Experimental Validation of a High-Temperature Test Facility for Future Additive Manufactured Supercritical Carbon Dioxide Turbine Testing
For next-generation power plants to achieve high cycle efficiencies consistent with the Department of Energy's 65% efficiency target, turbomachinery capable of operating within high-temperature power cycles must be demonstrated. Pairing additively manufactured superalloy turbines with the supercritical carbon dioxide (sCO 2 ) power cycle could enable turbine inlet temperatures approaching 1300 °C while providing flexibility in turbine cooling strategies. Development of test facilities to characterize and validate such systems is crucial. In this study, a turbine test facility capable of achieving inlet conditions of 800 °C, 11 MPa, and 0.43 kg/s while accommodating complex auxiliary cooling flow requirements has been designed and constructed to support future testing of a Haynes 282 additively manufactured 30 kW turbine-generator system with advanced cooling channels. This facility enables characterization of aerodynamic performance, leakage, and windage losses. Details of the facility's construction and operation are presented, along with experimental validation tests using an orifice as an expansion device in place of the turbine. These tests confirm that the facility can reach the required conditions, distinguish regions of achievable steady and pseudo-steady conditions, and identify the heater power required for each point in the upcoming turbine campaign. The campaign confirmed that ISO 5167-2 can reliably predict orifice mass flow rates in extreme supercritical carbon dioxide conditions with deviations of 0.5–7.5%.