Search NASA⌕ Search

SEARCH · Search NASA

Results for “TSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Grid-Sphere Current Collection in View of the TSS-1, TSS-1R Mission Results

Passive end-body contactors have been validated in space and provide a simple, effective and robust means of current collection at the positive terminal of an electrodynamic tether system. The grid-sphere has been first suggested by Stone and Gierow, [2001] as the end body that has distinct advantages, compare to solid sphere, lower dynamic drag and higher current-to-mass ratio. This paper presents the estimation of upper limit of current collection by grid-sphere that takes into account the orbital grid-sphere motion, and the ions production inside the grid-sphere. We review the current collection of Tethered Satellite System (TSS-1) flight and of the TSS-1R flights results and suggest how to incorporate them into the grid-sphere current collection estimations. The potential distribution inside the grid-sphere and the potential distribution outside the solid sphere for the same system parameters are calculated. Assuming that the grid- sphere is characterized by the transparency alpha, equal approximately to the ratio of the part of the sphere surface without the mesh to it's total surface, the upper limit of it's current collection is estimated.

Khazanov, G. V.↗

Robust Algorithm for Estimating Total Suspended Solids (TSS) in Inland and Nearshore Coastal Waters

One of the challenging tasks in modern aquatic remote sensing is the retrieval of near-surface concentrations of Total Suspended Solids (TSS). This study aims to present a Statistical, inherent Optical property (IOP) -based, and muLti-conditional Inversion proceDure (SOLID) for enhanced retrievals of satellite-derived TSS under a wide range of in-water bio-optical conditions in rivers, lakes, estuaries, and coastal waters. In this study, using a large in situ database (N > 3500), the SOLID model is devised using a three-step procedure: (a) water-type classification of the input remote sensing reflectance (R(sub rs)), (b) retrieval of particulate backscattering (b(sub bp)) in the red or near-infrared (NIR) regions using semi-analytical, machine-learning, and empirical models, and (c) estimation of TSS from b(sub bp) via water-type-specific empirical models. Using an independent subset of our in situ data (N = 2729) with TSS ranging from 0.1 to 2626.8 [g/m (exp 3)], the SOLID model is thoroughly examined and compared against several state-of-the-art algorithms (Miller and McKee, 2004; Nechad et al., 2010; Novoa et al., 2017; Ondrusek et al., 2012; Petus et al., 2010). We show that SOLID outperforms all the other models to varying degrees, i.e., from 10 to > 100%, depending on the statistical attributes (e.g., global versus water-type-specific metrics). For demonstration purposes, the model is implemented for images acquired by the MultiSpectral Imager aboard Sentinel-2A/B over the Chesapeake Bay, San-Francisco-Bay-Delta Estuary, Lake Okeechobee, and Lake Taihu. To enable generating consistent, multimission TSS products, its performance is further extended to, and evaluated for, other missions, such as the Ocean and Land Color Instrument (OLCI), Moderate Resolution Imaging Spectroradiometer (MODIS), Visible Infrared Imaging Radiometer Suite (VIIRS), and Operational Land Imager (OLI). Sensitivity analyses on uncertainties induced by the atmospheric correction indicate that 10% uncertainty in Rrs leads to < 20% uncertainty in TSS retrievals from SOLID. While this study suggests that SOLID has a potential for producing TSS products in global coastal and inland waters, our statistical analysis certainly verifies that there is still a need for improving retrievals across a wide spectrum of particle loads.

Total suspended solids↗

Unique Results and Lessons Learned From the TSS Missions

The Tethered Satellite System (TSS) Space Shuttle missions, TSS-1 in 1993 and TSS-1R in 1996, were the height of space tether technology development in the U.S. Altogether, the investment made by NASA and the Italian Space Agency (ASI) over the thirteen-year period of the TSS Program totaled approximately $400M-exclusive of the two Space Shuttle flights provided by NASA. Since those two pioneering missions, there have been several smaller tether flight experiments, but interest in this promising technology has waned within NASA as well as the DOD agencies. This is curious in view of the unique capabilities of space tether systems and the fact that they have been flight validated in earth orbit and shown to perform better than the preflight dynamic or electrodynamic theoretical predictions. While it is true that the TSS-1 and TSS-1R missions experienced technical difficulties, the causes of these early developmental problems are now known to have been engineering design flaws, material selection, and procedural issues that (1) are unrelated to the basic viability of space tether technology, and (2) can be readily corrected. The purpose of this paper is to review the dynamic and electrodynamic fundamentals of space tethers and the unique capabilities they afford (that are enabling to certain types of space missions); to elucidate the nature, cause, and solution of the early developmental problems; and to provide an update on progress made in development of the technology.

Stone, Nobie H.↗

Terminal Sequencing and Spacing (TSS)

The Federal Aviation Administration's (FAA) Next Generation Air Transportation System (or NextGen) is being designed to support the predicted increases in traffic volume and to increase the capacity, efficiency and safety of the National Airspace System (NAS). The Federal Aviation Administration (FAA) identifies Performance-Based Navigation (PBN) as a key enabling capability of NextGen and is actively publishing PBN procedures at major airports throughout the United States. Standard Terminal Arrival Routes (STARs), procedures, and approaches are designed to facilitate fuel-efficient continuous descent operations. However, their use is limited during periods of high traffic demand due to the complexity of merging multiple streams of aircraft to the same airport. As a result, most arrivals in the Terminal Radar Approach Control (TRACON) area continue to be controlled using radar vectoring and step-down descents, resulting in high workload for controllers and diverting aircraft from efficient PBN trajectories. To address this issue, NASA developed the Terminal Sequencing and Spacing (TSS) system, an advanced arrival management technology that combines time-based scheduling and controller-based precision spacing tools. TSS is a ground-based controller automation tool that facilitates sequencing and merging arrivals on Performance-Based Navigation (PBN) routes, especially during highly congested demand periods. The two main components of TSS are: 1) a scheduler that de-conflicts merging arrivals in the terminal area by computing appropriate arrival times to the runway threshold and upstream terminal merge points, and 2) a set of Controller-Managed Spacing (CMS) decision support tools to efficiently assist schedule conformance. Sixteen high-fidelity human-in-the-loop simulations involving more than five hundred hours of evaluation time, were conducted to mature TSS from proof-of-concept design to a fully functional prototype. Results indicate high controller use and acceptability of the CMS tools as well as improved PBN route conformance (Figure 2). The TSS technology was transferred to the FAA in 2014, and it is targeted for deployment to several busy airports in the U.S. starting in 2018. Potential enhancements to TSS using DataComm will also be presented.

controller-managed spacing↗

Tethered Space Satellite-1 (TSS-1): Technical Roundabouts

In the early 1990's US and Italian scientists collaborated to study the electrodynamics of dragging a satellite on a tether through the electrically charged portion of Earth's atmosphere called the ionosphere. An electrical current induced in the long wire could be used for power and thrust generation for a satellite. Other tether uses include momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization for satellites. Before the Tethered Space Satellite (TSS-1), no long tether had ever been flown, so many questions existed on how it would actually behave. The TSS consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. With the Space Shuttle at an altitude of 160 nautical miles above earth, the satellite was to be deployed by raising it from the Shuttle bay on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism was to slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. Pre-flight testing system level tests involved setting up a tether receiver to catch the 12.5 mile tether onto another reel as it was being unwound by the deployer reel mechanism. Testing only the reel mechanism is straightforward. This test becomes more complicated when the TSS is mounted on the flight pallet at Kennedy Space Center (KSC). The system level tests must be passed before the pallet can be installed into the Space Shuttle cargo bay. A few months before flight, the TSS payload had been integrated onto the Spacelab pallet and system level tests, including unreeling and reeling the tether, had been successfully completed. Some of this testing equipment was then shipped back to the contractor Martin Marietta. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. The coupled loads analysis, as it is called, incorporates any updates to the model due to system level tests, and any changes that were found during integration. The coupled loads analysis revealed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail during operation. Hardware certification rules do not allow for hardware to fly with negative margins, so this issue had to be resolved before the flight. Since there is conservatism in engineering analysis, there is an option to "waive" the margin requirement, and fly the experiment as is. On the other hand, a structural failure of one payload could have serious or catastrophic consequences to other payloads and possibly the mission. Minor design changes or fixes might be feasible within the payload bay prior to launch. Any major design changes that required the spooling test to validate the hardware, or for the pallet to be removed, would cause TSS not to be ready for the Shuttle launch.

O'Connor, Brian↗

Tethered Satellite System (TSS) core equipment

To date, three Tethered Satellite System (TSS) missions of the Italian provided scientific satellite orbiting in the ionosphere connected to U.S. Space Shuttle is foreseen. The first mission will use an electrically conductive tether of 20 km deployed upward from the orbiter flying at 300 km altitude. This mission will allow investigation of the TSS electrodynamic interaction with the ionosphere due to the high voltage induced across the two terminators of the system during its motion throughout the geomagnetic field. The second mission will use a dielectric tether of 100 km deployed downward from the Orbiter flying at 230 km altitude. Tethered-vehicle access to altitude as low as 120 to 150 km from the Orbiter would permit direct long term observation of phenomena in the lower thermosphere and determination of other dynamical physical processes. The third mission would use the same configuration of the first electrodynamic mission with the complete Core Equipment. Study of power generation by tethered systems would be possible by operating the Core Equipment in the inverted current mode. This mode of operation would allow ion current collection upon the TSS satellite by controlling its potential with respect to the ambient ionospheric plasma. The main requirements of the Core Equipment configuration to date foreseen for the first TSS electrodynamic mission is described. Besides the Core Equipment purposes, its hardware and operational sub-modes of operation are described.

Bonifazi, C.↗

Deployer Performance Results for the TSS-1 Mission

Performance of the Tethered Satellite System (TSS) Deployer during the STS-46 mission (July and August 1992) is analyzed in terms of hardware operation at the component and system level. Although only a limited deployment of the satellite was achieved (256 meters vs 20 kilometers planned), the mission served to verify the basic capability of the Deployer to release, control and retrieve a tethered satellite. - Deployer operational flexibility that was demonstrated during the flight is also addressed. Martin Marietta was the prime contractor for the development of the Deployer, under management of the NASA George C. Marshall Space Flight Center (MSFC). The satellite was provided by Alenia, Torino, Italy under contract to the Agencia Spaziale Italiana (ASI). Proper operation of the avionics components and the majority of mechanisms was observed during the flight. System operations driven by control laws for the deployment and retrieval of the satellite were also successful for the limited deployment distance. Anomalies included separation problems for one of the two umbilical connectors between the Deployer and satellite, tether jamming (at initial Satellite fly-away and at a deployment distance of 224 meters), and a mechanical interference which prevented tether deployment beyond 256 meters. The Deployer was used in several off-nominal conditions to respond to these anomalies, which ultimately enabled a successful satellite retrieval and preservation of hardware integrity for a future re-flight. The paper begins with an introduction defining the significance of the TSS-1 mission. The body of the paper is divided into four major sections: (1) Description of Deployer System and Components, (2) Deployer Components/Systems Demonstrating Successful Operation, (3) Hardware Anomalies and Operational Responses, and (4) Design Modifications for the TSS-1R Re-flight Mission. Conclusions from the TSS-1 mission, including lessons learned are presented at the end of the manuscript.

Marshall, Leland S.↗

Tethered Satellite System (TSS-1R)-Post Flight (STS-75) Engineering Performance Report

The first mission of the Tethered Satellite deployer was flown onboard Atlantis in 1992 during the Space Transportation System (STS) flight STS-46. Due to a mechanical interference with the level wind mechanism the satellite was only Deployed to 256 m rather than the planned 20,000 m. Other problems were also experienced during the STS-46 flight and several modifications were made to the Deployer and Satellite. STS-75 was a reflight of the Tethered Satellite System 1 (TSS-1) designated as Tethered Satellite System 1 Reflight (TSS-1 R) onboard Columbia. As on STS-46, the TSS payload consisted of the Deployer, the Satellite, 3 cargo bay mounted experiments: Shuttle Electrodynamic Tether System (SETS), Shuttle Potential and Return Electron Experiment (SPREE), Deployer Core Equipment (DCORE) 4 Satellite mounted experiments: Research on Electrodynamics Tether Effects (RETE), Research on Orbital Plasma Electrodynamics (ROPE), Satellite Core Instruments (SCORE), Tether Magnetic Field Experiment (TEMAG) and an aft flight deck camera: Tether Optical Phenomena Experiment (TOP). Following successful pre-launch, launch and pre-deployment orbital operations, the Deployer deployed the Tethered Satellite to 19,695 m at which point the tether broke within the Satellite Deployment Boom (SDB). The planned length for On-Station I (OST1) was 20,700 m The Satellite flew away from the Orbiter with the tether attached. The satellite was "safed" and placed in a limited power mode via the RF link. The Satellite was contacted periodically during overflights of ground stations. Cargo bay science activities continued for the period of time allocated to TSS-1 R operations.

Lavoie, Anthony R.↗

Status of tethered satellite system (TSS) development

The Tethered Satellite System (TSS) is a cooperative space system and science development activity being carried out by the U.S. and Italy. The TSS will involve an instrument-laden satellite that can be deployed from the cargo bay of the Shuttle Orbiter using a long tether to altitudes both above and below that of the Orbiter. This paper discusses the predevelopment activities, development approach and management relationships, current hardware and software designs and interfaces, overall science experiment status and plans, and mission operation planning for the first TSS mission.

Laue, Jay H.↗

A Review of Scientific and Technological Results from the TSS-1R Mission

The Tethered Satellite System (TSS) program was designed to provide a unique opportunity to explore certain space plasma-electrodynamic processes and the orbital mechanics of a gravity-gradient stabilized system of two satellites linked by a long conducting tether. A unique data set was obtained during deployment which has allowed significant science to be accomplished. This paper focuses on results from the TSS-1R mission that are most important to the future technological applications of electrodynamic tethers in space, in particular, the current collection process. Of particular significance is an apparent transition of the physics of current collection when the potential of the collecting body becomes greater than the ram energy of the ionospheric atomic oxygen ions. Previous theoretical models of current collection were electrostatic, assuming that the orbital motion of the system, which is highly subsonic with respect to electron thermal motion, was unimportant. This may still be acceptable for the case of relatively slow-moving sounding rockets. However, the TSS-1R results show that motion relative to the plasma must be accounted for in orbiting systems.

Stone, N. H.↗

The TSS-1R Electrodynamic Tether Experiment: Scientific and Technological Results

The Tethered Satellite System (TSS) program was designed to provide the opportunity to explore certain space plasma-electrodynamic processes (associated with high-voltage bodies and electrical currents in space) and the orbital mechanics of a gravity-gradient stabilized system of two satellites linked by a long conducting tether. A unique data set was obtained during the TSS-1 R mission in which the tether emf and current reached values in excess of 3500 volts and 1 amp, respectively. The insight this has allowed into the current collection process and the physics of high-voltage plasma sheaths is significant. Previous theoretical models of current collection were electro-static assuming that the orbital motion of the system, which is highly sub-sonic with respect to electron thermal motion, was unimportant. This may still be acceptable for the case of relatively slow-moving sounding rockets. However, the TSS-1 R results show that motion relative to the plasma does affect current collection and must be accounted for in orbiting systems.

Stone, Nobie H.↗

Satellite Particle Collection During Active States of the Tethered Satellite System (TSS)

The reflight of the Tethered Satellite System (TSS-1R) was carried aboard the Space Shuttle Columbia on February 22, 1996. After deploying a day later than planned, the satellite almost reached its full deployed distance before the tether broke. Data was collected for over 5 hours during deployment out to a distance of 19.7 km. Maximum emf attained during deployment was 3700 V while the maximum current achieved was just under 0.5 A. The current collected was factors of 2 to 4 greater than the predictions of the conventional Parker-Murphy theory. The microscopic view of the collection process at the satellite showed exotic behavior with the existence of 100 - 200 eV suprathermal electrons and significant spin phase modulation of the electron fluxes. Although the data set acquired from TSS- 1R was considerably less than planned, the quality of the data allows one of the main goals of the mission to be met--characterizing the system I-V response. A "quick look" assessment of the data has already shown that an understanding of the TSS-1R electrodynamic behavior will require modification of the standard picture of current collection in space plasmas

Wright, K. H., Jr.↗

The TSS-1R Electrodynamic Tether Experiment: Scientific and Technological Results

The bi-national, US-Italian, Tethered Satellite System (TSS) program was designed to provide a unique opportunity to explore certain space plasma- electrodynamic processes and the orbital mechanics of a gravity-gradient stabilized system of two satellites linked by a long conducting tether. The second flight, TSS-LR, was launched February 22, 1996 on STS-75 and satellite deployment began at MET 3/00:27. A unique data set was obtained over the next five hours, as the tether was deployed to a length of 19695 meters, which has allowed significant science to be accomplished. This presentation will focus on electrodynamic processes generated by the tether--in particular, the collection of electrical current from the ionospheric plasma. Of particular significance is an apparent transition of the physics of current collection when the potential of the collecting body becomes greater than the ram energy of the ionospheric atomic oxygen ions. Previous theoretical models of current collection were electrostatic--assuming that the orbital motion of the system, which is highly subsonic with respect to electron thermal motion, was un- important. This may still be acceptable for the case of relatively slow-moving sounding rockets. However, the TSS-LR results show that motion relative to the plasma must be accounted for in orbiting systems.

Stone, Nobie H.↗

Development testing of TSS-1 Deployer tether control system mechanisms

Successful tether deployment and retrieval, consistent with established control laws, is predicated upon statusing real time tether dynamic conditions. This paper reports on the initial phase of engineering tests performed on various components and subassemblies integral to the TSS-1 tether control system as part of the TSS Deployer. The tests were conducted as part of the tether control system development and verification plan to confirm the functionality and map the performance of the hardware in both ambient and environmental test conditions. The result of this development effort is a lessons-learned list and design upgrades to both the flight and test hardware and to the test methods and procedures.

Bentley, D. P.↗

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.↗

TSS tether cable meteoroid/orbital debris damage analysis

This report summarizes the damage analyses performed on the tether cable used for the tethered satellite system (TSS), for the damage that could be caused by meteoroid or orbital debris impacts. The TSS consists of a tethered satellite deployer and a tethered satellite. The analytical studies were performed at Marshall Space Flight Center (MSFC) with the results from the following tests: (1) hypervelocity impact tests to determine the 'critical' meteoroid particle diameter, i.e., the maximum size of a meteoroid particle which can impact the tether cable without causing 'failure'; (2) electrical resistance tests on the damaged and undamaged tether cable to determine if degradation of current flow occurred through the damaged tether cables; and (3) tensile load tests to verify the load carrying capability of the damaged tether cables. Finally, the HULL hydrodynamic computer code was used to simulate the hypervelocity impact of the tether cable by particles at velocities higher than can be tested, to determine the extent of the expected tether damage.

Hayashida, K. B.↗

The dynamic phenomena of a tethered satellite: NASA's first Tethered Satellite Mission, TSS-1

The tethered satellite system (TSS) was envisioned as a means of extending a satellite from its base (space shuttle, space station, space platform) into a lower or higher altitude in order to more efficiently acquire data and perform science experiments. This is accomplished by attaching the satellite to a tether, deploying it, then reeling it in. When its mission is completed, the satellite can be returned to its base for reuse. If the tether contains a conductor, it can also be used as a means to generate and flow current to and from the satellite to the base. When current is flowed, the tether interacts with the Earth's magnetic field, deflecting the tether. When the current flows in one direction, the system becomes a propulsive system that can be used to boost the orbiting system. In the other direction, it is a power generating system. Pulsing the current sets up a dynamic oscillation in the tether, which can upset the satellite attitude and preclude docking. A basic problem occurs around 400-m tether length, during satellite retrieval when the satellite's pendulous (rotational) mode gets in resonance with the first lateral tether string mode. The problem's magnitude is determined by the amount of skiprope present coming into this resonance condition. This paper deals with the tethered satellite, its dynamic phenomena, and how the resulting problems were solved for the first tethered satellite mission (TSS-1). Proposals for improvements for future tethered satellite missions are included. Results from the first tethered satellite flight are summarized.

Ryan, R. S.↗