Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task 36”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Reference H Cycle 3 Stability, Control, and Flying Qualities Batch Assessments

This work is an update of the assessment completed in February of 1996, when a preliminary assessment report was issued for the Cycle 2B simulation model. The primary purpose of the final assessment was to re-evaluate each assessment against the flight control system (FCS) requirements document using the updated model. Only a limited number of final assessments were completed due to the close proximity of the release of the Langley model and the assessment deliverable date. The assessment used the nonlinear Cycle 3 simulation model because it combines nonlinear aeroelastic (quasi-static) aerodynamic with hinge moment and rate limited control surface deflections. Both Configuration Aerodynamics (Task 32) and Flight Controls (Task 36) were funded in 1996 to conduct the final stability and control assessments of the unaugmented Reference H configuration in FY96. Because the two tasks had similar output requirements, the work was divided such that Flight Controls would be responsible for the implementation and checkout of the simulation model and Configuration Aerodynamics for writing Madab "script' files, conducting the batch assessments and writing the assessment report. Additionally, Flight Controls was to investigate control surface allocations schemes different from the baseline Reference H in an effort to fulfill flying qualities criteria.

Henderson, Dennis K.↗

Space Launch System Spacecraft/Payloads Integration and Evolution Office Advanced Development FY 2014 Annual Report

The Advanced Development Office (ADO), part of the Space Launch System (SLS) program, provides SLS with the advanced development needed to evolve the vehicle from an initial Block 1 payload capability of 70 metric tons (t) to an eventual capability Block 2 of 130 t, with intermediary evolution options possible. ADO takes existing technologies and matures them to the point that insertion into the mainline program minimizes risk. The ADO portfolio of tasks covers a broad range of technical developmental activities. The ADO portfolio supports the development of advanced boosters, upper stages, and other advanced development activities benefiting the SLS program. A total of 36 separate tasks were funded by ADO in FY 2014.

Crumbly, C. M.↗

One for All: Maintaining a Single Schedule Database for Large Development Projects

Efficiently maintaining and controlling a single schedule database in an Integrated Product Team environment is a significant challenge. It's accomplished effectively with the right combination of tools, skills, strategy, creativity, and teamwork. We'll share our lessons learned maintaining a 20,000 plus task network on a 36 month project.

Hilscher, R.↗

Space Adaptation of Active Mirror Segment Concepts

This report summarizes the results of a three year effort by Blue Line Engineering Co. to advance the state of segmented mirror systems in several separate but related areas. The initial set of tasks were designed to address the issues of system level architecture, digital processing system, cluster level support structures, and advanced mirror fabrication concepts. Later in the project new tasks were added to provide support to the existing segmented mirror testbed at Marshall Space Flight Center (MSFC) in the form of upgrades to the 36 subaperture wavefront sensor. Still later, tasks were added to build and install a new system processor based on the results of the new system architecture. The project was successful in achieving a number of important results. These include the following most notable accomplishments: 1) The creation of a new modular digital processing system that is extremely capable and may be applied to a wide range of segmented mirror systems as well as many classes of Multiple Input Multiple Output (MIMO) control systems such as active structures or industrial automation. 2) A new graphical user interface was created for operation of segmented mirror systems. 3) The development of a high bit rate serial data loop that permits bi-directional flow of data to and from as many as 39 segments daisy-chained to form a single cluster of segments. 4) Upgrade of the 36 subaperture Hartmann type Wave Front Sensor (WFS) of the Phased Array Mirror, Extendible Large Aperture (PAMELA) testbed at MSFC resulting in a 40 to 5OX improvement in SNR which in turn enabled NASA personnel to achieve many significant strides in improved closed-loop system operation in 1998. 5) A new system level processor was built and delivered to MSFC for use with the PAMELA testbed. This new system featured a new graphical user interface to replace the obsolete and non-supported menu system originally delivered with the PAMELA system. The hardware featured Blue Line's new stackable processing system which included fiber optic data links, a WFS digital interface, and a very compact and reliable electronics package. The project also resulted in substantial advances in the evolution of concepts for integrated structures to be used to support clusters of segments while also serving as the means to distribute power, timing, and data communications resources. A prototype cluster base was built and delivered that would support a small array of 7 cm mirror segments. Another conceptual design effort led to substantial progress in the area of laminated silicon mirror segments. While finished mirrors were never successfully produced in this exploratory effort, the basic feasibility of the concept was established through a significant amount of experimental development in microelectronics processing laboratories at the University of Colorado in Colorado Springs. Ultimately lightweighted aluminum mirrors with replicated front surfaces were produced and delivered as part of a separate contract to develop integrated segmented mirror assemblies. Overall the project was very successful in advancing segmented mirror system architectures on several fronts. In fact, the results of this work have already served as the basic foundation for the system architectures of several projects proposed by Blue Line for different missions and customers. These include the NMSD and AMSD procurements for NASA's Next Generation Space Telescope, the HET figure maintenance system, and the 1 meter FAST telescope project.

Ames, Gregory H.↗

Can practice eliminate the psychological refractory period effect?

Can people learn to perform two tasks at the same time without interference? To answer this question, the authors trained 6 participants for 36 sessions in a Psychological Refractory Period (PRP) experiment, where Task 1 required a speeded vocal response to an auditory stimulus and Task 2 required a speeded manual response to a visual stimulus. The large PRP effect found initially (353 ms in Session 1) shrank to only about 40 ms over the course of practice, disappearing entirely for 1 of the 6 participants. This reduction in the PRP effect with practice is considerably larger than has been previously reported. The obtained pattern of factor interactions between stimulus onset asynchrony and each of three task difficulty manipulations (Task 1 judgment difficulty, Task 2 stimulus contrast, and Task 2 mapping compatibility) supports a postponement (bottleneck) account of dual-task interference, both before and after practice.

Pitch Perception/physiology↗

Aspirating Seal Development: Analytical Modeling and Seal Test Rig

This effort is to develop large diameter (22 - 36 inch) Aspirating Seals for application in aircraft engines. Stein Seal Co. will be fabricating the 36-inch seal(s) for testing. GE's task is to establish a thorough understanding of the operation of Aspirating Seals through analytical modeling and full-scale testing. The two primary objectives of this project are to develop the analytical models of the aspirating seal system, to upgrade using GE's funds, GE's 50-inch seal test rig for testing the Aspirating Seal (back-to-back with a corresponding brush seal), test the aspirating seal(s) for seal closure, tracking and maneuver transients (tilt) at operating pressures and temperatures, and validate the analytical model. The objective of the analytical model development is to evaluate the transient and steady-state dynamic performance characteristics of the seal designed by Stein. The transient dynamic model uses a multi-body system approach: the Stator, Seal face and the rotor are treated as individual bodies with relative degrees of freedom. Initially, the thirty-six springs are represented as a single one trying to keep open the aspirating face. Stops (Contact elements) are provided between the stator and the seal (to compensate the preload in the fully-open position) and between the rotor face and Seal face (to detect rub). The secondary seal is considered as part of the stator. The film's load, damping and stiffness characteristics as functions of pressure and clearance are evaluated using a separate (NASA) code GFACE. Initially, a laminar flow theory is used. Special two-dimensional interpolation routines are written to establish exact film load and damping values at each integration time step. Additionally, other user-routines are written to read-in actual pressure, rpm, stator-growth and rotor growth data and, later, to transfer these as appropriate loads/motions in the system-dynamic model. The transient dynamic model evaluates the various motions, clearances and forces as the seals are subjected to different aircraft maneuvers: Windmilling restart; start-ground idle; ground idle-takeoff; takeoff-burst chop, etc. Results of this model show that the seal closes appropriately and does not ram into the rotor for all of the conditions analyzed. The rig upgrade design for testing Aspirating Seals has been completed. Long lead-time items (forgings, etc.) have been ordered.

Bharat Bagepalli↗

Practice Drastically Reduces Interference in the Psychological Refractory Period Paradigm

Six subjects were given 36 sessions of practice in a PRP paradigm. Task 1 required vocal responses, while Task 2 required manual responses. Unlike previous experiments with two manual response tasks, practice dramatically reduced the size of the PRP interference, from an initial 353 msec to only 40 msec. Analysis of factor interactions support a central bottleneck model of Task 2 postponement both early and late in practice.

VanSelst, Mark↗

Design of impact-resistant boron/aluminum large fan blade

The technical program was comprised of two technical tasks. Task 1 encompassed the preliminary boron/aluminum fan blade design effort. Two preliminary designs were evolved. An initial design consisted of 32 blades per stage and was based on material properties extracted from manufactured blades. A final design of 36 blades per stage was based on rule-of-mixture material properties. In Task 2, the selected preliminary blade design was refined via more sophisticated analytical tools. Detailed finite element stress analysis and aero performance analysis were carried out to determine blade material frequencies and directional stresses.

Salemme, C. T.↗

Astronomical observations with an SEC vidicon system.

Description of the design and operation of an SEC vidicon camera system, and review of some of the astronomical observations performed with it. Following a discussion of the main system and instrumentation features and a delineation of present and future software tasks, the preliminary series of observations obtained in conjunction with the 36-inch telescope at Kitt Peak National Observatory is briefly surveyed. These observations include (1) exposures on the Orion Nebula through various narrow-band interference filters, and (2) exposures on the galaxy Messier 82 in white light and with medium band filters.

Chiu, H.-Y.↗

Evaluation of Aerobic Capacity in Relation to Simulated Lunar Surface Extravehicular Activities

INTRODUCTION Astronauts will need to be physically prepared to successfully execute strenuous Extravehicular Activities (EVA)on the Lunar surface. Compared to Apollo missions, Artemis missions will include EVAs of increased physical demand, frequency, and duration, thus requiring adequate fitness to successfully and safely complete mission objectives and potential contingency scenarios. Currently, aerobic fitness standards for partial gravity (g)surface EVAs are not well supported by high-fidelity EVA analog data. This investigation aims to characterize metabolic demands from Lunar analog EVA simulations in relation to the current NASA standards for celestial partial-g aerobic fitness(aerobic capacity (VO2pk) ≥36.5ml/kg/min). METHODS To evaluate current Lunar EVA aerobic fitness requirements, a pilot study was performed to characterize metabolic ratesduring6 hour simulated EVAs. The EVAs were performed in pressurized MKIII (n=2male) and xEMU (n=3 female) spacesuits offloaded to 1/6 g in the NASA Active Response Gravity Offload System. VO2pk was assessed via graded exercise testing on acycle ergometer and physical workload was quantified as percent ofVO2pk. RESULTS Four out of five subjects did not meet the current NASA celestial surface EVA aerobic standard (3 xEMU, 1MKIII;35.1±0.9 ml/kg/min). During simulated EVAs, subjects (xEMU: 35±1ml/kg/min; MKIII: 44±10ml/kg/min) worked at an average 36%VO2pk(xEMU) and 31% VO2pk(MKIII). For xEMU subjects, the tasks with the greatest average metabolic rates were 2km treadmill traverse(0% grade: 47.2%VO2pk[max 69.1%]), object relocation (45.2%VO2pk[max 60.5%]), and 1.5km traverse (0% grade: 45%VO2pk[max 59.7%]). For MKIII subjects, the tasks with the greatest average metabolic rates were 0.5km treadmill traverse (30% grade: 35.4% VO2pk[max 45.5%]), object relocation(31% VO2pk[max 40.8%]), and treadmill traverse (0% grade: 29.9%VO2pk[max 45.9%]). CONCLUSIONS While average metabolic rates for simulated Lunar EVA fall within sustainable work ranges of30–40% VO2pkand life support system limitations, task-specific metabolic rates exceed this range and may indicate that greater fitness is necessary for more strenuous tasks expected to be performed on the Lunar surface. As few subjects met the standard, more data is needed to adequately evaluate the NASA 3001 standard.

N C Strock↗

Spacecraft command verification: The AI solution

Recently, a knowledge-based approach was used to develop a system called the Command Constraint Checker (CCC) for TRW. CCC was created to automate the process of verifying spacecraft command sequences. To check command files by hand for timing and sequencing errors is a time-consuming and error-prone task. Conventional software solutions were rejected when it was estimated that it would require 36 man-months to build an automated tool to check constraints by conventional methods. Using rule-based representation to model the various timing and sequencing constraints of the spacecraft, CCC was developed and tested in only three months. By applying artificial intelligence techniques, CCC designers were able to demonstrate the viability of AI as a tool to transform difficult problems into easily managed tasks. The design considerations used in developing CCC are discussed and the potential impact of this system on future satellite programs is examined.

Fesq, Lorraine M.↗

MODIS On-orbit Calibration: Key Issues and Approaches

MODIS, one of the key instruments for the NASA's Earth Observing System (EOS), is currently operating on both the Terra and Aqua spacecraft making continuous observations in 36 spectral bands from 0.4 to 14.4 micrometers. A complete suite of on-board calibrators (OBC) have been designed for the instruments' on-orbit calibration and characterization, including a solar diffuser (SD) and solar diffuser stability monitor (SDSM) system for the radiometric calibration of the 20 reflective solar bands (RSB), a blackbody (BB) for the radiometric calibration of the 16 thermal emissive bands (TEZB), and a spectro-radiometric calibration assembly (SRCA) for the sensors' spatial and spectral characterization. The task of continuously performing high quality on-orbit calibration and characterization of all 36 spectral bands with a total of 490 detectors located on four focal plane assemblies is extremely challenging. The use of a large two-sided paddle wheel scan mirror with a +/- 55 deg scan angle range and a retractable pinhole attenuation screen in front of the SD panel for calibrating the high gain bands have resulted in additional unanticipated complexity. In this paper, we describe some of the key issues in the Terra and Aqua MODIS on-orbit calibration and characterization, and discuss the methods developed to solve these problems or to reduce their impact on the Level 1B calibration algorithms. Instrument performance and current issues are also presented.

Xiong, Xian-Xiong↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity

The transition between gravity environments will involve one of the most complex, high-risk phases of exploration missions. The reduced functional capacity caused by physiological deconditioning adaptations in microgravity coupled with the stressors of re-entry into partial gravity environments will increase risks to crew, even with rigorous adherence to inflight countermeasures. Specifically, two high-risk scenarios may be required to be performed soon after gravity transitions: 1) nominal and/or emergency unassisted capsule egress task after return to Earth, and 2) planetary extravehicular activity (EVA) soon after landing on Mars or the Moon. Quantification of crewmember’s functional performance after long-duration spaceflight is necessary to inform concepts of operations for future exploration missions. The overarching aim of this study is to quantify post-landing functional performance with deconditioning after long-duration ISS missions. This study is broken down into two phases. Phase 1 includes a pilot study to assess the overall feasibility and demonstrate the capability to perform mission-like tasks shortly after landing. Phase 2, the Egress Fitness study, which is part of the Complement of Integrated Protocols for Human Exploration Research (CIPHER), uses a task-based approach to characterize functional performance in long-duration ISS crewmembers before flight and shortly after return to Earth. The pilot and full Egress Fitness study includes pre-flight and post-flight testing of simulated emergency egress out of a functional capsule mockup and a Mars gravity EVA simulation at the Active Response Gravity Offload System (ARGOS) facility. The EVA simulation tasks include suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. The post-flight simulated capsule egress test occurs 1–4 h after landing and the planetary EVA simulation occurs 18–36 h after landing. The full CIPHER Egress Fitness study has additional pre-flight sessions, longer EVA tasks that include traverse and geology sampling, and post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery. The Pilot Egress Fitness study has completed baseline and post-flight testing on four crewmembers. All subjects were able to complete the post-flight simulated planetary EVA; three subjects were able to complete the postflight capsule egress simulation. CIPHER study data collection is ongoing. This study will quantify post-landing functional performance in operationally relevant simulations to help inform future planetary concepts of operations shortly after landing.

egress↗

CIPHER: Egress Fitness

The transition between gravity environments will involve one of the most complex, high-risk phases of exploration missions. The reduced functional capacity caused by physiological deconditioning adaptations in microgravity coupled with the stressors of re-entry into partial gravity environments will increase risks to crew, even with rigorous adherence to inflight countermeasures. Specifically, two high-risk scenarios may be required to be performed soon after gravity transitions: 1) nominal and/or emergency unassisted capsule egress task after return to Earth, and 2) planetary extravehicular activity (EVA) soon after landing on Mars or the Moon. Quantification of crewmember’s functional performance after long-duration spaceflight is necessary to inform concepts of operations for future exploration missions. The overarching aim of this study is to quantify post-landing functional performance with deconditioning after long-duration ISS missions. This study is broken down into two phases. Phase 1 includes a pilot study to assess the overall feasibility and demonstrate the capability to perform mission-like tasks shortly after landing. Phase 2, the Egress Fitness study, which is part of the Complement of Integrated Protocols for Human Exploration Research (CIPHER), uses a task-based approach to characterize functional performance in long-duration ISS crewmembers before flight and shortly after return to Earth. The pilot and full Egress Fitness study includes pre-flight and post-flight testing of simulated emergency egress out of a functional capsule mockup and a Mars gravity EVA simulation at the Active Response Gravity Offload System (ARGOS) facility. The EVA simulation tasks include suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. The post-flight simulated capsule egress test occurs 1–4 h after landing and the planetary EVA simulation occurs 18–36 h after landing. The full CIPHER Egress Fitness study has additional pre-flight sessions, longer EVA tasks that include traverse and geology sampling, and post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery. Pilot Egress Fitness has completed baseline and post-flight testing on four crewmembers. That study remains open. Originally this was to cover the Boeing CFT mission, but now also includes private astronauts on commercial spaceflights. CIPHER study data collection is ongoing with 2 subjects completed and 4 additional subjects consented. This study will quantify post-landing functional performance in operationally relevant simulations to help inform fitness for duty standards and future planetary concepts of operations shortly after landing.

Jason Norcross↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity

The transition between gravity environments will involve one of the most complex, high-risk phases of any mission. For example, the reduced functional capacity caused by physiological deconditioning adaptations in microgravity coupled with the stressors of re-entry into partial gravity environments will increase risks to crew, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk scenarios may be required to be performed soon after gravity transitions: • Nominal and/or emergency unassisted capsule egress task after return to Earth • Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study is broken down into two phases. Phase 1: A feasibility study that will assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing. Phase 2: the full Egress Fitness study, which is part of the CIPHER complement. This study uses a task-based approach to characterize functional performance of these high-risk scenarios in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and a mobility assessment to confirm completion of the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth-based emergency egress out of a functional capsule mockup and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing will occur at any time point prior to flight. Post-flight assessment is much more critical with the capsule egress test that will occur 1–4 hours after landing and the planetary EVA approximately 18–36 hours after landing. The CIPHER study will incorporate additional pre-flight sessions, longer EVA tasks that include traverse and geology sampling, and post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery. Data collected for both tasks include task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed both baseline and post-flight testing on four astronaut subjects, with all four able to complete post-flight EVA testing and three able to complete postflight capsule egress testing. Preliminary results observe individual physiological variations, which were to be expected but also suggest the need to carefully track the timeline from undock to landing to testing. Furthermore, some task performance instructions and equipment may need to be adjusted to ensure results are primarily physiological. These and other lessons learned will be addressed with minor protocol changes in the full CIPHER Egress Fitness study.

J R Norcross↗

Speed of mental processing in the middle of the night

This study aimed to determine whether human mental processing actually slows down during the night hours, separately from the previously documented microsleeps, lapses in attention, and general slowing of motor responses. Eighteen healthy young adults were studied during 36 hours of constant wakeful bedrest. Every 2 hours, they performed a logical reasoning task. Items phrased in the negative voice took reliably longer to respond to than items phrased in the positive voice, indicating the need for more mental processing in those items. By subtracting "negative" from "positive" reaction times at each time of day, we were able to plot a circadian rhythm in the time taken for this extra mental processing to be done separately from microsleeps, psychomotor slowing, and inattention. The extra mental processing took longer at night and on the day following sleep loss than it did during the day before the sleep loss, suggesting that human mental processing slows down during the night under sleep deprivation.

Non-NASA Center↗

Effects of illumination on human nocturnal serum melatonin levels and performance

In humans, exposure to bright light at night suppresses the normal nocturnal elevation in circulating melatonin. Oral administration of pharmacological doses of melatonin during the day, when melatonin levels are normally minimal, induces fatigue. To examine the relationship between illumination, human pineal function, and behavior, we monitored the overnight serum melatonin profiles and behavioral performance of 24 healthy male subjects. On each of three separate occasions subjects participated in 13.5 h (1630-0800 h) testing sessions. Each subject was assigned to an individually illuminated workstation that was maintained throughout the night at an illumination level of approximately 300, 1500, or 3000 lux. Melatonin levels were significantly diminished by light treatment, F(2, 36) = 12.77, p < 0.001, in a dose-dependent manner. Performance on vigilance, reaction time, and other tasks deteriorated throughout the night, consistent with known circadian variations in these parameters, but independent of ambient light intensity and circulating melatonin levels.

NASA Program Space Physiology and Countermeasures↗

Advanced microwave radiometer antenna system study

The practicability of a multi-frequency antenna for spaceborne microwave radiometers was considered in detail. The program consisted of a comparative study of various antenna systems, both mechanically and electronically scanned, in relation to specified design goals and desired system performance. The study involved several distinct tasks: definition of candidate antennas that are lightweight and that, at the specified frequencies of 5, 10, 18, 22, and 36 GHz, can provide conical scanning, dual linear polarization, and simultaneous multiple frequency operation; examination of various feed systems and phase-shifting techniques; detailed analysis of several key performance parameters such as beam efficiency, sidelobe level, and antenna beam footprint size; and conception of an antenna/feed system that could meet the design goals. Candidate antennas examined include phased arrays, lenses, and optical reflector systems. Mechanical, electrical, and performance characteristics of the various systems were tabulated for ease of comparison.

Kummer, W. H.↗