Search NASA⌕ Search

SEARCH · Search NASA

Results for “TRL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Conformal Ablative Thermal Protection System for Small and Large Scale Missions: Approaching TRL 6 for Planetary and Human Exploration Missions and TRL 9 for Small Probe Missions

In 2011, NASAs Aeronautics Research Mission Directorate (ARMD) funded an effort to develop an ablative thermal protection system (TPS) material that would have improved properties when compared to Phenolic Impregnated Carbon Ablator (PICA) and AVCOAT. Their goal was a conformal material, processed with a flexible reinforcement that would result in similar or better thermal characteristics and higher strain-to-failure characteristics that would allow for easier integration on flight aeroshells than then-current rigid ablative TPS materials. In 2012, NASAs Space Technology Mission Directorate (STMD) began funding the maturation of the best formulation of the game changing conformal ablator, C-PICA. Progress has been reported at IPPW over the past three years, describing C-PICA with a density and recession rates similar to PICA, but with a higher strain-to-failure which allows for direct bonding and no gap fillers, and even more important, with thermal characteristics resulting in half the temperature rise of PICA. Overall, C-PICA should be able to replace PICA with a thinner, lighter weight, less complicated design. These characteristics should be particularly attractive for use as backshell TPS on high energy planetary entry vehicles. At the end of this year, the material should be ready for missions to consider including in their design, in fact, NASAs Science Mission Directorate (SMD) is considering incentivizing the use of C-PICA in the next Discovery Proposal call. This year both scale up of the material to large (1-m) sized pieces and the design and build of small probe heatshields for flight tests will be completed. NASA, with an industry partner, will build a 1-m long manufacturing demonstration unit (MDU) with a shape based on a mid LD lifting body. In addition, in an effort to fly as you test and test as you fly, NASA, with a second industry partner, will build a small probe to test in the Interactive Heating Facility (IHF) arc jet and, using nearly the same design, build the aeroshell and TPS, with instrumentation, for a small probe flight test article, due to fly in 2017. At the end of the year, the C-PICA will be at TRL 5+, and with the flight data in 2017, it will be at TRL 9 for missions needs with C-PICA at a small scale (12 diameter). The scale-up and small probe efforts will be de-scribed in this presentation.

Conformal Ablative↗

TRL-6 for JWST Wavefront Sensing and Control

NASA's Technology Readiness Level (TRL)-6 is documented for the James Webb Space Telescope (JWST) Wavefront Sensing and Control (WFSC) subsystem. The WFSC subsystem is needed to align the Optical Telescope Element (OTE) after all deployments have occurred, and achieves that requirement through a robust commissioning sequence consisting of unique commissioning algorithms, all of which are part of the WFSC algorithm suite. This paper identifies the technology need, algorithm heritage, describes the finished TRL-6 design platform, and summarizes the TRL-6 test results and compliance. Additionally, the performance requirements needed to satisfy JWST science goals as well as the criterion that relate to the TRL-6 Testbed Telescope (TBT) performance requirements are discussed

Feinberg, Lee↗

Bringing an Effective Solar Sail Design Toward TRL 6

Solar sails reflect photons streaming from the sun and convert some of the energy into thrust. This thrust, though small, is continuous and acts for the life of the mission without the need for propellant ( I ) . Recent advances in sail materials and ultra-low mass structures have enabled a host of useful missions utilizing solar sail propulsion. The team of L Garde, Jet Propulsion Laboratories, Ball Aerospace, and Langley Research Center, under the direction of NASA, has been developing a solar sail configuration to address NASA s future space propulsion needs. Utilizing inflatably deployed and Sub Tg rigidized boom components, this 10,000 sq m sailcraft achieves an areal density of 14.1 g/sq m and a characteristic acceleration of 0.58 mm/s . The entire configuration released by the upper stage has a mass of 232.9 kg and requires just 1.7 d of volume in the booster. After deployment, 92.2 kg of non-flight required equipment is jettisoned resulting in a sailcraft mass, including payload and control system, of 140.7 kg. This document outlines the accomplishments of a Phase 1 effort to advance the technology readiness level (TRL) of the concept from 3 toward a TRL of 6. The Phase 1 effort, the first of three proposed phases, addressed the design of the solar sail, its application to several missions currently under review at NASA, and developed a ground tes plan to bring the technology toward a TRL of 6.

Lichodziejewski, David↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Montgomery, Edward E.↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Young, Roy M.↗

JWST Lightweight Mirror TRL-6 Results

Mirror technology for a Primary Mirror Segment Assembly (PMSA) is a system of components: reflective coating; polished optical surface; mirror substrate; actuators, mechanisms and flexures; and reaction structure. The functional purpose of a PMSA is to survive launch, deploy and align itself to form a 25 square meter collecting area 6.5 meter diameter primary mirror with a 131 nm rms wavefront error at temperatures less than 50K and provide stable optical performance for the anticipated thermal environment. At the inception of JWST in 1996, such a capability was at a Technology Readiness Level (TRL) of 3. A highly successful technology development program was initiated including the Sub-scale Beryllium Mirror Demonstrator (SBMD) and Advanced Mirror System Demonstrator (AMSD) projects. These projects along with flight program activities have matured mirror technology for JWST to TRL-6. A directly traceable prototype (and in some cases the flight hardware itself) has been built, tested and operated in a relevant environment.

Stahl, H. Philip↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

Young, Roy M.↗

Bringing an effective solar sail design toward TRL 6

This document outlines the accomplishments of a Phase 1 effort to advance the technology readiness level of the concept from 3 toward a TRL of 6. The Phase 1 effort, the first of three proposed phases, addressed the design of the solar sail, its application to several missions currently under review at NASA, and developed a ground test plan to bring the technology toward a TRL of 6.

Pappa, Richard↗

Development of Technology Readiness Level (TRL) Metrics and Risk Measures

This is an internal project milestone report to document the CCSI Element 7 team's progress on developing Technology Readiness Level (TRL) metrics and risk measures. In this report, we provide a brief overview of the current technology readiness assessment research, document the development of technology readiness levels (TRLs) specific to carbon capture technologies, describe the risk measures and uncertainty quantification approaches used in our research, and conclude by discussing the next steps that the CCSI Task 7 team aims to accomplish.

carbon capture simulation↗

TRL Computer System User’s Guide

We have developed a wiki-based graphical user-interface system that implements our technology readiness level (TRL) uncertainty models. This document contains the instructions for using this wiki-based system.

Engel, David W.↗

'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

16 TIDAL AND WAVE POWER↗

NGNP – Creating Validated TRL and TDRMs for Critical Systems, Subsystems, and Components

This report introduces two draft Next Generation Nuclear Plant (NGNP) Technology Development Roadmaps (TDRMs) and documents the methods used to create them. As such, this report depicts the development of the hardware needed to successfully operate the NGNP and identifies this hardware by the area of the plant it supports and by system, subsystem, and component (SSC). Several options exist for which technologies are selected to fulfill the functions of the NGNP. These options are represented by differing SSCs and are grouped into reference designs. Each SSC associated with each reference design is evaluated, rated, and assigned a technology readiness level (TRL). A rollup of the TRLs allows for comparison of the various reference designs. A TDRM then documents the tasks needed to obtain information in key discriminating criteria to support technology down selection and the tasks and test required to sufficiently mature the technology and reduce the likelihood of technological failure upon installation. This report presents the path forward, methods, and tools used to understand the requirements, manage the uncertainty, and mitigate the risk for the NGNP project. The key tool, TDRMs, is the means to facilitate NGNP risk-informed decision making, technology down selection, and technology qualification and maturation while serving to coordinate engineering, research and development, and licensing efforts.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Single-Block TRL Test Fixture for the Cryogenic Characterization of Planar Microwave Components

The High-Temperature-Superconductivity (HTS) group of the RF Technology Branch, Space Electronics Division, is actively involved in the fabrication and cryogenic characterization of planar microwave components for space applications. This process requires fast, reliable, and accurate measurement techniques not readily available. A new calibration standard/test fixture that enhances the integrity and reliability of the component characterization process has been developed. The fixture consists of 50 omega thru, reflect, delay, and device under test gold lines etched onto a 254 microns (0.010 in) thick alumina substrate. The Thru-Reflect-Line (TRL) fixture was tested at room temperature using a 30 omega, 7.62 mm (300 mil) long, gold line as a known standard. Good agreement between the experimental data and the data modelled using Sonnet's em(C) software was obtained for both the return (S(sub 11)) and insertion (S( 21)) losses. A gold two-pole bandpass filter with a 7.3 GHz center frequency was used as our Device Under Test (DUT), and the results compared with those obtained using a Short-Open-Load-Thru (SOLT) calibration technique.

Mejia, M.↗

TRL-6 Qualification of JWST Mirror Segments

Since 1996, all key mirror technology for a JWST Primary Mirror Segment Assembly (PMSA), as defined directly from the JWST Level 1 Science Requirements, have been developed and matured from a Technology Readiness Level (TRL) of 3 to 6. This has occurred as the result of a highly successful technology development program including sub-scale Beryllium Mirror Demonstrator (SBMD), Advanced Mirror System Demonstrator (AMSD), and JWST flight mirror fabrication. Directly traceable prototypes (and in some cases the flight hardware itself) has been built, tested and operated in a relevant environment.

Stahl, H. Philip↗

From Research to Flight: Surviving the TRL Valley of Death for Robotic and Human Space Exploration

There must be a plan or opportunities for flight validation: a) To reduce the bottleneck of new technologies at the TRL Valley of Death; b) To allow frequent infusion of new technologies into flight missions. Risk must be tolerated for new technology flight experiments. Risk must also be accepted on early-adopting missions to enable new capabilities. Fundamental research is critical to taking the next giant leap in the scientific exploration of space. Technology push is often required to meet current mission requirements. Technology management requires more than issuing NRAs and overseeing contracts.

Johnson, Les↗

From Research to Flight: Surviving the TRL Valley of Death for Robotic and Human Exploration

Fundamental research is critical to taking the next giant leap in the scientific exploration of space. NASA should be pushing the envelope and asking "what if?" .. Technology push enables new capabilities. When NASA began, everything was enabling. .. Technology pull is often required to meet current mission requirements. Technology management requires more than issuing NRAs and overseeing contracts. Continuous assessment, peer review, and system systems studies are vital to credible TRL advancement. A strategy for taking technology R&D to new heights will lead to discoveries at far-reaching destinations..

Johnson, Les↗

Enabling Future Venus In-situ Missions: Heat-Shield for Extreme Entry Environment Technology (HEEET) Progress towards TRL 6

Heat-shield for Extreme Entry Environment Technology (HEEET) has been in development since 2014 with the goal of enabling missions to Venus, Outer Planets, and high-speed sample return missions. It is nearing successful completion and will be delivered by March of 2019. The 15 min presentation at the VEXAG will report on the HEEET development completed to-date and remaining testing and documentations prior to delivery of a TRL 6 technology.

Enabling Future Venus In-situ Missions: Heat-shiel↗

Development of Two High-Energy Bus ‘Cores’ for Rapid Support of Low-TRL and Educational Payloads: A Software-Configured EPS Combined with Flexible C&DH

For several years the TechEdSat flight series (TES-n), developed by the Nano Orbital Workshop (NOW) group at NASA Ames, has relied upon an in-house developed unit to serve both EPS (Electrical Power System) and C&DH (Command and Data Handling) roles along with low data-rate telemetry functions, i.e., serving as the ‘core’ of the spacecraft bus. This ‘core’ has a considerable task given the rapid cadence of the TES program and the typically low-TRL of payloads; configurability and compatibility are key to prevent mission-specific hardware. However, at only 15 watts the current core has become insufficient to support the program’s growing missions and increasingly demanding payloads. To this end, the NOW program is developing new cores to support two TES mission classes: a single-PCB ‘MiniCore’ designed to support 80-watt missions 6U or smaller in LEO, and a three-PCB, radiation-tolerant ‘StackCore’ designed to support 6U and larger missions over 500 watts in LEO and beyond. The ‘MiniCore’ design consists of three main segments: a processor-agnostic C&DH, a software-configured EPS, and a backup low data-rate radio. The design philosophy was to enable rapid-manufacture in a turbulent supply chain, hence the design consists of COTS parts with a focus on those able to be drop-in replaced with radiation-tolerant versions when demanded by the mission. As a single PC-104 sized circuit board, power density and ease of integration also dominated design, demanding the use of modern features such as single-point USB-C for easy charging and monitoring of the spacecraft on the ground. The ‘MiniCore’ can support 80 watts of load, 140 watt-hours of storage, and over 20 watts of optimized solar generation with extensive power monitoring throughout. The ‘MiniCore’ supports one battery pack, six solar-panels, six loads, five actuators, Iridium SBD, and an internal 802.15.4 network. Additionally, the processor-agnostic design can accept any PJRC Teensy 3.x or Adafruit Feather microcontroller unit to enable processor scaling with mission requirements or environment. It is expected a development unit of this design will be completed before conference. The ‘StackCore’ design consists of three stacked PC-104 sized circuit boards: one dedicated to power generation and storage, one dedicated to power distribution, and one dedicated to C&DH tasks. This delineation is necessary to support the transition from highly integrated ICs to discrete analog circuitry, enabling a primarily analog control power system able to operate without software in a radiation environment with finer monitoring compared to the ‘MiniCore’ design. The planned base architecture supports over 500 watts of load, 250 watt-hours of storage, and over 80 watts of optimized solar generation. The power distribution board allows for the use of daughter cards hosting custom converters or interfaces for payloads, in addition to the software-configured supplies used on the ‘MiniCore’. This core stack will be managed by a Vorago ARM M4 microcontroller and support the same wireless communications as the ‘MiniCore’, with optional integration of a NOW S-band radio and attitude determination sensors for ‘black box’ functionality. It is expected the prototype will still be in development during conference.

Spacecraft↗