property at the time of transfer but found after the date of transfer. The deed transferring the Property contains various restrictions and prohibitions on the use of the Property that are subject to enforcement pursuant to State Law Tennessee Code Annotated (T.C.A.) 68-212-225 and state real property law. These restrictions and prohibitions are designed to ensure protection of human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Environmental Management Waste Management Facility Waste Lot Profile for the K-770 Scrap Yard Soils and Miscellaneous Debris, East Tennessee Technology Park, Oak Ridge, Tennessee - EMWMF Waste Lot 4.12

Waste Lot 4.12 consists of approximately 17,500 yd{sup 3} of low-level, radioactively contaminated soil, concrete, and incidental metal and debris generated from remedial actions at the K-770 Scrap Metal Yard and Contaminated Debris Site (the K-770 Scrap Yard) at the East Tennessee Technology Park (ETTP). The excavated soil will be transported by dump truck to the Environmental Management Waste Management Facility (EMWMF). This profile provides project-specific information to demonstrate compliance with Attainment Plan for Risk/Toxicity-based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee (DOE 2001). The K-770 Scrap Yard is an approximately 36-acre storage area located southwest of the main portion of ETTP, outside the security perimeter fence in the Powerhouse Area adjacent to the Clinch River. The K-770 area was used to store radioactively contaminated or suspected contaminated materials during and previous to the K-25 Site cascade upgrading program. The waste storage facility began operation in the 1960s and is estimated to at one time contain in excess of 40,000 tons of low-level, radioactively contaminated scrap metal. Scrap metal was taken to the site when it was found to contain alpha or beta/gamma activity on the surface or if the scrap metal originated from a process building. The segregated metal debris was removed from the site as part of the K-770 Scrap Removal Action (RA) Project that was completed in fiscal year (FY) 2007 by Bechtel Jacobs Company LLC (BJC). An area of approximately 10 acres is located in EUs 29 and 31 where the scrap was originally located in the 100-year floodplain. In the process of moving the materials around and establishing segregated waste piles above the 100-year floodplain, the footprint of the site was expanded by 10-15 acres in EUs 30 and 32. The area in EUs 29 and 31 that was cleared of metallic debris in the floodplain was sown with grass. The areas in EUs 30 and 32 have some scattered vegetation but are generally open and accessible. With limited exception, all materials contained in the scrap yard have been removed and disposed at the EMWMF. Soils that underlay the original waste storage area in EUs 29 and 31 as well as soils that underlay the scrap piles in EUs 30 and 32 show substantially elevated radioactivity. In addition to soils present at the site, remaining portions of foundations/floor slabs for Bldgs. K-725, K-726, and K-736 as well as the unnamed pad at the northeast corner of the site constructed to support the sort and segregation operations at the K-770 Scrap Removal Project in 2006 and several other small, unnamed concrete pads are included in this waste lot. While many of these foundations/floor slabs will be removed because they are contaminated, some of the smaller unamed concrete pads will be removed in order to access contaminated soils that are around and under the pads and regrade the site. Appendix E contains a map showing the areas of soil and concrete pads that are expected to be excavated. Soils in the areas indicated on this map will be removed to approximately one foot below the surface. (This corresponds to the soil interval sampled and analyzed to characterize this waste lot.) Contaminants present in the soils are directly derived from metallic debris and rubbish handled by the waste storage operations, are concentrated in the top few inches, and include the predominant constituents of concern associated with the metallic waste already disposed at EMWMF. Additionally, some residual metallic debris remains embedded in the shallow soils that underlay the former debris piles. This residual metallic debris is eligible for disposal in the EMWMF WAC criteria as defined in Waste Profile for: Disposal of the Scrap Removal Project Waste Lot 65.1 East Tennessee Technology Park, Oak Ridge, Tennessee (BJC 2004a). This waste, however, has been included in Waste Lot 4.12 to conform to the more rigorous profiling requirements currently contained in Waste Acceptance Criteria Attainment Team Project Execution Plan Environmental Management Waste Management Facility, Oak Ridge Reservation, Tennessee (BJC 2008a). It comprises approximately 5% of the total mass of material that will be generated under this RA. Incidental amounts of wood and other debris items and secondary waste generated during the RA are also included in this waste lot.

54 ENVIRONMENTAL SCIENCES↗

Soil Characterizations of Five Urban Sites in Knoxville, Tennessee. 2024-2025

This dataset includes soil characterizations from five urban parks in Knoxville, Tennessee, USA: Cumberland Estates Park (CEP), Socially Equal Energy Efficient Development (SEED), West View Park (WVP), Victor Ashe Park (VAP), and West Hills Park (WHP). The dataset consists of seven CSV files reporting the data from the measurements of gravimetric moisture content, pH, total carbon and nitrogen, soil texture, dissolved organic carbon and nitrogen, and microbial biomass carbon and nitrogen derived from these soil cores. During five separate sampling events conducted in 2024 and 2025, five soil cores were collected at each site within 3 meters of the remote soil monitoring equipment. In 2025, an additional three soil cores were collected adjacent to the monitoring equipment at each site to assess soil bulk density. This dataset is part of a larger study investigating the effects of soil moisture and plant evapotranspiration on ambient temperature and relative humidity across multiple urban parks in Knoxville, Tennessee.

Mayes, Melanie A [ORNL] (ORCID:0000000163689210)↗

Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

54 ENVIRONMENTAL SCIENCES↗

Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) from unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.

54 ENVIRONMENTAL SCIENCES↗

Fiscal Year 2010 Phased Construction Completion Report for EU Z2-32 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORJO 1-2161 &D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORIO 1 -2224&D3) (RDRJRAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone I exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together, which allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed for the EU addressed in this document (EU Z2-32). The purpose of this Phased Construction Completion Report (PCCR) is to address the following: (1) Document DVS characterization results for EU Z2-32. (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs. (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. (4) Describe the remedial action performed in the K-1066-G Yard in EU Z2-32. Approximately 18.4 acres are included in the EU addressed in this PCCR. Based on results of the DVS evaluation, all 18.4 acres are recommended for unrestricted industrial use to 10 ft bgs. There are no Federal Facility Agreement Sites included in Appendix A of the Zone 2 ROD in EU Z2-32. The Zone 2 ROD requires land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-32 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a high probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-32. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18.4 acres addressed in this PCCR were assigned a high probability for consideration of release for unrestricted land use. This document contains the main text (Sects. 1 through 13) and one appendix. The main text addresses the purpose for this PCCR as described above. Additional supporting detail (e.g., field work and data summaries, graphics) is provided in the EU Z2-32 technical memorandum (Appendix A). Historical and DVS analytical data used in this PCCR are provided on a compact disc accompanying this document and can be accessed through the Oak Ridge Environmental Information System.

54 ENVIRONMENTAL SCIENCES↗

Tennessee: Tennessee's Clean Energy Resources and Economy [Brochure]

Tennessee has substantial clean energy resources, including biomass and hydroelectric power. Tennessee is home to two major ethanol production facilities, with a combined total capacity of 215 million gallons per year, and the state has 42 ethanol (E85) and 43 biodiesel refueling stations. Biomass collection in agriculture and forestry industries, refining and fuel production, distribution, and retail sales have contributed significantly to the state’s economy. In 2010, Tennessee utilities invested $\$$49 million in energy efficiency and recorded savings of 120 million kilowatt-hours. This investment supports three loan programs and 14 utility-sponsored rebate programs for energy efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Terrestrial laser scanning data (Levels 0 and 1) from Urban Biogeochemistry Pilot Project sites, Knoxville, Tennessee, Jul 2024 - Jul 2025

This data package contains data from terrestrial laser scanning (TLS) at five urban park sites in Knoxville, Tennessee, USA. All parks include open-grown and/or closed-canopy trees and mixed nearby land use. These study sites were established as part of the Urban Biogeochemistry Pilot Project, which has an overall goal of better understanding how hydrobiogeochemical cycling is altered within the human environment. These five sites represent a gradient of urbanization, and were instrumented to understand hydrological and biogeochemical cycling (e.g., soil moisture, soil physical properties and biogeochemistry, tree transpiration, species type). The TLS data archived here were collected to provide detailed, three-dimensional information about forest structure. Specifically, data were collected to allow tree- and stand-level characterization of woody structure and leaf area. TLS scans were placed to capture the area around trees with sap flow sensors, and as much of a 50 m radius area around the meteorological station as possible given site property limits. Derived products will allow upscaling of water content and transpiration data. This data package contains the following data: - High-level files document further details of the campaign and data package: 1_CampaignSummary.csv provides details about the campaign and study site, 2_ScanAreasDetail.csv provides details about each separate scan area (groups of scans post-processed into a single point cloud), 3_TerrestrialLidarSensor.csv provides further technical details about the Riegl VZ-400i TLS sensor, TLS_CSV_dd.csv is a CSV Data Dictionary providing information about the fields in CSV files following the ESS-DIVE CSV File Formatting Guidelines Reporting Format, TLS_flmd.csv is a File Level Metadata file providing information about each file in the data package following the ESS-DIVE File Level Metadata Reporting Format, and README.txt is a text file describing the overall project and file structure. - Level 0 data are the raw data (.PROJ folders) as recorded by the Riegl VZ-400i TLS instrument before scan co-registration and post-processing with the Riegl's proprietary RiSCAN PRO software, which requires a license. - Level 1 data contain post-processed, co-registered data from each scan area. The "PointClouds" folder for each scan area contains a .las file with 1 cm resolution point cloud data exported from RiSCAN PRO. These are the main files likely to be of interest to most users and can be further processed with any software capable of manipulating .las files (e.g. Python, R CloudCompare). The "Project Information" folder contains log files from post-processing in RiSCAN PRO that may be of interest to users who want to see detailed records of post-processing, including all PDF reports generated by RiSCAN PRO. The "ScanPositions" folder contains information about the final position of all TLS scans, after post-processing, in multiple formats. The file ScanPositions_*.csv provides final geo-referenced scan positions, and the file SOP_backup_*.csv can be used in RiSCAN PRO to restore the co-registered scan positions if users wish to re-process raw data (Level 0 .PROJ folders) with RiSCAN PRO software (e.g., subsample to a different resolution, exclude a certain scan position, or apply different filters on reflectance or deviation values) without redoing time-consuming co-registration steps.

54 ENVIRONMENTAL SCIENCES↗

Petrophysical properties of saprolites from the Oak Ridge Integrated Field Research Challenge site, Tennessee

At the Oak Ridge Integrated Field Research Challenge site, near Oak Ridge, Tennessee, the shallow saprolitic aquifer is contaminated by nitric acid, uranium, and metals originating from the former S3 settling ponds. To interpret low-frequency geophysical methods used to image contaminant plumes, we have characterized the petrophysical properties of three representative saprolite core samples. Their hydraulic conductivity ranges from to in agreement with field data. Complex conductivity measurements, in the frequency range of 1 mHz to 45 kHz, were performed with NaCl solutions with electrical conductivities in the range to , a range representative of field conditions. The electrical conductivity data were well reproduced with a simple linear conductivity model between the saprolite conductivity and the pore water conductivity. The conductivity plots were used to estimate the formation factor (the cementation exponent was about ) and the surface conductivity ( ). The magnitude of the surface conductivity depended on the degree of weathering and therefore on the amount of smectite and mixed layer (illite-smectite) clays present in the saprolite. The chargeability of the core samples was in the range of and is strongly dependent on the salinity. We also performed streaming potential measurements with the same pore fluid composition as that used for the complex conductivity measurements. We found an excess of movable electrical charges on the order of 100 to in agreement with previous investigations connecting the movable excess charge density to permeability. The zeta potential was in the range of to independent on the salinity. The electrical measurements were consistent with an average cation exchange capacity in the range of 1.4 to and a specific surface area on the order of 4000 to about 30,000 . Read More: http://library.seg.org/doi/abs/10.1190/geo2012-0176.1

Revil, André↗

Soil Temperature Sensor Data, 2025, Five sites in Knoxville, Tennessee

This dataset contains surface soil temperature measurements from five urban parks in Knoxville, Tennessee: Cumberland Estates Park (CE), Socially Equal Energy Efficient Development (SD), West View Park (WV), Victor Ashe Park (VA), and West Hills Park (WH). The dataset includes 16 CSV files documenting soil temperature measurements recorded by HOBO Pendant MX Water Temperature Data Loggers. Data collection for all sites began on January 1, 2025. The end time for each sensor is provided in the End Time_2025.csv file. Each logger was installed at a depth of 10 inches and positioned approximately 3 to 6 feet from the weather station at each site. This dataset is part of a broader study examining the effects of soil moisture and plant evapotranspiration on ambient temperature and relative humidity across multiple urban parks in Knoxville.

Salvador, Christian [ORNL] (ORCID:0000000283287777↗

Supplemental Radiological Survey Plan for the Lease of the Rooms Associated with C107 of Building K-1006 at the East Tennessee Technology Park, Oak Ridge, Tennessee

In 1998, a portion of Bldg. K-1006 was leased to the Community Reuse Organization of East Tennessee (CROET) as part of the reindustrialization efforts at the East Tennessee Technology Park (ETTP). The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include rooms C107, C107-A, C107-B, C107-C, and C107-D. The lease of these rooms is now desired. These rooms comprise the area to be surveyed. The building was constructed as a laboratory facility to support the gaseous diffusion uranium enrichment process. It also contains offices and administrative spaces for laboratory personnel. After the gaseous diffusion process was shut down in the mid-1980s, the building was used to provide research and development support to ETTP environmental, safety, and health programs; the Toxic Substances Control Act Incinerator; the Central Neutralization Facility; and other multi-site waste treatment activities. It also served as the chemistry laboratory for the Environmental Technology Technical Services Organization. The activities currently conducted in Bldg. K-1006 utilize a variety of analytical techniques. Some of the major techniques being employed are X-ray analysis, electron microanalysis, and spectrochemical analysis. In 1998, a portion of Bldg. K-1006 was leased to CROET as part of the reindustrialization efforts at ETTP. The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include Rooms C107, C107-A, C107-B, C107-C, and C107-D. Some demolition of furniture and decontamination activities has taken place for Rooms C 107 and C 107-B since the last radiological survey of those rooms. In March 2009, a final remedial action (RA) was performed for the Bldg. K-1006 north basement sump. The Bldg. K-1006 north basement sump is a nominal 30-in.-diameter, 36-in.-deep concrete structure in the north corner of room C107B. The building receives groundwater in-leakage that is periodically pumped to the sewer system via this float-controlled pump. Solids in the bottom of the sump consisted of an estimated 1-ft{sup 3} coarse-grained material that varied in thickness from 0 to 4 in. with no suspended fraction. The RA consisted of removing the water in the sump and then removing and sampling the solids. The solids were mixed with grout after removal and allowed to set. The solids were then disposed off-site at an approved disposal facility. The building sump will remain until the K-1006 building is demolished. The actions for the K- 1006 sump are described in the revised Phased Construction Completion Report for Exposure Unit (EU) Z2-33, which received regulatory approval in December 2009.

54 ENVIRONMENTAL SCIENCES↗

Independent Verification Survey Report for Zone 1 of the East Tennessee Technology Park in Oak Ridge, Tennessee

Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Independent verification survey report for exposure units Z2-24, Z2-31, Z2-32, AND Z2-36 in zone 2 of the East Tennessee technology park Oak Ridge, Tennessee

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management selected Oak Ridge Associated Universities (ORAU), through the Oak Ridge Institute for Science and Education (ORISE) contract, to perform independent verification (IV) at Zone 2 of the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. ORAU has concluded IV surveys, per the project-specific plan (PSP) (ORAU 2013a) covering exposure units (EUs) Z2-24, -31, -32, and -36. The objective of this effort was to verify the target EUs comply with requirements in the Zone 2 Record of Decision (ROD) (DOE 2005), as implemented by using the dynamic verification strategy presented in the dynamic work plan (DWP) (BJC 2007); and confirm commitments in the DWP were adequately implemented, as verified via IV surveys and soil sampling.

54 ENVIRONMENTAL SCIENCES↗

Engineering Evaluation Report on K-311-1 Floor Subsidence (2008 Annual Report) at the East Tennessee Technology Park, Oak Ridge, Tennessee

The purpose of this task is to evaluate the effect of floor settlement on building structure, piping, and equipment foundations between column lines 1 and 2 and B and K of Bldg. K-311-1 (see Fig. A-1 in Appendix A) at East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee. Revision 0 of this document covers the 2005 annual inspection. Revision 1 addresses the 2006 annual inspection, Revision 2 addresses the 2007 annual inspection, and Revision 3 covers the 2008 annual inspection, as indicated by the changed report title. A civil survey and visual inspection were performed. Only a representative number of points were measured during the 2008 survey. The exact location of a number of survey points in Table A-1 could not be accurately determined in the 2008 survey since these points had not been spray painted since 2003. The points measured are deemed adequate to support the conclusions of this report. Based on the survey and observations, there has been no appreciable change in the condition of the unit since the 2007 inspection. The subsidence of the floor presents concerns to the building structure due to the possible indeterminate load on the pipe gallery framing. Prior to demolition activities that involve the piping or removal of the equipment, such as vent, purge and drain and foaming, engineering involvement in the planning is necessary. The piping connected to the equipment is under stress, and actions should be implemented to relieve this stress prior to disturbing any of the equipment or associated piping. In addition, the load on the pipe gallery framing needs to be relieved prior to any activities taking place in the pipe gallery. Access to this area and the pipe gallery is not allowed until the stress is released.

54 ENVIRONMENTAL SCIENCES↗

Environmental Baseline Survey Report for the Title Transfer of the K-792 Switchyard Complex at the East Tennessee Technology Park, Oak Ridge, Tennessee

This environmental baseline survey (EBS) documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-792 Switchyard Complex, which includes the former K-792 Switchyard, the K-79 1-B building, the K-796-A building, and the K-792 Northern Expansion Area located in the northwestern portion of the East Tennessee Technology Park (ETTP). The total area of the property is approximately 19.91 acres. DOE is proposing to transfer the title of this land area and buildings to the Heritage Center, LLC (Heritage Center), a subsidiary corporation of the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the transfer of this government-owned facility at ETTP to a non-federal entity. The area proposed for title transfer includes the former K-792 Switchyard, the K-792 Northern Expansion Area, Bldg. K-791-B, Bldg. K-796-A, and the underlying property known as the underlying fee. Located within the K-792 Switchyard footprint but not included in the transfer are Bldg. K-131 0-MP and Bldg. K- 131 0-MQ, two buildings owned by a private company that leases space in the northern portion of the Switchyard. The transfer footprint is bounded by Perimeter Road to the north and west, the parking area for Portal 8 to the south, and primarily the former K-792 Powerhouse Complex and Avenue 'U' North to the east; however, the eastern boundary along the Northern Expansion area has no physical features associated with it. Zone 2 remedial action objectives were developed by the DVS to support the future use of ETTP as a mixed-use commercial and industrial park. Therefore, remediation criteria were designed for the protection of the future industrial worker under the assumption the worker normally would not have the potential for exposure to soils at depths below 10 ft below ground surface (bgs). Accordingly, land use controls (LUCs) have been established to restrict disturbance of soils below 10 ft deep and to limit future land use to industriallcornmercial activities. Where the need for LUCs below 10 ft bgs is not warranted, this is so stated and explained. Once all actions associated with the DVS for Zone 1 and Zone 2 are completed and the data support it, there will be a re-evaluation with EPA and TDEC for the restriction on excavation below 10 ft. The DVS process and the preparation of this report included visual and physical inspections of the property and adjacent properties, a detailed records search, sampling and analysis of soils, radiological walkover surveys, and a risk evaluation. Resources evaluated as part of the records search included Federal Government records, title documents, aerial photographs that may reflect prior uses, and interviews with current and former employees 1 involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes were stored for one year or more, known to have been released, or disposed of. In addition, radiological surveys of Bldgs. K-791-B and K-796-A were conducted to assess the buildings radiological condition. Soil vapor sampling and polychlorinated biphenyl (PCB) swipe sampling also were conducted within the buildings. Based on the U. S. Department of Energy's (DOE's) review of the existing information, including discussions and interviews referenced herein, and evaluation of the data gathered in preparation of the environmental baseline survey (EBS) for the K-792 Switchyard Complex, DOE recommends the following: Due to the uncertainty associated with the nature of the on-site groundwater and the need to evaluate and possibly address groundwater in the future, DOE recommends that the transfer of the K-792 Switchyard Complex be achieved by a covenant deferral per the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Sect. 120(h)(3)(c). Land use restrictions associated with the covenant deferral are described.

54 ENVIRONMENTAL SCIENCES↗

Environmental Baseline Survey Report for the Title Transfer of Parcel ED-9 at the East Tennessee Technology Park, Oak Ridge, Tennessee

This environmental baseline survey (EBS) report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) Parcel ED-9 at the East Tennessee Technology Park (ETTP). Parcel ED-9 consists of about 13 acres that DOE proposes to transfer to Heritage Center, LLC (hereafter referred to as 'Heritage Center'), a subsidiary of the Community Reuse Organization of East Tennessee (CROET). The 13 acres include two tracts of land, referred to as ED-9A (7.06 acres) and ED-9B (5.02 acres), and a third tract consisting of about 900 linear feet of paved road and adjacent right-of-way, referred to as ED-9C (0.98 acres). Transfer of the title to ED-9 will be by deed under a Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides a summary of information to support the transfer of this government-owned property at ETTP to a non-federal entity.

54 ENVIRONMENTAL SCIENCES↗