Search NASA⌕ Search

SEARCH · Search NASA

Results for “TITAN III LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Titan III Feasibility for HL-20 Prototype Missions

A set of studies was performed to investigate the feasibility of using the Titan III launch vehicle to launch an unmanned prototype HL-20 personnel launch system and, potentially, operational HL-20 missions. The launch of an HL-20 spacecraft on a Titan III poses a unique set of concerns, primarily because the lifting body vehicle is carried on top of the Titan vehicle without a fairing. The Titan III/HL-20 feasibility study addressed the primary vehicle issues of performance, aerodynamics, loads, control and stability, launch availability, and vehicle configuration for the launch of an unmanned HL-20 prototype vehicle. Titan launch operations, launch site systems, and facilities were assessed to determine HL-20 operations compatibility. Additional studies determined the potential launch opportunity and window capabilities of the Titan III for the operational HL-20 mission and the existing Titan III's reliability. The feasibility study determined that the Titan III system, with minor changes, is compatible with the HL-20 vehicle and mission. It could provide nearly daily launch windows for a rendezvous with Space Station Freedom. Titan III reliability, when combined with the HL-20 launch escape system, provides a sufficiently high probability of crew survival to support its consideration as the primary vehicle for HL-20 operational missions.

Benson, Scott W.↗

Ascent abort capability for the HL-20

The HL-20 has been designed with the capability for rescue of the crew during all phases of powered ascent from on the launch pad until orbital injection. A launch-escape system, consisting of solid rocket motors located on the adapter between the HL-20 and the launch vehicle, provides the thrust that propels the HL-20 to a safe distance from a malfunctioning launch vehicle. After these launch-escape motors have burned out, the adapter is jettisoned and the HL-20 executes one of four abort modes. In three abort modes - return-to-launch-site, transatlantic-abort-landing, and abort-to-orbit - not only is the crew rescued, but the HL-20 is recovered intact. In the ocean-landing-by-parachute abort mode, which occurs in between the return-to-launch-site and the transatlantic-abort-landing modes, the crew is rescued, but the HL-20 would likely sustain damage from the ocean landing. This paper describes the launch-escape system and the four abort modes for an ascent on a Titan III launch vehicle.

Naftel, J. C.↗

Application of solar electric propulsion to comet and asteroid rendezvous and docking /CARD/ missions with sample return.

Summary of a feasibility study of CARD mission/system concepts for comet Encke and asteroid Eros missions in the late 1970s. A common planetary vehicle employing a modular SEP (solar electric propulsion) system and a direct rendezvous/docking mode with a staged science/sampling module appears feasible based on 1973 technology. The SEP system utilizes 3.5-kW, 3500-sec Isp mercury ion thrusters and rollout solar arrays sized at 36 (Encke) and 13 (Eros) kW based on the Titan III family launch vehicles. Science payloads, sampling concepts, and supporting spacecraft subsystems are defined. Problem areas are identified, and programmatic considerations are discussed.

Odom, P. R.↗

Automated Mars surface sample return mission concepts for achievement of essential scientific objectives

Mission concepts were investigated for automated return to Earth of a Mars surface sample adequate for detailed analyses in scientific laboratories. The minimum sample mass sufficient to meet scientific requirements was determined. Types of materials and supporting measurements for essential analyses are reported. A baseline trajectory profile was selected for its low energy requirements and relatively simple implementation, and trajectory profile design data were developed for 1979 and 1981 launch opportunities. Efficient spacecraft systems were conceived by utilizing existing technology where possible. Systems concepts emphasized the 1979 launch opportunity, and the applicability of results to other opportunities was assessed. It was shown that the baseline missions (return through Mars parking orbit) and some comparison missions (return after sample transfer in Mars orbit) can be accomplished by using a single Titan III E/Centaur as the launch vehicle. All missions investigated can be accomplished by use of Space Shuttle/Centaur vehicles.

Weaver, W. L.↗

A Historical Perspective on Dynamics Testing at the Langley Research Center

The history of structural dynamics testing research over the past four decades at the Langley Research Center of the National Aeronautics and Space Administration is reviewed. Beginning in the early sixties, Langley investigated several scale model and full-scale spacecraft including the NIMBUS and various concepts for Apollo and Viking landers. Langley engineers pioneered the use of scaled models to study the dynamics of launch vehicles including Saturn I, Saturn V, and Titan III. In the seventies, work emphasized the Space Shuttle and advanced test and data analysis methods. In the eighties, the possibility of delivering large structures to orbit by the Space Shuttle shifted focus towards understanding the interaction of flexible space structures with attitude control systems. Although Langley has maintained a tradition of laboratory-based research, some flight experiments were supported. This review emphasizes work that, in some way, advanced the state of knowledge at the time.

Horta, Lucas G.↗

Expendable launch vehicle transportation for the Space Station

ELVs are presently evaluated as major components of the NASA Space Station's logistics transportation system, augmenting the cargo capacity of the Space Shuttle in support of Station productivity and operational flexibility. The ELVs in question are the Delta II, Atlas II, Titan III, Titan IV, Shuttle-C (unmanned cargo development), European Ariane 5, and Japanese H-II, as well as smaller launch vehicles and OTVs. Early definition of ELV program impacts will preclude the potentially excessive costs of future Space Station modifications.

Corban, Robert R.↗

Titan/Centaur - NASA's newest launch vehicle.

Titan/Centaur is NASA's last 'new-expendable' launch vehicle prior to the advent of the Space Shuttle. Titan/Centaur is an adaptation of the Air Force Titan III booster with an improved version of the Centaur stage and a new 4.2-meter payload fairing. Titan/Centaur is initially being used for high performance escape missions (Helios Solar Probe - 340 kilograms, Viking Mars Orbiter and Lander - 3,629 kilograms, and Mariner Jupiter/Saturn Fly-Bys at 771 kilograms), but is also particularly suited for larger spacecraft in synchronous orbits (transfer - 7,031 kilograms and equatorial, with three Centaur burns - 3,175 kilograms). The program which began in 1965 with internal NASA feasibility studies will culminate in a 'proof flight' launch in early 1974. With the new payload fairing, which also encloses Centaur, payloads nearly 8.5 meters long and 3.8 meters in diameter can be accommodated.

Stofan, A. J.↗

Monte Carlo analysis of the Titan III/Transfer Orbit Stage guidance system for the Mars Observer mission

An important part of space launch vehicle mission planning for a planetary mission is the integrated analysis of guidance and performance dispersions for both booster and upper stage vehicles. For the Mars Observer mission, an integrated trajectory analysis was used to maximize the scientific payload and to minimize injection errors by optimizing the energy management of both vehicles. This was accomplished by designing the Titan III booster vehicle to inject into a hyperbolic departure plane, and the Transfer Orbit Stage (TOS) to correct any booster dispersions. An integrated Monte Carlo analysis of the performance and guidance dispersions of both vehicles provided sensitivities, an evaluation of their guidance schemes and an injection error covariance matrix. The polynomial guidance schemes used for the Titan III variable flight azimuth computations and the TOS solid rocket motor ignition time and burn direction derivations accounted for a wide variation of launch times, performance dispersions, and target conditions. The Mars Observer spacecraft was launched on 25 September 1992 on the Titan III/TOS vehicle. The post flight analysis indicated that a near perfect park orbit injection was achieved, followed by a trans-Mars injection with less than 2sigma errors.

Bell, Stephen C.↗

Aerocapture Design Study for a Titan Polar Orbiter

In 2014 a team at NASA Goddard Space Flight Center (GSFC) studied the feasibility of using active aerocapture to reduce the chemical Delta V requirements for inserting a small scientific satellite into Titan polar orbit. The scientific goals of the mission would be multi-spectral imaging and active radar mapping of Titan's surface and subsurface. The study objectives were to: (i) identify and select from launch window opportunities and refine the trajectory to Titan; (ii) study the aerocapture flight path and refine the entry corridor; (iii) design a carrier spacecraft and systems architecture; (iv) develop a scientific and engineering plan for the orbital portion of the mission. Study results include: (i) a launch in October 2021 on an Atlas V vehicle, using gravity assists from Earth and Venus to arrive at Titan in January 2031; (ii) initial aerocapture via an 8-km wide entry corridor to reach an initial 350X6000 km orbit, followed by aerobraking to reach a 350X1500 km orbit, and a periapse raise maneuver to reach a final 1500 km circular orbit; (iii) a three-part spacecraft system consisting of a cruise stage, radiator module, and orbiter inside a heat shield; (iv) a 22-month mission including station keeping to prevent orbital decay due to Saturn perturbations, with 240 Gb of compressed data returned. High-level issues identified include: (i) downlink capability - realistic downlink rates preclude the desired multi-spectral, global coverage of Titan's surface; (ii) power - demise of the NASA ASRG (Advanced Stirling Radioisotope Generator) program, and limited availability at present of MMRTGs (Multi-Mission Radioisotope Generators) needed for competed outer planet missions; (iii) thermal - external radiators must be carried to remove 4 kW of waste heat from MMRTGs inside the aeroshell, requiring heat pipes that pass through the aeroshell lid, compromising shielding ability; (iv) optical navigation to reach the entry corridor; (v) the NASA requirement of continuous critical event coverage for the orbiter, especially during the peak heating of the aerocapture when the radio link will be broken. In conclusion, although Titan aerocapture allows for considerable savings in propellant mass, this comes at a cost of increased mission complexity. Further architecture study and refinement is required to reduce high-level mission risks and to elucidate the optimum architecture.

Nixon, Conor A.↗

TITAN III Launch Replays

Footage shows several views of the launching of the Mars Observer Titan III satellite. Scenes include different angle and camera views of the launch. Also shown are panoramic views of the launch vehicle on the launch pad.

Source record↗

Space Shuttle payloads and data handling accommodations

The Space Transportation System, which includes the Space Shuttle, will reduce the costs of earth orbital operations while improving operational capabilities and flexibility. The Shuttle can deliver payloads up to 65,000 pounds to a 150-nmi circular orbit at a substantially lower operational cost per flight than the Titan III-C system, which has a payload delivery capability of only 30,000 pounds. In addition, the Space Shuttle can return to earth with up to 32,000 pounds of payload, a capability not provided by expendable launch vehicles. Typical payload missions are considered along with aspects of satellite placement and recovery, typical free-flying payloads, attached scientific payloads, and the typical nature of payload data.

Teasdale, W. E.↗