Comparison of pre-launch and flight vibration measurements on thor vehicles
Prelaunch & flight vibration measurements on thor vehicles
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Prelaunch & flight vibration measurements on thor vehicles
Mathematical model and longitudinal oscillation mode computations for Thor and Agena test vehicles
Lateral bending vibration analysis for Thor- Agena test vehicle - rotary inertia, shear, and propellant sloshing
Longitudinal vibration response of simplified Thor vehicle structure determined in analytical and experimental study
Early in calendar year 1958 Space Technology Laboratories, Inc. (STL) (then Space Technology Laboratories, a division of the Ramo-Wooldridge Corp.) developed for the Air Force Ballistic Missile Division (AFBMD) an Advanced Re-entry Test Vehicle (ARTV) for the purpose of testing ballistic missile nose cones at the full range of 5500 nautical miles. The two-stage ARTV utilized the Thor ballistic missile and the second stage propulsion system developed for the Vanguard program. In late 1957 and early 1958, STL/AFBMD prepared studies of various missile combinations which could be utilized for space testing. The Thor, in combination with the Vanguard second and third stages, was one of the vehicles considered which offered a very early capability of placing a reasonable payload in a lunar orbit. These STL/AFBMD studies were presented to various appropriate groups including the Killian, Millikan, H. J . Stewart Committees; Headquarters, Air Research and Development Command, and ARDC Centers. Subsequently the Advanced Research Projects Agency (ARPA) contacted STL relative to the availability of hardware for an early lunar shot. By utilizing existing spares already purchased for the ARTV, and by making use of the ARTV contractors already in being, it appeared feasible to launch by the third quarter of calendar year 1958 a payload which would be captured by the moon's gravitational force. On 27 March 1958, ARPA directed STL to proceed with a program of three lunar shots. As much as possible, these shots were to utilize existing ARTV spare hardware and impose no interference with the ballistic missile programs. In September this program was transferred to the direction of the National Aeronautics and Space Administration (NASA). On 17 August 1958 the first launching of the Able-1 vehicle was attempted, but the flight was terminated by a propulsion failure of the first stage. Subsequent launchings were attempted on 13 October and 8 November 1958. Of these launchirigs the October attempt was the most successful. Although the payload did not reach the vicinity of the moon, a maximum altitude of 71,700 was attained, and useful scientific data was obtained from the instrumentation.
Electric rocket test out of earth shadow - thor- agena launch of solar electric test satellite /set/ program
Launching of second Orbiting Geophysical Observatory satellite by thrust augmented Thor-Agena D rocket
Systems optimization for motion stability matrix problem - predictive guidance for Thor vehicle trajectory
The National Aeronautics and Space Administration soon will launch another Explorer satellite to unravel some of the scientific mysteries of how "space weather" affects man's daily life and his future exploration of space. The 89-pound satellite, S-3a, similar to the highly successful Explorer XII placed into orbit last year, will be launched from Cape Canaveral, Fla., no earlier than October 2, using a Thor-Delta rocket. If successful, this will be the 12th straight launch f o r the Delta continuing its unprecedented record for U.S. rocketry.
Brief of Progress: A. Preparations for the 26 November launching of ABLE-4 ATLAS are proceeding as scheduled, with no problems apparent at this time. Many of the electrical tests and subsystems checks have been completed. Minor modifications have been made to the solar paddle tie-down and release mechanism, after an extensive testing program; B. Work toward the 10 December launching of ABLE-4 THOR is also progressing on schedule. Subsystem checks have been started, and mechanical fit checks have been completed; C. During the month of October, a total of 136 tests were performed on components and assemblies related to the ABLE program. These included acceptance tests, type tests, R&D tests, etc. Of this total, only three failures occurred, all of which have been corrected; D. The Space Physics Data Library, Los Angeles, California, is now in operation. Data reduction gear in the Library is in breadboard operation with completion of the installation expected by mid-November. Analysis of ABLE-3 data is progressing satisfactorily at the Library.