Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technology Evaluation Environmental Risk Mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Technology Evaluation for Environmental Risk Mitigation Compendium

The Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center and its predecessor organization the Acquisition Pollution Prevention Program (AP2) supported the National Aeronautics and Space Administration (NASA) in identifying technology solutions to risks and costs to NASA programs driven by environmental regulations and requirements. TEERM researched the commercial and government marketplace to locate viable and available technologies that met NASAs needs. TEERM focused on addressing environmentally-driven risks of direct concern to NASA programs and facilities, including hazardous materials in NASA operations and materials that became obsolescent because of environmental regulations. TEERM projects aimed to reduce cost; ensure the health and safety of people, assets, and the environment; promote efficiency; and minimize duplication. Major TEERM and AP2 projects focused on waste minimization and hazardous waste treatment, recycling, corrosion prevention and control, solvent and ozone depleting substances substitution, and aqueous based cleaners. In 2017, NASA made the decision to terminate the TEERM Principal Center. This Compendium Report documents TEERM and AP2 project successes. The Compendium Report traces the evolution of TEERM based on evolving risks and requirements for NASA and its relationship to the Space Shuttle Program, the United States Department of Defense, the European Space Agency, and other public and private stakeholders. This Compendium Report also documents project details from Project Summaries and Joint Test Plans and describes project stakeholders and collaborative effort results.

material obsolescent↗

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗

QuEST: Qualifying Environmentally Sustainable Technologies

Articles in this issue inlude: (1) Foundation of Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) Technology Evaluation is Testing and Qualification, (2) Materials Management and Substitution Efforts, (3 Recycling and Pollution Control Efforts, and (4) Remediation Efforts

Lewis, Pattie↗

NASA Collaborative Approach Mitigates Environmentally-Driven Obsolescence

National Aeronautics and Space Administration (NASA) missions, like Department of Defense (DoD) organizations, require the rigorous testing and qualification of critical materials. Obsolescence supply risks created by environmental requirements can affect the cost, schedule and performance of NASA missions and the resilience of critical infrastructure. The NASA Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center helps to identify obsolescence supply risks driven by environmental requirements and works proactively with NASA Centers and Programs, the DoD, the European Space Agency (ESA) and other agencies and partners to identify and evaluate environmentally friendly alternatives. TEERM tracks environmental regulations, identifies the potential loss of material availability and works with NASA programs and Centers to evaluate potential impacts through a risk assessment approach. TEERM collaborative projects identify, demonstrate and evaluate commercially viable alternative technologies and materials. A major focus during the Space Shuttle Program was the need to replace ozone depleting substances that were used in spray foam and cleaning applications. The potential obsolescence of coatings containing hexavalent chromium and the risks associated with lead free solder were also of concern for the Space Shuttle and present ongoing risks to new programs such as the Space Launch System. One current project teams NASA and ESA in the evaluation and testing of individual coatings and coating systems as replacements for hexavalent chromium coatings in aerospace applications. The proactive, collaborative approach used by TEERM helps reduce the cost burden on any one team partner, reduces duplication of effort, and enhances the technical quality and overall applicability of the testing and analysis.

environmentall-driven obsolescence↗

NASA TEERM Principal Center Non-Chrome Projects

Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center Mission is to identify and validate environmental technologies through joint activities that enhance mission readiness and reduce risk while minimizing duplication and associated costs.

Rothgeb, Matthew↗

Project Profile: Hydrogen Fuel Cell Mobile Lighting Tower (HFCML)

NASA is committed to finding innovative solutions that improve the operational performance of ground support equipment while providing environment and cost benefits, as well. Through the Hydrogen Fuel Cell Mobile Lighting Tower (HFCML) project, NASA gained operational exposure to a novel application of high efficiency technologies. Traditionally, outdoor lighting and auxiliary power at security gates, launch viewing sites, fallback areas, outage support, and special events is provided by diesel generators with metal halide lights. Diesel generators inherently contribute to C02, NOx, particulate emissions, and are very noisy. In 2010, engineers from NASA's Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) introduced KSC operations to a novel technology for outdoor lighting needs. Developed by a team led by Sandia National Laboratory (SNL), the technology pairs a 5kW hydrogen fuel cell with robust high efficiency plasma lights in a towable trailer. Increased efficiency, in both the fuel cell power source and lighting load, yields longer run times between fueling operations while providing greater auxiliary power. Because of the unit's quiet operation and no exhaust fumes, it is capable of being used indoors and in emergency situations, and meets the needs of all other operational roles for metal halide/diesel generators. The only discharge is some water and warm air. Environmental benefits include elimination of diesel particulate emissions and estimated 73% greenhouse gas emissions savings when the hydrogen source is natural gas (per GREET model). As the technology matures the costs could become competitive for the fuel cell units which are approximately 5 times diesel units. Initial operational . concerns included the hydrogen storage tanks and valves, lightning safety/grounding, and required operating and refueling procedures. TEERM facilitated technical information exchange (design drawings, technical standards, and operations manuals) necessary for KSC hydrogen system experts to approve use of the HFCML unit, including initiating the environmental checklist (i.e. exterior lighting waiver due to sea turtles), and development of operations and maintenance instructions. TEERM worked with SNL to establish a bailment agreement for KSC to utilize a Beta unit as part of normal Center Operations for a period of twelve months.

McLaughlin, Russell↗

QuEST: Qualifying Environmentally Sustainable Technologies

This is an exciting new chapter for the NASA Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM). The Principal Center's past successes have created new opportunities for partnership and technology implementation. TEERM is continuing to support the current NASA Programs while reaching out and offering our assistance and experience to Constellation. NASA has also assumed Chairmanship responsibility of the Joint Group on Pollution Prevention (JG-PP) and Chairmanship of the JG-PP Working Group (WG). Both JG-PP and TEERM strive to improve mission readiness and reduce risk to personnel and assets by solving joint problems through cooperation. JG-PP and TEERM not only show our commitment to environmental stewardship, but also our commitment to fiscal responsibility.

Lewis, Pattie↗

QuEST: Qualifying Environmentally Sustainable Technologies

QuEST is a publication of the NASA Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM). This issue contains brief articles on: Risk Identification and Mitigation, Material Management and Substitution Efforts--Hexavalent Chrome-free Coatings and Low volatile organic compounds (VOCs) Coatings, Lead-Free Electronics, Corn-Based Depainting Media; Alternative Energy Efforts Hydrogen Sensors and Solar Air Conditioning. Other TEERM Efforts include: Energy and Water Management and Remediation Technology Collaboration.

Lewis, Pattie↗

NASA and ESA Collaboration on Alternative to Nitric Acid Passivation: Parameter Optimization of Citric Acid Passivation for Stainless Steel Alloys

National Aeronautics and Space Administration (NASA) Headquarters chartered the Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of NASA TEERM are to: Reduce or eliminate the use of hazardous materials or hazardous processes at manufacturing, remanufacturing, and sustainment locations. Avoid duplication of effort in actions required to reduce or eliminate hazardous materials through joint center cooperation and technology sharing. Corrosion is an extensive problem that affects the National Aeronautics and Space Administration (NASA) and the European Space Agency (ESA). The damaging effects of corrosion result in steep costs, asset downtime affecting mission readiness, and safety risks to personnel. Consequently, it is vital to reduce corrosion costs and risks in a sustainable manner. NASA and ESA have numerous structures and equipment that are fabricated from stainless steel. The standard practice for protection of stainless steel is a process called passivation. Passivation is defined by The American Heritage Dictionary of the English Language as to treat or coat (a metal) in order to reduce the chemical reactivity of its surface. Passivation works by forming a shielding outer (metal oxide) layer that reduces the impact of destructive environmental factors such as air or water. Consequently, this process necessitates a final product that is very clean and free of iron and other contaminants. Typical passivation procedures call for the use of nitric acid; however, there are a number of environmental, worker safety, and operational issues associated with its use. Citric acid is an alternative to nitric acid for the passivation of stainless steels. Citric acid offers a variety of benefits including increased safety for personnel, reduced environmental impact, and reduced operational cost. The primary objective of this effort is to qualify citric acid as an environmentally-preferable alternative to nitric acid for the passivation of stainless steel alloys. While citric acid use has become more prominent in industry, there is little evidence that citric acid is a technically sound passivation agent, especially for the unique and critical applications encountered by NASA and ESA.

citric acid passivation↗

QuEST: Qualifying Environmentally Sustainable Technologies, Volume 5

This edition of the QuEST newsletter contains brief articles that discuss the NASA Technology Evaluation for Environmental Risk Mitigation (TEERM) program, and the importance of collaboration, efforts in materials management and substitution for coatings for launch structures, Low volatile organic compound (VOC) Coatings Field Testing, Non-Chrome Coating Systems, Life Cycle Corrosion Testing, Lead-Free Electronics Testing and Corn Based Depainting and efforts in Pollution Control in the area of Hypergolic Propellant Destruction Evaluation, efforts in development of alternative energy in particular Hydrogen Sensors, Energy and Water Management, and efforts in remediation in the removal of Polychlorinated Biphenyl (PCB) contamination

Lewis, Pattie↗

NASA TEERM Hexavalent Chrome Alternatives Projects

This slide presentation reviews the NASA/DOD projects to select an alternative to hexavalent chrome in the aerospace industry. The Phase I process of the project performed: (1) Evaluation and testing of non-chromated coating systems as replacements for hexavalent chrome coatings in aircraft and aerospace applications. (2) Testing of coating systems to DoD and NASA specifications for corrosion resistance and adhesion. (3) Bare corrosion resistance and atmospheric exposure will be focus areas of Phase II Testing. The description includes a chart that summarizes the 3000 hour salt fog test results. The second phase of the project includes (1) Evaluation and testing of coating systems that do not contain hexavalent chrome as replacements for aerospace applications. (2) Evaluation of coatings at Beach Test Site and Launch Complex 39B (3) Evaluation of non-chrome coatings for electronic housings (bare corrosion resistance and electrical impedance) is a part of this round of testing. This project was performed for the Technology Evaluation for Environmental Risk Mitigation (TEERM)

Rothgeb, Matt↗

NASA TEERM Hexavalent Chrome Alternatives Projects

This slide presentation reviews the NASA project to select an alternative to hexavalent chrome in the aerospace industry. Included is a recent historic testing and research that the Agency has performed on (1) the external tank, (2) the shuttle orbiter, (3) the Shuttle Rocket Booster, and (4) the Space Shuttle Main Engine. Other related Technology Evaluation for Environmental Risk Mitigation (TEERM) projects are reviewed. The Phase I process of the project performed testing of alternatives the results are shown in a chart for different coating systems. International collaboration was also reviewed. Phase II involves further testing of pretreatment and primers for 6 and 12 months of exposure to conditions at Launch Pad and the beach. Further test were performed to characterize the life cycle corrosion of the space vehicles. A new task is described as a joint project with the Department of Defense to identify a Hex Chrome Free Coatings for Electronics.

Kessel, Kurt↗

QuEST: Qualifying Environmentally Sustainable Technologies

In 2004, in one of their first collaborative efforts, Centro Para Prevencao da Poluicao (Portuguese Center for Pollution Prevention or C3P). teamed with Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) and two Portuguese entities, TAP Portugal (Portuguese National Airline) and OGMA Indtistria Aeron utica de Portugal (Portuguese Aeronautics Industry), to target the reduction of hexavalent chromium, cadmium, and volatile organic compounds (VOCs) in aircraft maintenance operations. This project focused on two coating systems that utilize non-chrome pretreatments and low-VOC primers and topcoats.

Lewis, Pattie L.↗

Full-scale validation gaps and opportunities for low-head hydropower: a review and perspective

Hydropower is undergoing technological innovation as future development increasingly targets low-head sites (<10 m), primarily through retrofits, rehabilitation, and upgrades of existing infrastructure. This shift toward smaller systems creates a timely opportunity: unlike conventional large projects, many emerging low-head technologies may be small enough for direct full-scale validation. Full-scale testing is particularly important for environmental mitigation technologies, including fish passage, sediment continuity, and water-quality improvements, whose performance is difficult to assess reliably using reduced-scale models. Yet adoption remains constrained by the limited risk-bearing capacity of small hydropower owners, discouraging manufacturers from bringing unvalidated technologies to market. This review and perspective paper examines hydropower trends driving innovation, selected emerging technologies, conventional testing methods, and current U.S. testing capabilities as a case study. We then evaluate the gap between existing capabilities and the needs of low-head powertrains and environmental mitigation measures. Many technologies exceed existing facility flow capacities; in the U.S., the highest combined head–flow capability is limited to 5.66 m3/s, compared with median and 90th-percentile low-head turbine-unit flows of 14.3 and 60 m3/s. To mitigate this gap, we advocate repurposing large, retired, or underused hydraulic infrastructure as full-scale testing facilities to reduce first-adoption risk and support sustainable low-head hydropower deployment.

Tseng, Chien-Yung [Colorado State University, Fort↗

Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry in the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal) 3 project sizes: pilot, small commercial, and large commercial The possible combinations total 24 wave technology scenarios and 9 tidal technology scenarios. We evaluated 3 of the 33 scenarios in detail: 1. A small commercial OPT Power Buoy project off the Humboldt County, California coast 2. A small commercial Pelamis Wave Power P-2 project off Makapu’u Point, Oahu, Hawaii 3. A pilot MCT SeaGen tidal project, sited in the Tacoma Narrows, Washington. This framework document used information available from permitting documents that were written to support actual wave or tidal energy projects, but the results obtained here should not be confused with those of the permitting documents1. The main difference between this framework document and permitting documents of currently proposed pilot projects is that this framework identifies key environmental concerns and describes the next steps in addressing those concerns; permitting documents must identify effects, find or declare thresholds of significance, evaluate the effects against the thresholds, and find mitigation measures that will minimize or avoid the effects so they can be considered less-than-significant. Two methodologies, 1) an environmental effects analysis and 2) Raptools, were developed and tested to identify potential environmental effects associated with wave or tidal energy conversion projects. For the environmental effects analysis, we developed a framework based on standard risk assessment techniques. The framework was applied to the three scenarios listed above. The environmental effects analysis addressed questions such as: What is the temporal and spatial exposure of a species at a site? What are the specific potential project effects on that species? What measures could minimize, mitigate, or eliminate negative effects? Are there potential effects of the project, or species’ response to the effect, that are highly uncertain and warrant additional study? The second methodology, Raptools, is a collaborative approach useful for evaluating multiple characteristics of numerous siting or technology alternatives, and it allows us to graphically compare alternatives. We used Raptools to answer these questions: How do the scenarios compare, in terms of exposure, risks, and effects to the ecological and human environments? Are there sites that seem to present the fewest effects regardless of technology and scale? Which attributes account for many or much of the effects associated with wave or tidal energy development?

Energy↗

Applying Risk Science and Stakeholder Engagement to Overcome Environmental Barriers to Marine and Hydrokinetic Energy Projects

The production of electricity from the moving waters of the ocean has the potential to be a viable addition to the portfolio of renewable energy sources worldwide. The marine and hydrokinetic (MHK) industry faces many hurdles, including technology development, challenges of offshore deployments, and financing; however, the barrier most commonly identified by industry, regulators, and stakeholders is the uncertainty surrounding potential environmental effects of devices placed in the water and the permitting processes associated with real or potential impacts. Regulatory processes are not well positioned to judge the severity of harm due to turbines or wave generators. Risks from MHK devices to endangered or protected animals in coastal waters and rivers, as well as the habitats that support them, are poorly understood. This uncertainty raises concerns about catastrophic interactions between spinning turbine blades or slack mooring lines and marine mammals, birds and fish. In order to accelerate the deployment of tidal and wave devices, there is a need to sort through the extensive list of potential interactions that may cause harm to marine organisms and ecosystems, to set priorities for regulatory triggers, and to direct future research. Identifying the risk of MHK technology components on specific marine organisms and ecosystem components can separate perceived from real risk-relevant interactions. Scientists from Pacific Northwest National Laboratory (PNNL) are developing an Environmental Risk Evaluation System (ERES) to assess environmental effects associated with MHK technologies and projects through a systematic analytical process, with specific input from key stakeholder groups. The array of stakeholders interested in the development of MHK is broad, segmenting into those whose involvement is essential for the success of the MHK project, those that are influential, and those that are interested. PNNL and their partners have engaged these groups, gaining valuable information, gathering pertinent feedback on the efficacy of the process, and providing a level of ownership for the risk evaluation process that will encourage adoption of the outcome to inform future MHK siting and permitting decisions. The ERES development process provides the scientific structure to support risk characterization, comparison of tradeoffs, and risk-informed decision-making by project and technology developers, regulatory agencies, and other interested stakeholders. The PNNL team will determine the range and severity of environmental effects of MHK development, leading to the development of mitigation strategies where residual risk remains.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT WASTE PROCESSING ANNUAL TECHNOLOGY DEVELOPMENT REPORT 2008

The Office of Waste Processing identifies and reduces engineering and technical risks and uncertainties of the waste processing programs and projects of the Department of Energy's Environmental Management (EM) mission through the timely development of solutions to technical issues. The risks, and actions taken to mitigate those risks, are determined through technology readiness assessments, program reviews, technology information exchanges, external technical reviews, technical assistance, and targeted technology development and deployment. The Office of Waste Processing works with other DOE Headquarters offices and project and field organizations to proactively evaluate technical needs, identify multi-site solutions, and improve the technology and engineering associated with project and contract management. Participants in this program are empowered with the authority, resources, and training to implement their defined priorities, roles, and responsibilities. The Office of Waste Processing Multi-Year Program Plan (MYPP) supports the goals and objectives of the U.S. Department of Energy (DOE) - Office of Environmental Management Engineering and Technology Roadmap by providing direction for technology enhancement, development, and demonstration that will lead to a reduction of technical risks and uncertainties in EM waste processing activities. The MYPP summarizes the program areas and the scope of activities within each program area proposed for the next five years to improve safety and reduce costs and environmental impacts associated with waste processing; authorized budget levels will impact how much of the scope of activities can be executed, on a year-to-year basis. Waste Processing Program activities within the Roadmap and the MYPP are described in these seven program areas: (1) Improved Waste Storage Technology; (2) Reliable and Efficient Waste Retrieval Technologies; (3) Enhanced Tank Closure Processes; (4) Next-Generation Pretreatment Solutions; (5) Enhanced Stabilization Technologies; (6) Spent Nuclear Fuel; and (7) Challenging Materials. This report provides updates on 35 technology development tasks conducted during calendar year 2008 in the Roadmap and MYPP program areas.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗